Agricultural Marketing Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Agricultural Marketing Department - AMD Tender

Civil And Construction
Civil Works Others
Opening Date27 Aug 2022
Closing Date12 Sep 2022
Tender Amount₹ 1,15,33,941 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Balance Work of Construction of Office Building Construction of Shops;Plastering with 12 mm thick in CM (1:5) prop. with sponze finishing including cost and conveyance of all materials like cement, sand (screened) water etc., to site including sales & other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar, finishing , curing etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.

1056.18

-

169881

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying of 50x50x5mm thick MS L Angles of approved drawings including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per Standard Specication and as directed by the Departmental Engineer-in-charge.

556.5

-

310694

... More
Balance Work of Construction of Office Building Construction of Shops;VCC (1:2:4) using 20mm size HBG machine crushed metal from approved quarry incluidng cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, incluidng , inlcuidng all charges for machine mixing, laying concrete in position and curing etc., complete for finished item of work as per standard specifications and as directed by the Departmental Engineer.

13.63

-

88592

... More
Balance Work of Construction of Office Building Construction of Shops;Providing barbed wire fencing on top of Compound wall around the Market Yard Kesamudram, under AMC., Kesamudram of Mahabubabad District.:- Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site including scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.

82.51

-

569734

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications.

8

-

2272

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 13.50 are made from idential CPVC compounds having the same physical properties for Hot and Cold water (IS 15778:2007) including cost and conveyance of all materials and labour charges etc., complete as per standard specifications. pipe line arrangemtns around market yadr Kesamudram. b) 28.60mm dia CPVC pipes

200

-

49308

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 13.50 are made from idential CPVC compounds having the same physical properties for Hot and Cold water (IS 15778:2007) including cost and conveyance of all materials and labour charges etc., complete as per standard specifications. pipe line arrangemtns around market yadr Kesamudram. a) 15.90mm dia CPVC pipes

250

-

40618

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 20 mm NB Size including cost and conveyance of all materials and labour charges etc., complete and as per standard specifications.

5

-

4959

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of 32mm Nominal bore G.I pipe medium grade as per IS 1239, ISI mark with G.I fittings including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per standard specifications.

200

-

95664

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete

1

-

7031

... More
Balance Work of Construction of Office Building Construction of Shops;Supply of PVC insulated 3 core 2.5 Sqmm flat copper cable for submersible motor including cost and conveyance of all materials and labour charges etc, complete for finished item of work and as per standard specifications.

200

-

24800

... More
Balance Work of Construction of Office Building Construction of Shops;Manufacture, Supply, & Delivery of 40mm dia HDPE pipes conforming to IS 4984-1995 of 10Kg/Sqcm including transportation to anywhere in T.G, excluding excise duty, sale tax and specials etc., complete including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials and labour charges etc, complete for finished item of work and as per standard specifications.

300

-

35106

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Transportation of 5.00HP Star rated 5-10 Stage Three phase ISI submersible motor pumpset suitable for 6" Bore well Makes: Kirloskar / Crompton / Texmo / CRI / KSB / Aryan Varshaincluding cost and conveyance of all materials and labour charges etc, complete for finished item of work and as per standard specifications

1

-

35288

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing PVC casing pipes of 180mm for poratable water supplies confirming to IS 4985/2000 with bell end with test pressure of 6 Kg/cm2 of approved colour other than wihite including cost and conveyance of all materials including excise duty and other taxes, all incidental and operational charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

80

-

57898

... More
Balance Work of Construction of Office Building Construction of Shops;Drilling of bore wells by down hammer (DTH) drilling to finished dia of (6 1/2" dia) in all formations to the depth specified and remaining the bore to the required dia flushing the bore at an average pressure of 7 Kg/cm2 conducting yield test, inclusive of transportation from point to point, crew charges, consumables, shifting of rig and all other charges etc., and the bore well should be true to vertical and work should carried out to the satisfaction of the department as per IS 2800 Part - I & II 1970 etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge. Above 90.00 Mts

120

-

40200

... More
Balance Work of Construction of Office Building Construction of Shops;Drilling of bore wells by down hammer (DTH) drilling to finished dia of (6 1/2" dia) in all formations to the depth specified and remaining the bore to the required dia flushing the bore at an average pressure of 7 Kg/cm2 conducting yield test, inclusive of transportation from point to point, crew charges, consumables, shifting of rig and all other charges etc., and the bore well should be true to vertical and work should carried out to the satisfaction of the department as per IS 2800 Part - I & II 1970 etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge. Upto 90.00 Mts

90

-

27450

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of Water coolers make Bluestar make including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per standard specifications and as directed by the Departmental Engineer-in-charge.

5

-

275000

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of Thermol Insulated cooling water tank with 500Ltrs with Stainless steel abgular skid with isolated body including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per standard specifications and as directed by the Departmental Engineer-in-charge.

1

-

107000

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 3 TR out door plate heat exchanger online chiller with emerson copoland complressor of approved make including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per standard specifications and as directed by the Departmental Engineer-in-charge.

1

-

126000

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of SS 304 grade Stainless Steel R.O Water tank 1000Ltrs capacity including Stainless Steel stand of approved make including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per standard specifications and as directed by the Departmental Engineer-in-charge.

1

-

23000

... More
Balance Work of Construction of Office Building Construction of Shops;Feed water storage tank 1000 Ltr capactiy with tank nipples and accessories Make: Nandi / Sintex / Remu or any other equilant. including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

7000

... More
Balance Work of Construction of Office Building Construction of Shops;100 Ltr capacity R.O water circulating tank including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

700

... More
Balance Work of Construction of Office Building Construction of Shops;Internal UPVC /PVC pipe connections with necessary ball valves / Unions T's L'bows, Couplers, MTA's, FTA's, Reducers etc including fabrications charges including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

6800

... More
Balance Work of Construction of Office Building Construction of Shops;SS make R.O Unit Mounting Skid including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

9500

... More
Balance Work of Construction of Office Building Construction of Shops;Pen type TDS Meter including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

2000

... More
Balance Work of Construction of Office Building Construction of Shops;Powder coated / S.S Make wet panel board with UKL / Aster / Flow point flow meters & Mahaveer / Vica / Waree / Sreeji or any other Two glysirine filled pressure guage meters including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

7600

... More
Balance Work of Construction of Office Building Construction of Shops;d) INSTRUMENTATION:- Powder coated / S.S Make Electrical single phase panel board with all necessary Switches, Regulators, Voltmeter, Ammeter, Indicatioin bulbs including fabrication charges (LT make) including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

10500

... More
Balance Work of Construction of Office Building Construction of Shops;Anti scalant dozing pump Make: E-Dose / UKL / Positive / Chemdose / Flowtech any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

9130

... More
Balance Work of Construction of Office Building Construction of Shops;Multi stage stainless steel vertical high pressure pump construction with 1.5 to 2.25 KW single phase induction motor Make: Sumo / Nanfung / CRI / Grundfose / Kapa or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

46500

... More
Balance Work of Construction of Office Building Construction of Shops;Feed Water Pump 1 HP Single Phase Make: Ramesh / Oxford / Fisher / CRI / KSB / Luby or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

5000

... More
Balance Work of Construction of Office Building Construction of Shops;c) ELECTRICAL ITEMS:- U.V Sterilizer Make: Sindhu / RO-Guard / or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

9500

... More
Balance Work of Construction of Office Building Construction of Shops;8" dia R.O Membrane Make: G Osmonics / Film Tech / Hydranautics / Coch or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

50500

... More
Balance Work of Construction of Office Building Construction of Shops;b) R.O FILTRATION PROCESS:- 8" dia R.O Membrane Pressure housing Make: Alfa Aerosal / A1 / Cold line / UKL / Pentair / Gallant / Maxima or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

18000

... More
Balance Work of Construction of Office Building Construction of Shops;20" Long 0.5 micron cartridge filter with PP housing Make: UKL/MMP/GOPANI/ or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

3

-

13500

... More
Balance Work of Construction of Office Building Construction of Shops;Top opening Activated carbon filter in FRP/Composite construction with single lever operated multiport valve, including requisite sand pebbles Make: MMP / Pentair, / Wave syber / Aventura / H.T coma / Water life or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

29000

... More
Balance Work of Construction of Office Building Construction of Shops;RO Plant :- a) PRE - FILTRATION: - Top opening pressure sand filter in FRP/Composite construction with single lever operated multiport valve, including requisite sand pebbles Make: MMP / Pentair, / Wave syber / Aventura / H.T coma / Water life or any other equivalent including cost and conveyance of all materials and labour charges, etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

1

-

25900

... More
Balance Work of Construction of Office Building Construction of Shops;Painting to Plastic Emulsion Paint in two coats over primary coat of approved brand and colour including cost of all materials labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work and as per Standard Specifications and as directed by the Engineer-in-charge.

241.8

-

29396

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering with 20 mm thick in CM (1:5) prop. with sponze finishing including cost and conveyance of all materials like cement, sand (screened) water etc., to site including sales & other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar, finishing , curing etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.

50.55

-

12026

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering with 12 mm thick in CM (1:5) prop. with sponze finishing including cost and conveyance of all materials like cement, sand (screened) water etc., to site including sales & other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar, finishing , curing etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.

41.25

-

6635

... More
Balance Work of Construction of Office Building Construction of Shops;CC (1:2:4) using 20mm size HBG machine crushed metal from approved quarry incluidng cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, incluidng , inlcuidng all charges for machine mixing, laying concrete in position and curing etc., complete for finished item of work as per standard specifications and as directed by the Departmental Engineer.

2.73

-

17744

... More
Balance Work of Construction of Office Building Construction of Shops;Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site including scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.

8.31

-

57072

... More
Balance Work of Construction of Office Building Construction of Shops;Providing TMT bars of Fe-500 grade as per IS 1786-1979 of different diameters for RCC works, including labour charges for streightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No. 126) TATA / SAIL / VSP & JINDAL

2

-

186547

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) h) For Sundhades 0.60mt W

0.23

-

302

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) g) For Lintels

0.16

-

1998

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) f) For Roof slab 125mm thick

28.41

-

43598

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) e) For Roof Beam

1.7

-

21889

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) d) For Columns

0.81

-

9536

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) c) For Ground beam

1.62

-

19749

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) b) For Pedastals

0.73

-

6944

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M20 grade Nominal Mix using 20 mm size HBG metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 330 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) a) For Footings.

1.32

-

11825

... More
Balance Work of Construction of Office Building Construction of Shops;CC (1:5:10) prop.using 40mm HBG machine crushed metal and screened sand including cost and conveyance of all materials to site from approved source, centering machine mixing & vibrating, laying concrete in position, tamping curing for requred period, labour charges for all items all other incidental and operational charges etc.,complete as per standard specification and as directed by the Engineer-in-charge for finished item of work.

3.17

-

13247

... More
Balance Work of Construction of Office Building Construction of Shops;Drilling of Bore well providing water supply arrangements and Construction of RO plant at Market Yard Kesamudram, under AMC., Kesamudram of Mahabubabad District.:- Earth work excavation for and depositing soils and banks with an intial lead of 10m and intial lift of 2m and disposal of soils as directed by the Engineer-in-charge of works including all leads and lifts, shoring, structting etc., excluding bailing out of water etc., complete for all items of other incidental and operational charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

13.5

-

4788

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete. D no 5.2.1

70

-

1540

... More
Balance Work of Construction of Office Building Construction of Shops;Providing independent earthing for Importantequipment with 40mm dia 'B' class 2.5m long G.Ipipe and 19mm dia 'B' class G.I pipe of 0.3mtr.long connected with reducer providing G.I funnelwith mesh enclosed in C.C/ brick masonrychamber of 450m x 450m x 400mm with R.C.C.Slab cover duly providing staggered holes fillingwith 20Kg Salt and 40Kg Charcoal or 40Kgbentonite powder from the bottom of the pipegiving earth connection from electrode throughG.I strip of 40 x 6mm x 200mm length with allaccessories and labour charges complete, as perIS specifications 732/1982 (Part II)NOTE : Whenever providing full length ofelectrode is not possible due to the obstructionof water tube / rock, the length of electrodemay be reduced, and additional earthing may bedone to meet earth resistance. ELEC 7.16.5 of 2021-22 SSR

8

-

44800

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Run of 1 of 6 Sq.mm WPTC (Weatherproof Twin Core) ISI mark Aluminum Wire. Makes : Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal / Suncab / Stanjo / Rajnigandha / Orbit / Airson / Beljin / Savera Champion. / Rhino along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete. D no 6.2.1

280

-

18200

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall outer dia medium grade, FRLS with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. D no 1.4.2(a)

50

-

4450

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Fixing of 25mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in roof slabs outer dia heavy grade, FRLS with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. D no 1.4.2(b)

100

-

8300

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable. Makes : Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR). in existing pipe for mains continuity inlcuding all labour charges etc., complete. D no 3.1.7

35

-

4795

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and run of 3 of 36 /0.3mm (2.5 Sq.mm) FRLSH / HFFR PVCinsulated 1100V grade as per IS:694/1990, IS17048 specifications for Copper cable.Makes : Finolex / RR kabel / Havells /Beljin(HFFR)/Ollivin(HFFR) / Finecab(HFFR) /GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) /KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) /Southking (HFFR) / Fortune Arrt (HFFR) insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. D no: 3.1.4(AA)

100

-

13500

... More
Balance Work of Construction of Office Building Construction of Shops;Supply of 2 Module Modular type Electronic Fan Regulator. ELEC 1.9.1 338n of 2021-22 SSRSupply of 2 Module Modular type Electronic Fan Regulator. ELEC 1.9.1 338n of 2021-22 SSR

10

-

6000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing 4Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 4 Nos S.P out goings and for 1 No Incomer etc complete. Makes : Legrand / Schneider / Siemens / L&T / Crabtree Xpro / ABB / C&S (Metal Door) suitable for 40A DP Isolator as incomer and 2nos - 6-32A 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete. D no 4.4.2

10

-

39000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of modular type 20A 2 Module Modular Socket with shutter with 20A 1 Way 1 Module Modular Switch withIndicator. on cover plate with module metal box covered board including earth connection & all labour charges on wall with cover frame of Makes : Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus / Crabtree Amare / LogusPlatina / Gold Medal GIFA / GM-Zenova/ L&TEnglaze etc., complete. D no 2.1.5(B)

10

-

7300

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of modular type 10A 3/2 Pin 2 Module Modular Socket with shutter. with 10A switch control on a common board of makes Makes : Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&TEnglaze with earth continuity including wire leads, earth connections along with all labour charges etc., complete. D no 2.1.4(B)

10

-

3800

... More
Balance Work of Construction of Office Building Construction of Shops;Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLSH / HFFR PVCinsulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable.Makes : Finolex / RR kabel / Havells /Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) /GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) /KEI (HFFR) / Polycab (HFFR) / V-Guard(HFFR)./DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) /Southking (HFFR) / Fortune Arrt (HFFR) in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame Makes : GM Four-Five /Legrand Myrius / Cabtree Verona/ Million Logus / Salzer in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B.(SD 2.1.1)

50

-

40000

... More
Balance Work of Construction of Office Building Construction of Shops;Painting two coats with synthetic enamel paint of 1st grade of approved brand and colour over primary coat including cost and conveyance of all materials labour charges for cleaning, removing the dust, rust and other foreign particles by sand papering including cost of brushes, sand paper, scaffolding charges including all incidental and operational charges etc., complete for finished item of work as per standard specifications and as directed by engineer-in-charge at site. For New Iron Work

124.8

-

19594

... More
Balance Work of Construction of Office Building Construction of Shops;Painting to new walls with 2 coats of exterior Emulsion Paint over primary coat for internal and external walls of approved brand and shade throughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work but excluding conveyance charges of materials

899.95

-

109407

... More
Balance Work of Construction of Office Building Construction of Shops;Flooring with vitrified tiles of 1st quality glossy finishing of size 598 x 598 x 8 mm set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including etc., complete for finished item of work, but excluding the cost of conveyance of all materials. For Second Floor

241.9

-

275785

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Rolling Shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108

62.4

-

294997

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc, complete for finished item of work and as per standard specification and as directed by the Engineer-in-charge for finished item of work Internal walls For Ground Floor Out side

153.42

-

66222

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc, complete for finished item of work and as per standard specification and as directed by the Engineer-in-charge for finished item of work. For Ground Floor Out side

746.53

-

309212

... More
Balance Work of Construction of Office Building Construction of Shops;Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site including and scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work. For Ground Floor

76.07

-

522443

... More
Balance Work of Construction of Office Building Construction of Shops;Providing TMT bars of Fe-500 grade as per IS 1786-1979 of different diameters for RCC works, including labour charges for streightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No. 126) TATA / SAIL / VSP & JINDAL

0.7

-

65291

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Ground Floor For Plinth Beam

1.65

-

21571

... More
Balance Work of Construction of Office Building Construction of Shops;Plain C.C masonary in cement Concrete (1:3:6) prop. using 40 mm machine crushed metal, blasting, incuding cost and conveyanc of all materials to site of work, centering charges labour charges, mortar mixing charges and curing for required period etc., complete as per Standard Specification and as directed by the Engineer-in-charge for finished item of work .

23.18

-

134800

... More
Balance Work of Construction of Office Building Construction of Shops;Construction of shops (10 Nos) Ground Floor of Offie Complex Building at Market Yard Kesamudram under AMC., Kesamudram:- PCC (1:5:10) prop.using 40mm HBG machine crushed metal and unscreened sand including cost and conveyance of all materials to site from approved source, centering machine mixing & vibrating, laying concrete in position, tamping curing for requred period, labour charges for all items all other incidental and operational charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

35.39

-

147890

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete. D no 5.2.1

15

-

330

... More
Balance Work of Construction of Office Building Construction of Shops;Providing independent earthing for Importantequipment with 40mm dia 'B' class 2.5m long G.Ipipe and 19mm dia 'B' class G.I pipe of 0.3mtr.long connected with reducer providing G.I funnelwith mesh enclosed in C.C/ brick masonrychamber of 450m x 450m x 400mm with R.C.C.Slab cover duly providing staggered holes fillingwith 20Kg Salt and 40Kg Charcoal or 40Kgbentonite powder from the bottom of the pipegiving earth connection from electrode throughG.I strip of 40 x 6mm x 200mm length with allaccessories and labour charges complete, as perIS specifications 732/1982 (Part II)NOTE : Whenever providing full length ofelectrode is not possible due to the obstructionof water tube / rock, the length of electrodemay be reduced, and additional earthing may bedone to meet earth resistance. ELEC 7.16.5 of 2021-22 SSR

1

-

5600

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of 9" (225mm) Light duty exhaust fan with metal blades etc complete Makes : Crompton / Havells Ventilair-DB / Orient hill air., wire mesh,including labour charges for fixing of exhaust fan in wall if necessary connections and masonary work of making hole , finishing etc., complete. D no 9.7.16(A)

4

-

9520

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Run of 2 of 6 Sq.mm WPTC (Weatherproof Twin Core) ISI mark Aluminum Wire. Makes : Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal / Suncab / Stanjo / Rajnigandha / Orbit / Airson / Beljin / Savera Champion. / Rhino along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete. D no 6.2.3

250

-

26000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall outer dia medium grade, FRLS with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. D no 1.4.2(a)

350

-

31150

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Fixing of 25mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in roof slabs outer dia heavy grade, FRLS with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. D no 1.4.2(b)

780

-

64740

... More
Balance Work of Construction of Office Building Construction of Shops;Supply of 4.0 KVA Stabilizer Makes : V-Guard / Real Guard / Uni Stab / ITL. ELEC 6.8.1 (1366d) of 2021-22 SSR

3

-

8520

... More
Balance Work of Construction of Office Building Construction of Shops;Installation of Split Air Conditioners. ELEC 6.5.28(1306) of 2021-22 SSR

3

-

5454

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Transportation of 2.0 / 1.8 TR 2-3 Star capable of delivering 21600 BTU/hr and above of makes Daikin / Thoshiba / O General / Carrier / Blue Star / Hitachi or equivalentsplit AC unit with high wall mounted 100% copper indoor unit and outdoor condensing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 3 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with 5 years warranty compressor for 5 years including servicing. ELEC 6.1.1(1242b) of 2021-22 SSR

3

-

165345

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and run of 3 of 56/0.3mm (4 Sq.mm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable. Makes : Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR). in existing pipe for mains continuity inlcuding all labour charges etc., complete. Dno 3.1.7(B)

1000

-

205000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and run of 3 of 36 /0.3mm (2.5 Sq.mm) FRLSH / HFFR PVCinsulated 1100V grade as per IS:694/1990, IS17048 specifications for Copper cable.Makes : Finolex / RR kabel / Havells /Beljin(HFFR)/Ollivin(HFFR) / Finecab(HFFR) /GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) /KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) /Southking (HFFR) / Fortune Arrt (HFFR) insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. D no: 3.1.4(AA)

2000

-

270000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and run of 1 of 22/0.3mm (1.5 Sq.mm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable. Makes : Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR). in existing pipe for mains for inverter wiring inlcuding all labour charges etc., complete. D no 3.1.3(A)

500

-

16000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply, Transportation & fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle? kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient. D no 9.7.1

20

-

69000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply of 2 Module Modular type Electronic Fan Regulator. ELEC 1.9.1 338n of 2021-22 SSRSupply of 2 Module Modular type Electronic Fan Regulator. ELEC 1.9.1 338n of 2021-22 SSR

20

-

12000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and transportation of 12 W +/-10% (>= 1200 Lumens)-- back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec / FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. ELEC 3.9.4(792a) of 2021-22 SSR

20

-

36200

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LEDretro tube light, housing made with aluminum anodised body, wide operating voltage withdouble side connection, PF=0.9, Surgeprotection: > 2KV, THD<15%, with inbuiltdriver and frosted cover CCT: 3000K - 6500K as desired by the department and as per ISspecifications, minimum CRI=80,.etc completewith 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro /Crompton / Bajaj / Havells / Jaquar / IB LED /Panasonic / Halonix / HPL / Syska / Eveready /Surya / Keselec/ FIEM / Arraystorm / GM /Goldmedal .LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG LEDs.ELEC 3.9.10 of 2021-22 SSR

40

-

32000

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of (8+12) 4 Way TPN DB Horizontal with IP 43, 12 Nos of Legrand / Schneider / Siemens / L&T /Hager / Crabtree Xpro / ABB / C&S suitable for 63A 4P isolator as incomer and 12Nos - of 6-32A 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete. D no 4.4.4

1

-

10300

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of modular type 20A 2 Module Modular Socket with shutter with 20A 1 Way 1 Module Modular Switch withIndicator. on cover plate with module metal box covered board including earth connection & all labour charges on wall with cover frame of Makes : Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus / Crabtree Amare / LogusPlatina / Gold Medal GIFA / GM-Zenova/ L&TEnglaze etc., complete. D no 2.1.5(B)

30

-

21900

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of modular type 10A 3/2 Pin 2 Module Modular Socket with shutter. with 10A switch control on a common board of makes Makes : Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&TEnglaze with earth continuity including wire leads, earth connections along with all labour charges etc., complete. D no 2.1.4(B)

40

-

15200

... More
Balance Work of Construction of Office Building Construction of Shops;Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable.Makes : Finolex / RR kabel / Havells /Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) /GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) /KEI (HFFR) / Polycab (HFFR) / V-Guard(HFFR)./DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) /Southking (HFFR) / Fortune Arrt (HFFR) in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame Makes : GM Four-Five /Legrand Myrius / Cabtree Verona/ Million Logus / Salzer in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B.(SD 2.1.1)

120

-

96000

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications and as directed by the departmental Engineer..

20

-

5681

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 3" (75 mm nominal size ) Nahany Trap with Jali UPVC/SWR Pipe fittings including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

20

-

2545

... More
Balance Work of Construction of Office Building Construction of Shops;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per Standard Specifications and as directed by the Engineer-in-charge.

3000

-

27270

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 13.50 are made from idential CPVC compounds having the same physical properties for Hot and Cold water (IS 15778:2007) including cost and conveyance of all materials and labour charges etc., complete as per standard specifications and as directed by the departmental Engineer. For 34.90mm dia CPVC pipes

200

-

67032

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 13.50 are made from idential CPVC compounds having the same physical properties for Hot and Cold water (IS 15778:2007) including cost and conveyance of all materials and labour charges etc., complete as per standard specifications and as directed by the departmental Engineer. For 15.90mm dia CPVC pipes

250

-

40618

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 13.50 are made from idential CPVC compounds having the same physical properties for Hot and Cold water (IS 15778:2007) including cost and conveyance of all materials and labour charges etc., complete as per standard specifications and as directed by the departmental Engineer. For 22.20mm dia CPVC pipes

250

-

46583

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowguard SDR 13.50 are made from idential CPVC compounds having the same physical properties for Hot and Cold water (IS 15778:2007) including cost and conveyance of all materials and labour charges etc., complete as per standard specifications and as directed by the departmental Engineer. For 28.60mm dia CPVC pipes

300

-

73962

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 110 mm dia PVC Vent Cowl including cost and conveyance of all materials and all labour charges etc., complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

2

-

48

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 110 mm dia PVC / SWR pipe - 4 Kg/sq.cm -Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost and conveyance of all materials and all labour charges etc., complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

300

-

59874

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 180 mm dia PVC pipes - 6 Kg/sq.cm -Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost and conveyance of all materials and all labour charges etc., complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

200

-

144746

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 32mm x 25mm PPR Reducers conforming to DIN Standards 8077/8092 including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

10

-

250

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of 25mm x 20mm PPR Reducers conforming to DIN Standards 8077/8092 including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

10

-

159

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of CP finish brass soap dish including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

6

-

3933

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of Towel rod 24 " premium make powder coated stainless steel body with 10 years warranty including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

6

-

22448

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of premium make wall mirror with provision for over head shower and 115 mm long bend pipe with wall flange and with 10 years warranty including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specifications and as directed by the departmental Engineer.

6

-

38161

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and Fixing of Indian make Flat Back Wash Hand Basin (HSW/Parryware/Nycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Esso or equivalent complete with standard CI brackets including wooden block including cost and conveyance of all materials and labour charges etc., complete.

7

-

11112

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 410 x 265 x 305 mm including cost and conveyance of all materials and labour charges etc complete for finished item of work and as per standard specification and as directed by departmental Engineer-in-charge.

4

-

14620

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995 including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per Standard Specifications and as directed by the Engineer-in-charge.

4

-

4576

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying & fixing approved make Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm Long including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per Standard Specifications and as directed by the Engineer-in-charge.

2

-

3429

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap including cost and conveyance of all materials and labour charges etc., complete for finished item of work and as per Standard Specifications and as directed by the Engineer-in-charge.

4

-

8767

... More
Balance Work of Construction of Office Building Construction of Shops;Painting two coats with synthetic enamel paint of 1st grade of approved brand and colour over primary coat including cost and conveyance of all materials labour charges for cleaning, removing the dust, rust and other foreign particles by sand papering including cost of brushes, sand paper, scaffolding charges including all incidental and operational charges etc., complete for finished item of work as per standard specifications and as directed by engineer-in-charge at site. For New Iron Work

4.32

-

678

... More
Balance Work of Construction of Office Building Construction of Shops;Painting two coats with synthetic enamel paint of 1st grade of approved brand and colour over primary coat including cost and conveyance of all materials labour charges for cleaning, removing the dust, rust and other foreign particles by sand papering including cost of brushes, sand paper, scaffolding charges including all incidental and operational charges etc., complete for finished item of work as per standard specifications and as directed by engineer-in-charge at site. For New Wood Work

175.97

-

29486

... More
Balance Work of Construction of Office Building Construction of Shops;Painting to new walls with 2 coats of exterior Emulsion Paint over primary coat for internal and external walls of approved brand and shade throughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work but excluding conveyance charges of materials

1604.68

-

195081

... More
Balance Work of Construction of Office Building Construction of Shops;Flooring with 16 to 18mm thick high polished granite stone slabs black of length not less than 2.43m liad over RCC slab bed already laid set over 20mm thick CM (1:8) base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.30 Kg per Sqm and jointed with neat white cement paste mixed with pigment of matching shade, half rounding of the edges and polishing including cost and conveyance of all materials to work site and all operational, incidental labour & lift charges on all materials, cost of base coat, curing charges etc., complete as per Standard Specification and as directed by the Engineer-in-charge for finished item of work . For Second Floor

2.7

-

11369

... More
Balance Work of Construction of Office Building Construction of Shops;Dadooing to internal walls with ceramic tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work and as per standard specifications. For Second Floor

182.51

-

149271

... More
Balance Work of Construction of Office Building Construction of Shops;Dadooing to internal walls with ceramic tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work and as per standard specifications. For First Floor

36.55

-

29894

... More
Balance Work of Construction of Office Building Construction of Shops;Flooring with ceramic tiles set over abase coat of cement mortar (1;8) 12 mm thick over cc bed already laid including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm &jointed neatly with white cement paste to full depth mixed with pigments of matching shade etc., complete for finished item of work.

6.79

-

5595

... More
Balance Work of Construction of Office Building Construction of Shops;Flooring with vitrified tiles of 1st quality glossy finishing of size 598 x 598 x 8 mm set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including etc., complete for finished item of work, but excluding the cost of conveyance of all materials. For Second Floor

176.9

-

201680

... More
Balance Work of Construction of Office Building Construction of Shops;Flooring with vitrified tiles of 1st quality glossy finishing of size 598 x 598 x 8 mm set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including etc., complete for finished item of work, but excluding the cost of conveyance of all materials. For First Floor

165.96

-

189208

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification. For Second Floor

38.58

-

40677

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification. For First Floor

70.88

-

74732

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying and fixing of MS Iron Ventilators with A/r frame ISA 25x25x5mm and 10mm Square Horizental-2Nos and Verticals-8 Nos including cost and conveyance of all materials and all labour charges etc., complete for finished item of work and standard specifications.

300

-

35106

... More
Balance Work of Construction of Office Building Construction of Shops;Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel as per IS 513, D quality, galvanized as per IS 277 powder coated with Pure polyester powder andthickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Aluminium 1 No. per each shutter and including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work for Window with 3 shutters (Centre fixed shutter/ Centre sliding shutter /centre Flymesh shutter) and without Grill Window made of Outer Frame of size 90mm x 50mm. i) Centre Shutter Fixed: centre shutter frame made of section with size 20mm x 47mm of 0.58mmthick should be fitted with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer Frame with the supporting section of size 29mm x 20mmof 0.58mm thick fixed horizontally on top and bottom of the shutterframe. For Second Floor

21.87

-

164633

... More
Balance Work of Construction of Office Building Construction of Shops;Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel as per IS 513, D quality, galvanized as per IS 277 powder coated with Pure polyester powder andthickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Aluminium 1 No. per each shutter and including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work for Window with 3 shutters (Centre fixed shutter/ Centre sliding shutter /centre Flymesh shutter) and without Grill Window made of Outer Frame of size 90mm x 50mm. i) Centre Shutter Fixed: centre shutter frame made of section with size 20mm x 47mm of 0.58mmthick should be fitted with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer Frame with the supporting section of size 29mm x 20mmof 0.58mm thick fixed horizontally on top and bottom of the shutterframe. For First Floor

26.73

-

201218

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying & fixing SINGLE PANEL 30 mm thick WPVC DOOR, door shutters with shutter frame and Infill panel made from WPVC material, the shutter frame made out of PVC extruded sections having overall dimensions of 6 0mm x 30 mm with wall thickness of 1.3 mm ± 0.3 mm, with the Infill panel made out of multi chambered seamless hollow PVC extruded panel having overall dimensions of 610 mm x 20 mm having wall thickness 1 mm ± 0.2 mm with the shutter frame meter cut and joined at corners and all the hardware locations reinforced with special polymeric bars as per drawing including providing special PVC bracket on hinge side, etc complete. For Second Floor

7.88

-

22624

... More
Balance Work of Construction of Office Building Construction of Shops;Supplying & fixing SINGLE PANEL 30 mm thick WPVC DOOR, door shutters with shutter frame and Infill panel made from WPVC material, the shutter frame made out of PVC extruded sections having overall dimensions of 6 0mm x 30 mm with wall thickness of 1.3 mm ± 0.3 mm, with the Infill panel made out of multi chambered seamless hollow PVC extruded panel having overall dimensions of 610 mm x 20 mm having wall thickness 1 mm ± 0.2 mm with the shutter frame meter cut and joined at corners and all the hardware locations reinforced with special polymeric bars as per drawing including providing special PVC bracket on hinge side, etc complete. For First Floor

1.58

-

4536

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Fixing Teak wood doors as per drawings with 2nd class teak wood main frame of section 125mmx 75mm, shutter frame of size 125 x 30 mm and shutter thick nes of 25 mm including providing 6 Nos of MS Z hold fasts of size 300mmx40mmx5mm, including cost of IS marked brass fixutures of 3 No's but hinges 150mm long, 2 No aldrop 300mm x 16mm dia, 2 No tower bolt of 250mmx12mm dia at top, 1 No heavy duty moterised lock 6/7 levers with brass heavy handles, 1 No heavy duty door stopper and 1 No door closer automatic hyper brand IS-3564 including fixing the fixtures to door with required number of screws, bolt and nuts (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) including cost and conveyance, Labour charges for wrought and put up ect complete for finished item of work (1200x2100mm) For Second Floor

17.01

-

93261

... More
Balance Work of Construction of Office Building Construction of Shops;Supply and Fixing Teak wood doors as per drawings with 2nd class teak wood main frame of section 125mmx 75mm, shutter frame of size 125 x 30 mm and shutter thick nes of 25 mm including providing 6 Nos of MS Z hold fasts of size 300mmx40mmx5mm, including cost of IS marked brass fixutures of 3 No's but hinges 150mm long, 2 No aldrop 300mm x 16mm dia, 2 No tower bolt of 250mmx12mm dia at top, 1 No heavy duty moterised lock 6/7 levers with brass heavy handles, 1 No heavy duty door stopper and 1 No door closer automatic hyper brand IS-3564 including fixing the fixtures to door with required number of screws, bolt and nuts (The vertical frame of door shall be embedded in flooring for a depth of not less than 10mm) including cost and conveyance, Labour charges for wrought and put up ect complete for finished item of work (1200x2100mm) For First Floor

12.6

-

69082

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc, complete for finished item of work and as per standard specification and as directed by the Engineer-in-charge for finished item of work Internal walls For Second Floor Out side

306.89

-

144318

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc, complete for finished item of work and as per standard specification and as directed by the Engineer-in-charge for finished item of work Internal walls For First Floor Out side

307.49

-

132724

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc, complete for finished item of work and as per standard specification and as directed by the Engineer-in-charge for finished item of work. For Second Floor

526.05

-

238207

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads and contractors profit etc, complete for finished item of work and as per standard specification and as directed by the Engineer-in-charge for finished item of work. For First Floor

464.24

-

192288

... More
Balance Work of Construction of Office Building Construction of Shops;Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site including and scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work. For Second Floor

81.62

-

588706

... More
Balance Work of Construction of Office Building Construction of Shops;Brick masonry in cm (1:6) prop: using 2nd class traditional well burnt bricks having crushing strength not less than 40kgs/sqcm including cost and conveyance of all materials and labour charges for all items of work, like cement, sand, bricks, curing etc., to site including and scaffolding charges and lifting charges, proper soaking of bricks, the walls should be truely to plumb and maintaining joints and filling of joints with motor etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work. For First Floor

61.11

-

419699

... More
Balance Work of Construction of Office Building Construction of Shops;Ornamental Ceiling Plastering with 12 mm thick in CM (1:3) prop. with sponze finishing including cost and conveyance of all materials like cement, sand (screened) water etc., to site including sales & other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar, finishing , curing etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work. For Third Floor

67.52

-

16116

... More
Balance Work of Construction of Office Building Construction of Shops;Ornamental Ceiling Plastering with 12 mm thick in CM (1:3) prop. with sponze finishing including cost and conveyance of all materials like cement, sand (screened) water etc., to site including sales & other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar, finishing , curing etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work. For Second Floor

330.96

-

73137

... More
Balance Work of Construction of Office Building Construction of Shops;Ornamental Ceiling Plastering with 12 mm thick in CM (1:3) prop. with sponze finishing including cost and conveyance of all materials like cement, sand (screened) water etc., to site including sales & other taxes on all materials and all operational incidental charges on materials and including cost of all labour charges for mixing mortar, finishing , curing etc., complete as per standard specification and as directed by the Engineer-in-charge for finished item of work. For First Floor

330.96

-

67281

... More
Balance Work of Construction of Office Building Construction of Shops;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work For Third Floor

67.52

-

30884

... More
Balance Work of Construction of Office Building Construction of Shops;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work For Second Floor

330.96

-

151383

... More
Balance Work of Construction of Office Building Construction of Shops;Providing TMT bars of Fe-500 grade as per IS 1786-1979 of different diameters for RCC works, including labour charges for streightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No. 126) TATA / SAIL / VSP & JINDAL

4.8

-

447712

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Third Floor For Roof slab 175mm thick

67.52

-

136414

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Third Floor For Roof beam

7.11

-

98472

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Third Floor For Columns

10.36

-

143483

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Second Floor For Sunshades 0.60m wide

11.34

-

16135

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For Second Floor For Lintels

1.15

-

15936

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For First Floor For Sunshades 0.60m wide

13.86

-

18970

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M25 Design Mix using 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inlcuding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on al materials including all operational, incidental and labour chargse such as weigh batching, machine mixing laying concrete, curing etc., complete with cement content of 380 kg / cum as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work For First Floor For Lintels

1.07

-

14249

... More
Balance Work of Construction of Office Building Construction of Shops;Plastering in CM (1:3) prop. 12mm thick in single coat including cost and conveyance of all materials and all labour charges, leads, lifts, scaffolding charges, , curing charges for required period etc., complete as per Standard Specification and as directed by the Engineer-in-charge for finished item of work .

79.2

-

16101

... More
Balance Work of Construction of Office Building Construction of Shops;PCC (1:2:4) using 20mm size HBG metal from approved quarry incluidng cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, incluidng , inlcuidng all charges for machine mixing, laying concrete in position and curing etc., complete for finished item of work as per standard specifications and as directed by the Departmental Engineer.

2.03

-

13195

... More
Balance Work of Construction of Office Building Construction of Shops;RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)

9

-

21040

... More
Balance Work of Construction of Office Building Construction of Shops;VRCC M-20 Nominal mix using 20mm HBG metal with sand including cost and conveyance of all materials to site from approved sources, seigniorage charges, compacting charges curing for required period protecting sides of foudnations trenches whenever necessary and all incidental and operational charges etc. complete for finished item of work and as per stanards specifications and as directed by the Departmental Engineer. For Septic Tank Slab 100mm

16.2

-

22237

... More
Balance Work of Construction of Office Building Construction of Shops;Plain C.C masonary in cement Concrete (1:3:6) prop. using 40 mm machine crushed metal, blasting, incuding cost and conveyanc of all materials to site of work, centering charges labour charges, mortar mixing charges and curing for required period etc., complete as per Standard Specification and as directed by the Engineer-in-charge for finished item of work .

18.9

-

109910

... More
Balance Work of Construction of Office Building Construction of Shops;PCC (1:5:10) prop.using 40mm HBG machine crushed metal and unscreened sand including cost and conveyance of all materials to site from approved source, centering machine mixing & vibrating, laying concrete in position, tamping curing for requred period, labour charges for all items all other incidental and operational charges etc., complete for finished item of work as per Standard Specification and as directed by the Departmental Engineer-in-charge.

2.7

-

11283

... More
Balance Work of Construction of Office Building Construction of Shops;Balance work of Construction of office building at Market Yard Kesamudram under AMC., Kesamudram:- Earth work excavation and depositing on bank not less than 1 mt from then outer edges where with in 10 Mt lead and 2 Mt lift as directed by the departmental officers in-charge at site in kinds of soils including cost and conveyance of all materials, labour charges etc., complete for finished item of work and as per standard specifications.

54

-

19150



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.