Water Resources Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Jul 2024
Closing Date23 Jul 2024
Tender Amount₹ 2,27,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Application of high performance primary coating to protect the steel structure from highly abrasive erosive and corrosive environments. This being a industrial coating , enhances the life of the structure a primer coat with Mastic primer shall be applied. The surface to be applied should be dry & abrasive blast cleaned up to Sa2 1/2. The dry film thickness should be 40 - 60 u for primer coat . The colour is grey and minimum plot time should be 12 hours. The mixing ratio of base to accelerator by volume should be according to the manufactures standard. All paint, when applied , shall provide a satisfactory film and as smooth and even surface . Paint shall be thoroughly stirred, strained and kept at the uniform consistency during application . Paint shall no be applied when the temperature of the metal or surrounding air is below 10 degree celcius and that of the metal is above 50 degree celcius, or when the humidity is above 90 percent, or when it threatens to rain before the painted coat gets dry. Primer coat shall be protected during the initial during the initial curing period against the possibility of moisture condensation or contamination with foreign matter. All painting works shall be performed by spraying, when the coating material is applied by spraying, suitable means shall be removed from the air supply lines of all spraying equipment. primer coat shall be uniform and free from runs ,sags and other imperfections. The time between successive coats shall be not less then the minimum nor more then the maximum re-coating time specified bye the paint manufacturer. The Paint shall be applied so that the thickness at any point is not less than that stipulated in the approved painting specifications. Surface not required to be coated, but adjacent to surface which are to be cleaned and coated, shall be adequately protected during cleaning and coating, Repairs to damaged areas of the coating shall be carried out strictly in accordance with the approved painting specifications. Because of the flammable and toxic nature of the coating materials, precautions should be taken to eliminate and any health or safety hazard that may arise during the applications of the coating. Smoking and welding shall not be allowed within 10 meters of the place when painting in progress. The painting to the gates, hoists and other parts shall be done as per IS specification No.14177-1994.GuidIines for painting system for Hydraulic Gates and hoists and its Adjuncts Viz., IS: 1477(Part) and IS:2932-1994.The cost includes cost of primer? thinner, paint etc, labour charges for application of primer, hire charges for compressor, generator, airless spray etc, cost of oil & diesel for generator, scaffolding charges, transport charges, conveyance of machinery & tools to and fro from site of work, testing & inspection charges, risk allowance replacing the above parts with new one if it most necessary.etc, complete.

3

-

-

... More
Application of coal tar epoxy over the primer shall be through airless spray method. The colour shall be black and the mixing ratio of base to accelerator should be by manufacturer standards. The dry film thickness should be between 100-125 u per coat. The interval before over coating shall be 24 hours. All paint ,when applied shall provide a satisfactory film and a smooth and even surface. Paint shall be thoroughly stirred, strained, and kept at the uniform consistency during application. Paint shall not be applied when the temperature of the metal or surrounding air is below 10 degree Celsius and that of the metal is above 50 degree Celsius, or when the humidity is above 90 percent, or when it threatens to rain before the painted coat gets dry. Each coat shall be protected during the initial curing period against the possibility of moisture condensation or contamination with foreign matter. All painting work shall be performed by airless spraying. When the coating material is applied by spraying ,suitable means shall be provided to prevent segregation during the coating operation .Free oil and moisture shall be removed from the air supply lines of all spraying equipment. Each coat shall be uniform and free from runs, sags and other imperfections. The time between successive coats shall be uniform and free from runs, sags and other imperfections. The time between successive coats shall be not less than the minimum nor more than the maximum recoating time specified by the paint manufacturer. The paint shall be applied so that the thickness at any point is not less than that stipulated in the approved painting specifications. Surface not required to be coated, but adjacent to surface which are to be cleaned and coated, shall be adequately protected during cleaning and coating. Repairs to damaged areas of the coating shall be carried out strictly in accordance with the approved painting specifications. Because of the flammable and toxic nature of the coating materials, precautions should be taken to eliminate any health or safety hazard that may arise during the application of the coating. Smoking and welding shall not be allowed within 10 meters of the place when painting is in progress, The painting to the gates, hoists and other parts shall be done as per IS: 14177-1994.Guidelines for painting system for Hydraulic Gates and hoists and its Adjuncts Viz., IS: 1477(Part 1)- AND IS.•293-1994.The cost includes cost of coal tar epoxy paint, thinner etc, labour charges for application, hire charges for compressor generator, airless spray etc, cost of oil & diesel for generator, scaffolding charges, transport charges, conveyance of machinery & tools to and fro from site of work, testing & inspection charges, risk allowance etc, complete.

3

-

-

... More
Repair and Overhauling of existing Hoist assembly by dismantling all the parts of drive unit consisting of drums, gears, motors, pinion wheels & Plumber Blocks replacing the above parts with new one if it most necessary. And drain the old oil from motor and removing the old grease and dirts from the above parts and refix the assembly filled with new oil and grease such lubricants for smooth operation with correct alignment. the cost includes cost of materials, cost of consumables like welding rods, grinding wheels, drill bits, oxygen & acetylene gas, oil & diesel for generator, process charges like gas cutting and welding, drilling, abrasive blast cleaning, application of zinc rich primer & coal tar epoxy, hire charges for machinery like gas cutting plant, welding equipment, magnetic drilling machine generator, grinding machine, compressor, airless spray machine, hoisting equipment like chain pulley block, derrick post, crane, labour charges for loading, lifting, unloading, transport erection, scaffolding, conveyance to site and clearing them after completion of work, inclusive of all taxes etc., complete and as directed by the departmental officers.

3

-

-

... More
Fabrication supply and installation of chain enclosure for hoist assembly by using composite panels of thickness 3mm made as single unit as per the drawing. The composite cover shall be spaced in such a way to resist bending with inherent stiffeners provided . A liftyhandie in steel composite material shall also be incorporated. UV resistant polyester polymer and high grade reinforcement shall be used for fabricating composite rope drum enclosure the composite material made of glass fiber reinforced polymer shall be of high strength of weight ratio, durable, ease in handling and with better anticorrosive properties. The cost includes cost of mould and pattern, cost of raw materials like UV grade polymers ,multi directional glass fibers ,Hardners, pigments, Aerosil powder cost of consumables like ,Rotters, brushes, labour charges for handly up, grinding, finishing, loading, transport , erection hire charges for equipments like air compressor, pneumatic tools, conveyance to site and clearing them after completion of work, including cost of trial operation, warranty for 5 years etc., complete as directed by the departmental officers.

6

-

-

... More
Fabrication supply and installation of center hoist enclosure for hoist assembly by using composite panels of thickness 3mm made as single unit as per the drawing. The composite cover shall be spaced in such a way to resist bending with inherent stiffeners provided . A liftyhandie in steel composite material shall also be incorporated. UV resistant polyester polymer and high grade reinforcement shall be used for fabricating composite rope drum enclosure the composite material made of glass fiber reinforced polymer shall be of high strength of weight ratio, durable, ease in handling and with better anticorrosive properties. The cost includes cost of mould and pattern, cost of raw materials like UV grade polymers, multi directional glass fibers ,Hardners, pigments, Aerosil powder cost of consumables like, Rotters, brushes, labour charges for handly up, grinding, finishing, loading, transport , erection hire charges for equipments like air compressor, pneumatic tools, conveyance to site and clearing them after completion of work, including cost of trial operation, warranty for 5 years etc., complete as directed by the departmental officers.

3

-

-

... More
Repair & modification of operating platform by removing the old chequered plate from the existing platform arrangements and providing the new 6mm chequered plate over the existing steel structure and providing new ms angles and channels in the structure wherever necessary. The steel members shall be coated with a coat of zinc rich primer over which coal tar epoxy shall be applied. The cost includes cost of all materials, cost of consumables like welding rods, grinding wheel, oxygen & acetylene gas, diesel & oil for generator, process charges like gas cutting, welding, labour charges for dismantling, loading, lifting, unloading, transport, erection, hire charges for equipments like welding machine, cutting set, grinding machine, power charges for generator, conveyance to site and clearing them after completion of work, including cost of trial operation, warranty for 5 years, etc., complete as directed by the departmental officers.

152

-

-

... More
Repair and Replacing the damaged portion of lifting chain and repairing the counter weight arrangements in the hoisting arrangements of vertical lift gate of size 12140 X 4500 mm including removing the chain from the counter weight arrangement to avoid accidental movement. And Conveyed to work shop and delink the damaged portion of the chain. The new roller chain of 5" pitch made up of steel links and short cylindrical rollers are linked with the existing chain arrangements and conveyed to the work site and lifted to the platform by using cranes and chain pulley and fixed to the existing chain on one side with connecting shackle by means scaffolding arrangement of and other side fitted to the counter weight arrangement with required eye bolts. The cost includes cost of all materials, process charges like gas cutting, welding, machining, Milling, Shaping, scaffolding charges, labour charges for dismantling, loading, lifting, unloading, transport, erection, labour charges for equipments like crane, derrick, chain pulley block, power charges from generator, risk allowance for working at a height of more than 3m, conveyance to site and clearing them after completion of work including cost of trial operation, etc complete and as directed by the departmental officers.

3

-

-

... More
GST 18% IN FIGURES

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.