Archaeology And Museums Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
430054Bid Award Id
ViewTender No
B1/329/2022-2, dated 09-06-2023 (4th CALL)Tender Authority
Archaeology And Museums Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Re Construction works;Removal of old Palmona/fine dressed temple vargams, with LM (1:3)vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all using materials and labour charges etc, complete -for. (Pillars,Beams,Roof Stones and Prastra, Door frames etc, .(APSS-601,601.2.1)
614
84
51576
Re Construction works;Removal of old Palmona/fine dressed temple vargams, with LM (1:3) vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all necessary materials and labour charges etc, complete for (Foundation to Roof level i.e. (Adistanam, Upapeetam, Sthambavargam) & FLOORING )(APSS-601,601.2.1)
1829
56
102424
Re Construction works;Scaffolding charges for removal of temple vargams by providing mud ramp, ropes, wooden logs, crowbars and servi ballies etc, including cost of all necessary using materials and labour charges, etc, complete.(APSS-36)
2443
15
36645
Re Construction works;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including Seignorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
144
202
29088
Re Construction works;Filling the foundation of temple with aggregate i.e. 20mm &40mm (HBG) Metal with sand, Metal layer by layer 0'.6" rolling with Road roller etc, including cost and conveyance of all materials and labour charges etc complete, for Siva temple.(APSS-309)
144
5918
852192
Re Construction works;Plain Cement Concrete corresponding to M-15 grade as per IS 456 equivalent to (1:2.5:5) using 40, 20 & 10 mm HBG metal (Hand Mixing ) above ground level, 9" to 1' thick including cost of all materials and labour charges etc, complete.( APSS-402)
29
5297
153613
Re Construction works;Construction of CRS Masonry in Lime Mortar (1:2) 2nd Sort for foundation of temple including all operational, incidental, labour charges complete for finished item of work.(APSS-609, 610,611,612)
42
6682
280644
Re Construction works;RR Masonry In Lime Mortar (1:3) prop using hearting portion in between CRS masonry walls, including cost and conveyance of all materials and labour charges, curing etc, complete finished item of work (APSS-609, 610,611,612)
30
5768
173040
Re Construction works;Filling with sand (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.(APSS-309,310)
35
1912
66920
Re Construction works;Requirement of new Stone for Missing portion of temple vargams to match the existing stone colour from approved quarry including cost and conveyance of all materials and all labour charges etc, complete.( APSS-601, Table 601-A )
866
502
434732.32
Re Construction works;Palmona/fine three line Dressing of New stone for temple, other vargams, and steps including cost and of all materials and albour charges etc,complete.
300
435
130500
Re Construction works;Palmona/fine Dressing of New stone for temple Stambavargams Walls/ Roof Stone/ Konavattan& Chathuravattam, including cost and of all materials and albour charges etc,complete
1304
900
1173600
Re Construction works;Ornamental Palmona/fine Dressing of New stone for trikuta temple Prastra vargam, including cost and of all materials and albour charges etc, complete
977
1942
1897334
Re Construction works;Re-Construction of old Palmona/fine dressed temple vargams, with vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all necessary using materials and labour charges etc, complete for (Foundation to Roof level(i.e. Upapeetam, Adistanam, Sthambavargam) & FLOORING ).(APSS-601)
2357
199
469043
Re Construction works;Re- Construction of old Palmona/fine dressed temple vargams, with vertical and horizontal without damaging its original shapes, by experienced silpies including cost of all using materials and labour charges etc, complete -for.(Pillars,Beams,Roof Stons and Prastra, Door frames etc (APSS-601)
952
281
267512
Re Construction works;Scaffolding charges for reconstruction of temple vargams by providing mud ramp, ropes, wooden logs, crowbars and servi ballies etc, including cost of all necessary using materials and labour charges, etc, complete. (APSS-36)
3309
15
49635
Re Construction works;Laying Lime Concrete . (1:3:6) prop, using 40mm (HBG) metal in between temple walls & temple Plinth protection including cost and conveyance of all materials and labour charges etc, complete at thrikuta temple.(APSS-401)
17
5865
99705
Re Construction works;steel clamps should designed accordingly to the direction of engineer in charge conforming metal clamps IS - 4101(Part-1) the grabagruha/Vimana/outer veneering/roof slabs architectural members by using adhesive, steel dowels by making Necessary grooves in the stone members filling the gap with suitable fillet material and matching colour as per the site conditions etc., complete departmental in charge
72
914
65808
Re Construction works;Providing and Laying Lime concrete of (1:1.5:3)-Prop. Using 20mm to 40mm down size brick Aggregate jelly , to a required slop to easy run of water to existing channel, rammed to achieve 100% compaction and finished with gur and belgiri treatment including rounding of junctions with a parapet wall to avoid the leakage at concrete and parapet junction and curing by spreading fodder or gunny bags, Including cost of all materials and labour charges etc, complete. finished item of as directed by the Engineer-in- charge, (APSS-401)
10
10748
107480
Re Construction works;Terrace Water tightening work - Laying a layer of lime plaster of 25mm thick in LM (1: 1 1/2) Prop grinded twice. fixing terracotta tiles 150 x 150 x 12 mm thick in lime mortar pointing, applying a layer of LM (1:11/2)prop grinded twice of 25mm thick, and again fixing terracotta tiles 150 x 150 x 12 mm as second layer in lime mortar and applying 3rd layer of lime plaster of 25mm thick (1:11/2)prop grinded twice thick and finally cebara finish of 3mm thick (1:1) duly mixing ingredients during grinding such as Jaggery, alovera , karakkya, Jute , Eggs, etc, the grinding of lime mortar should be two times the gap in between two grand age should not be less than one month after 1st grinding it should be soaked for one month and grinded 2nd time. The obtained material shall be tested in lab to obtain required strength, plasticity and other requirements. The materials should used on acceptance of higher authorities in execution. the curing should be with karakaya with jaggery water on each layer independently until it achieve required strength under supervision of engineer in charge (APSS-807)
33
2693
88869
Re Construction works;Deep pointing for temple wall with LM (1:1 1/2) prop,including cost and conveyance of all materials and labour charges scaffolding charges etc
229
188
43052
Re Construction works;laying Lime concrete -(1:3:6),with LM (1:3) prop, using 40mm metal with hand mixing for plinth protection for temple all round , including cost and conveyance of all materials and labour charges etc, complete.( APSS-401)
22
5865
129030
Re Construction works;Provide cut stone with granite slabs of Rudraram variety/local matching stone 75mm to 100mm thick of size(2'-0"X2'-0") with Two line palmana dressing for hard granite stone 20mm thick Lime mortar (1:3) Prop. Over Lime Concrete (1:3:6) Prop.100mm thick using 40mm HBG metal and pointed with Lime Mortar (1:11/2) Prop, including cost and conveyance of all materials and labour charges etc, complete at thrikuta temple .(APSS- 701 ,702)
142
2427
344634
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements