Archaeological Survey Of India Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 6,07,550Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Mw(sr) Repairs To The Pathways And Providing Led Pathway Lights Inside Balahissar Area (from Clapping Port To Taramati Mosq) Of Golconda Fort - Exec Of Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ASI_699646_2Bid Award Id
ViewTender No
26/C/2021-22/MW(SR)/993Tender Authority
Archaeological Survey Of India ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying of approach pathway with well-dressed granite stone slabs/Matching stone slabs matching with texture of monument of average 80-100 mm thick and sizes of Length 0.60m to 1.20m, Width of 0.45 to 0.60mts laid to required slopes for easy draining of rain water to avoid water logging inside monument including cost of material, dressing charges, laying charges, cost of cement mortar (1:4) for cushion, labour, seigniorage charges, applicable taxes, loading, unloading, conveyance, cutting charges etc. all complete item of work as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
1941.42
-
-
... More
Pointing to the pathway in Lime Surkhi mortar (1:1:1) including cost of material, labour charges, conveyance charges, loading, unloading, seigniorage charges and applicable taxes etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
1915.13
-
-
... More
Providing PCC 1:2:4 as a bed course for the kerb stones including cost of material, labour charges, concrete mixing, conveyance, loading, unloading, shuttering charges, finishing charges of concrete surface, applicable taxes etc. all complete item of work as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
46.35
-
-
... More
Providing granite kerb stone (Bull Nose type) of matching colour and texture of average depth of 0.45m and length of 1.10 to 1.20 m with a thickness of 0.10m to the pathways on both sides including cost of material, labour charges, conveyance, loading, unloading, applicable taxes etc. all complete item of work as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
927
-
-
... More
Providing 9-15 watts LED pathway lights along the pathway which will be fixed in the middle of the kerb stones on single/both sides as per the approved design and make from circle office, including cost of LED lights, concealed wiring along the pathway on both sides, finishing, connection to the panel boards MCB’s on and off arrangements, loading, unloading, installation charges, applicable taxes, conveyance charges etc. complete item of work as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
371
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements