Archaeology And Museums Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Archaeology And Museums Department Tender

Civil And Construction
Civil Works Others
Opening Date22 Jun 2023
Closing Date30 Jun 2023
Tender Amount₹ 1,79,26,400 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Re Construction works;Chipping removing of old dead lime mortar surkhi concrete on terrace of thrikuta temple and disposal of unserviceable materials within 100 meters lead including cost of all materials and labour charges etc, complete, (APSS-812,812.1.2)

44

679

29876

... More
Re Construction works;Removal of old palmona/fine dressed temple vargams, with LM (1:3)vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all using materials and labour charges etc, complete -for. (Pillars,Beams,Roof Stones and Prastra, Door frames etc, .(APSS-601,601.2.1)

4444

84

373296

... More
Re Construction works;Removal of old palmona/fine dressed temple vargams, with LM (1:3) vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all necessary materials and labour charges etc, complete for (Foundation to Roof level i.e. (Adistanam, Upapeetam, Sthambavargam) & FLOORING )(APSS-601,601.2.1)

6160

56

344960

... More
Re Construction works;Scaffolding charges for removal of temple vargams by providing mud ramp, ropes, wooden logs, crowbars and servi ballies etc, including cost of all necessary using materials and labour charges, etc, complete.(APSS-36)

10604

15

159060

... More
Re Construction works;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including Seignorage excluding dewatering charges etc as per SS - 20 B (APSS 308)

400

202

80800

... More
Re Construction works;Filling the foundation of temple with aggregate i.e. 20mm &40mm (HBG) Metal with sand, Metal layer by layer 0'.6" rolling with Road roller etc, including cost and conveyance of all materials and labour charges etc complete, for Siva temple.(APSS-309)

400

5918

2367200

... More
Re Construction works;Plain Cement Concrete corresponding to M-15 grade as per IS 456 equivalent to (1:2.5:5) using 40, 20 & 10 mm HBG metal (Hand Mixing ) above ground level, 9" to 1' thick including cost of all materials and labour charges etc, complete.( APSS-402)

109

5297

577373

... More
Re Construction works;Construction of CRS Masonry in Lime Mortar (1:2) 2nd Sort for foundation of temple including all operational, incidental, labour charges complete for finished item of work.(APSS-609, 610,611,612)

209

6682

1396538

... More
Re Construction works;RR Masonry In Lime Mortar (1:3) prop using hearting portion in between CRS masonry walls, including cost and conveyance of all materials and labour charges, curing etc, complete finished item of work (APSS-609, 610,611,612)

71

5768

409528

... More
Re Construction works;Filling with sand (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.(APSS-309,310)

52

1912

99424

... More
Re Construction works;Requirement of new Stone for Missing portion of temple vargams from approved quarry including cost and conveyance of all materials and all labour charges etc, complete.( APSS-601, Table 601-A )

2784

502

1397568

... More
Re Construction works;palmona/fine three line Dressing of New stone for trikuta temple flooring , and steps including cost and of all materials and labour charges etc, complete.

756

435

328860

... More
Re Construction works;palmona/fine Dressing of New stone for trikuta temple Stambavargams Walls/ Roof Stone/ Konavattan& Chathuravattam, uttaravargam, kakshasanam, including cost and of all materials and albour charges etc, complete

3006

900

2705400

... More
Re Construction works;Ornamental palmona/fine Dressing of New stone for trikuta temple Prastra vargam, including cost and of all materials and albour charges etc, complete

810

1061

859410

... More
Re Construction works;Ornamental palmona/fine Dressing of New stone for trikuta temple Pillar vargam, including cost and of all materials and labour charges etc, complete

250

1942

485500

... More
Re Construction works;Re-Construction of old palmona/fine dressed temple vargams, with vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all necessary using materials and labour charges etc, complete for (Foundation to Roof level(i.e. Upapeetam, Adistanam, Sthambavargam) & FLOORING ).(APSS-601)

7763

199

1544837

... More
Re Construction works;Re- Construction of old palmona/fine dressed temple vargams, with vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all using materials and labour charges etc, complete -for.(Pillars,Beams,Roof Stons and Prastra, Door frames etc (APSS-601)

5625

281

1580625

... More
Re Construction works;Scaffolding charges for reconstruction of temple vargams by providing mud ramp, ropes, wooden logs, crowbars and servi ballies etc, including cost of all necessary using materials and labour charges, etc, complete. (APSS-36)

13388

15

200820

... More
Re Construction works;Laying Lime Concrete . (1:3:6) prop, using 40mm (HBG) metal in between temple walls & temple Plinth protection including cost and conveyance of all materials and labour charges etc, complete at thrikuta temple.(APSS-401)

77

5865

451605

... More
Re Construction works;steel clamps should designed accordingly to the direction of engineer in charge conforming metal clamps IS - 4101(Part-1) the grabagruha/Vimana/outer veneering/roof slabs architectural members by using adhesive, steel dowels by making Necessary grooves in the stone members filling the gap with suitable fillet material and matching colour as per the site conditions etc., complete departmental in charge

180

914

164520

... More
Re Construction works;Providing and Laying Lime concrete of (1:1.5:3)-Prop. Using 20mm to 40mm down size brick Aggregate jelly , to a required slop to easy run of water to existing channel, rammed to achieve 100% compaction and finished with gur and belgiri treatment including rounding of junctions with a parapet wall to avoid the leakage at concrete and parapet junction and curing by spreading fodder or gunny bags, Including cost of all materials and labour charges etc, complete. finished item of as directed by the Engineer-in- charge, (APSS-401)

72

10748

773856

... More
Re Construction works;Terrace Water tightening work - Laying a layer of lime plaster of 25mm thick in LM (1: 1 1/2) Prop grinded twice. fixing terracotta tiles 150 x 150 x 12 mm thick in lime mortar pointing, applying a layer of LM (1:11/2)prop grinded twice of 25mm thick, and again fixing terracotta tiles 150 x 150 x 12 mm as second layer in lime mortar and applying 3rd layer of lime plaster of 25mm thick (1:11/2)prop grinded twice thick and finally cebara finish of 3mm thick (1:1) duly mixing ingredients during grinding such as Jaggery, alovera , karakkya, Jute , Eggs, etc, the grinding of lime mortar should be two times the gap in between two grand age should not be less than one month after 1st grinding it should be soaked for one month and grinded 2nd time. The obtained material shall be tested in lab to obtain required strength, plasticity and other requirements. The materials should used on acceptance of higher authorities in execution. the curing should be with karakaya with jaggery water on each layer independently until it achieve required strength under supervision of engineer in charge (APSS-807)

158

2693

425494

... More
Re Construction works;laying Lime concrete -(1:3:6),with LM (1:3) prop, using 40mm metal with hand mixing for plinth protection for temple all round , including cost and conveyance of all materials and labour charges etc, complete.( APSS-401)

45

5865

263925

... More
Re Construction works;Provide cut stone with granite slabs of Rudraram variety/local matching stone 75mm to 100mm thick of size(2'-0"X2'-0") with Two line palmana dressing for hard granite stone 20mm thick Lime mortar (1:3) Prop. Over Lime Concrete (1:3:6) Prop.100mm thick using 40mm HBG metal and pointed with Lime Mortar (1:11/2) Prop, including cost and conveyance of all materials and labour charges etc, complete at thrikuta temple .(APSS- 701 ,702)

294

2427

713538

... More
Re Construction works;Deep pointing for temple wall with LM (1:1 1/2) prop,including cost and conveyance of all materials and labour charges scaffolding charges etc

709

188

133292



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.