Archaeology And Museums Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
430064Bid Award Id
ViewTender No
B1/329/2022-5, dated 09-06-2023 (4th CALL)Tender Authority
Archaeology And Museums Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Re Construction works;Removal of old palmona/fine dressed temple vargams, with LM (1:3)vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all using materials and labour charges etc, complete -for. (Pillars,Beams,Roof Stones and Prastra, Door frames etc, .(APSS-601,601.2.1)
3585
84
301140
Re Construction works;Removal of old palmona/fine dressed temple vargams, with LM (1:3) vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all necessary materials and labour charges etc, complete for (Foundation to Roof level i.e. (Adistanam, Upapeetam, Sthambavargam) & FLOORING )(APSS-601,601.2.1)
3145
56
176120
Re Construction works;Scaffolding charges for removal of temple vargams by providing mud ramp, ropes, wooden logs, crowbars and servi ballies etc, including cost of all necessary using materials and labour charges, etc, complete.(APSS-36)
6730
15
100950
Re Construction works;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including Seignorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
244
202
49288
Re Construction works;Filling the foundation of temple with aggregate i.e. 20mm &40mm (HBG) Metal with sand, Metal layer by layer 0'.6" rolling with Road roller etc, including cost and conveyance of all materials and labour charges etc complete, for Siva temple.(APSS-309)
130
5918
769340
Re Construction works;Plain Cement Concrete corresponding to M-15 grade as per IS 456 equivalent to (1:2.5:5) using 40, 20 & 10 mm HBG metal (Hand Mixing ) above ground level, 9" to 1' thick including cost of all materials and labour charges etc, complete.( APSS-402)
29
5297
153613
Re Construction works;Construction of CRS Masonry in Lime Mortar (1:2) 2nd Sort for foundation of temple including all operational, incidental, labour charges complete for finished item of work.(APSS-609, 610,611,612)
157
6682
1049074
Re Construction works;RR Masonry In Lime Mortar (1:3) prop using hearting portion in between CRS masonry walls, including cost and conveyance of all materials and labour charges, curing etc, complete finished item of work (APSS-609, 610,611,612)
23
5768
132664
Re Construction works;Filling with sand (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.(APSS-309,310)
100
1912
191200
Re Construction works;Requirement of new Stone for Missing portion of temple vargams from approved quarry including cost and conveyance of all materials and all labour charges etc, complete.( APSS-601, Table 601-A )
884
502
443768.33
Re Construction works;palmona/fine three line Dressing of New stone for trikuta temple flooring , and steps including cost and of all materials and labour charges etc, complete.
374
435
162690
Re Construction works;palmona/fine Dressing of New stone for trikuta temple Stambavargams Walls/ Roof Stone/ Konavattan& Chathuravattam, uttaravargam, kakshasanam, including cost and of all materials and albour charges etc, complete
1750
900
1575000
Re Construction works;Ornamental palmona/fine Dressing of New stone for trikuta temple Prastra vargam, including cost and of all materials and albour charges etc, complete
1086
1061
1152246
Re Construction works;Re-Construction of old palmona/fine dressed temple vargams, with vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all necessary using materials and labour charges etc, complete for (Foundation to Roof level(i.e. Upapeetam, Adistanam, Sthambavargam) & FLOORING ).(APSS-601)
3239
199
644561
Re Construction works;Re- Construction of old palmona/fine dressed temple vargams, with vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all using materials and labour charges etc, complete -for.(Pillars,Beams,Roof Stons and Prastra, Door frames etc (APSS-601)
4374
281
1229094
Re Construction works;Scaffolding charges for reconstruction of temple vargams by providing mud ramp, ropes, wooden logs, crowbars and servi ballies etc, including cost of all necessary using materials and labour charges, etc, complete. (APSS-36)
7613
15
114195
Re Construction works;Laying Lime Concrete . (1:3:6) prop, using 40mm (HBG) metal in between temple walls & temple Plinth protection including cost and conveyance of all materials and labour charges etc, complete at thrikuta temple.(APSS-401)
52
5865
304980
Re Construction works;Steel clamps should designed accordingly to the direction of engineer in charge conforming metal clamps IS - 4101(Part-1) the grabagruha/Vimana/outer veneering/roof slabs architectural members by using adhesive, steel dowels by making Necessary grooves in the stone members filling the gap with suitable fillet material and matching colour as per the site conditions etc., complete departmental in charge
90
914
82260
Re Construction works;Providing and Laying Lime concrete of (1:1.5:3)-Prop. Using 20mm to 40mm down size brick Aggregate jelly , to a required slop to easy run of water to existing channel, rammed to achieve 100% compaction and finished with gur and belgiri treatment including rounding of junctions with a parapet wall to avoid the leakage at concrete and parapet junction and curing by spreading fodder or gunny bags, Including cost of all materials and labour charges etc, complete. finished item of as directed by the Engineer-in- charge, (APSS-401)
12
10748
128976
Re Construction works;Terrace Water tightening work - Laying a layer of lime plaster of 25mm thick in LM (1: 1 1/2) Prop grinded twice. fixing terracotta tiles 150 x 150 x 12 mm thick in lime mortar pointing, applying a layer of LM (1:11/2)prop grinded twice of 25mm thick, and again fixing terracotta tiles 150 x 150 x 12 mm as second layer in lime mortar and applying 3rd layer of lime plaster of 25mm thick (1:11/2)prop grinded twice thick and finally cebara finish of 3mm thick (1:1) duly mixing ingredients during grinding such as Jaggery, alovera , karakkya, Jute , Eggs, etc, the grinding of lime mortar should be two times the gap in between two grand age should not be less than one month after 1st grinding it should be soaked for one month and grinded 2nd time. The obtained material shall be tested in lab to obtain required strength, plasticity and other requirements. The materials should used on acceptance of higher authorities in execution. the curing should be with karakaya with jaggery water on each layer independently until it achieve required strength under supervision of engineer in charge (APSS-807)
26
2693
70018
Re Construction works;laying Lime concrete -(1:3:6),with LM (1:3) prop, using 40mm metal with hand mixing for plinth protection for temple all round , including cost and conveyance of all materials and labour charges etc, complete.( APSS-401)
37
5865
217005
Re Construction works;Provide cut stone with granite slabs of Rudraram variety/local matching stone 75mm to 100mm thick of size(2'-0"X2'-0") with Two line palmana dressing for hard granite stone 20mm thick Lime mortar (1:3) Prop. Over Lime Concrete (1:3:6) Prop.100mm thick using 40mm HBG metal and pointed with Lime Mortar (1:11/2) Prop, including cost and conveyance of all materials and labour charges etc, complete at thrikuta temple .(APSS- 701 ,702)
237
2427
575199
Re Construction works;Deep pointing for temple wall with LM (1:1 1/2) prop,including cost and conveyance of all materials and labour charges scaffolding charges etc
380
188
71440
Re Construction works;Laying PCC (1:5:10) prop, using 40mm HBG metal for foundation of chainlink mesh fencing around the temple including cost and conveyance of all materials and labour charges etc complete.
20
4209
84180
Re Construction works;Consrtuction R.R Masonry for Compound wall in CM (1:6)for using HBG stones chainlink mesh fencing around the temple including cost of all materials and labour charges etc,.complete.
80
4455
356400
Re Construction works;Construction of CRS Masonry in CM (1:6) prop, using HBG stones in 2nd sort from approved quarry for chainlink mesh fencing around the temple including cost and conveyance of all materials and labour charges etc
50
5019
250950
Re Construction works;Flush Pointing with CM (1:3) to Brick / CRS Masonry wall including all operational, incidental, labour charges complete for finished item of work including cost and conveyance of all materials and labour charges etc complete
210
85
17850
Re Construction works;PCC Grade M15 - Nominal mix 1:2.5:5 (Hand mixing) using 20mm HBG metal including cost and conveyance of materials to site including seignorage fee, Hand mixing, concrete laying tamping, vibrating, watering curing and all labour charges, hire and operational charges of machinery, water lead charges and including bailing of water.etc. complete for finished item of work
10
7382
73820
Re Construction works;Supplying and fixing of Chain Link Mesh fencing using 2"x2"(50mmx50mm) 8mm Gauga Chain Link Mesh Fixing to the M.S. Angulars of size 50mmx50mmx6mm (10'-0") inbetween pole to pole and arrianging proper punching holes for binding the chain link mesh tightely over the basement and M.S. Angulars fixing in PCC (1:2.5:5) prop, NSO providing horizental that at the top complete with All materials and convayance to the site and labour charges for fixing etc, complete.
251
1064
267064
Re Construction works;Fabrication, erection and fixing of ISMB 50mmx100mm of web and flange thickness of 6mm 'I' Section girder of maximum length of 4mts meachanically using Chain pulley or Derrick pole to support the Erection of MS angular gate on South and east sides of Ashoor khana compound wall.complete with All materials and convayance to the site and labour charges for fixing etc, complete.
8
1079
8632
Re Construction works;Manufacturing, Supplying & fixing of New gate at temple welded with three Hooks and hinges on both sides of shutters to 'I' Section girders with outer Vertical & Horizontal M.S Hallow square pipes of size 50x50x6mm thick and inner Verticals,Horizontal and inclined M.S Hallow square pipess of size 30x30x3mm thick welded with each other and fixing gate handles and Department name (DEPT. OF HERITAGE) on the gates and applying of single coat red oxide and two coats of enamel paint Including cost of all materials and labour charges etc, complete. finished item of work as directed by the Engineer-in- charge.
10
3462
34620