Water Resources Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date8 Oct 2024
Closing Soon23 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and placing Plain Cement Concrete M15 grade using crusher broken hard granite course aggregate (well graded) of nominal maximum size 60% of 40mm and 40% of 20mm and down graded to I.S specified grading (To achive the specified characteristic strengh of 15N/mm2 in 28 days) and mixing the ingredients in approved mixer including dewatering of the placement site by baling / pumping and diverting wherever necessary placing in layers and vibrating, water curing, finishing the surface with all leads and lifts etc., complete in all respects so as to attain the profile and strengh specified in the approved drawing and specifications, as per the direction of the engineer in charge of works and complying with technical specifications.

1369

-

-

... More
Supplying and erecting centering for sides and soffits incluidng necessary supports and struting upto 3.29m height for vertical sloped surface as detailed below with all cross bracings using mild steel sheets of size 90 cm x 60 cm and 10 BG stiffened with welded mild steel angle of size (25 x 25 x3 ) mm laid over silver oak joists of ssize 10 x 6.5 cm spaced at about 90 cm c/c and supported by casurina props of 10 cm to 13 cm dia spaced not more than 75 cm c/c etc., complete complying with standard speccification and as directed by departmental officers scaffolding and centering charges for the structural components including the cost and conveyance of all materrials to the site including all labour charges and incidental charges etc., complete complying with standard specification and as directed by the departmental officers. without strutting below ground level

635.4

-

-

... More
Supplying and erecting centering for sides and soffits incluidng necessary supports and struting upto 3.29m height for vertical sloped surface as detailed below with all cross bracings using mild steel sheets of size 90 cm x 60 cm and 10 BG stiffened with welded mild steel angle of size (25 x 25 x3 ) mm laid over silver oak joists of ssize 10 x 6.5 cm spaced at about 90 cm c/c and supported by casurina props of 10 cm to 13 cm dia spaced not more than 75 cm c/c etc., complete complying with standard speccification and as directed by departmental officers scaffolding and centering charges for the structural components including the cost and conveyance of all materrials to the site including all labour charges and incidental charges etc., complete complying with standard specification and as directed by the departmental officers.with strutting above ground level

2000

-

-

... More
Supply and fabricating of steel requried for all Rcc works involved in the schedule including cost of steel. Cost of fabrication labour charges for clearing the rods stranghltening,cutting,bending tying grills including over lapping to the required length wherever necessary and placing reinforcement in position as speecified in the drawing including cost of binding wire provision for space bars, cover blocks and all other incidential charges etc., complete complying with standard Specification and as directed by the departmental officers.

22.97

-

-

... More
GST

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.