Water Resources Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Water Resources Department - WRD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Oct 2024
Closing Date22 Oct 2024
Tender Amount₹ 51,09,157
Costs
EMD
₹ 36,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_491523_1Bid Award Id
ViewTender No
2/VBC/C.T-N/24-25/Dt.01.10.24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders hard red gravelly soil inclusive of shoring to full depth, strutting and bailing out water where ever necessary and refilling the sides of foundations with excavated soil other than sand in layers of not more than 15cm thick. well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with an initial lead of 10 meters and initial lift of 2 meters and clearing, levelling the site etc., complete complying with standard specification and as directed by the the Engineer in charge of work.
238
-
-
Providing and placing in Position cement concrete of grade M15 for Plain cement concrete using hard broken stone aggregate of maximum nominal size of 40mm to IS specified grading mixing by mixer machine including dewatering the placement site,laying the concrete in layers and in bays vibrating,compacting and finishing the surface with all leads and lifts watring curing to attain the profile and strength as specified in the drawing for various depth and height below and above ground level etc complete and complying with the standard specification as directed by the Engineer in charge (By using mixer machine).
31.5
-
-
Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 40mm (60%) and 20mm (40%) weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15 N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, vibrating, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.
274.5
-
-
Providing and placing in position of Plain Cement Concrete of grade M 15 using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 15N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, vibrating, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.
80.5
-
-
Providing and placing in position of Reinforced Cement Concrete M20 grade using hard well graded coarse aggregate of maximum nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 20N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing and vibrating to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work.(with vibration)
73.5
-
-
Plastering with Cement mortar 1:4 (One cement and four sand by volume) 20 mm thick including finishing, curing using mixer machine for mixing mortar etc., complete complying with the standard specification and as directed by the Engineer in charge of the works.
231
-
-
Rough stone dry packing using old rough stones for apron and revetment including stacking charges for pre measurement and finishing etc., Complete complying with standard specification and as directed by the Engineer in charge of work.
7.2
-
-
Rough stone dry packing using new rough stones for apron and revetment including stacking charges for pre measurement and finishing etc., Complete complying with standard specification and as directed by the Engineer in charge of work.
22.8
-
-
Supplying and erecting water tight steel centering for sides and soffits including supports and strutting up to height of 3.29 m high for plain surface such as R.C.C.slabs, vertical slabs, side slabs of R.C.C. Works with all cross bracings using mild steel B.G.10 gauge sheets of size 90cm x 60cm stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joists of size 10cm x6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specification and as directed by the by the Engineer in charge of work (The retrieved materials should be taken back by the contractor). The payment for centering should be made after the concrete is laid etc., (With Strutting)
173
-
-
Without strutting
417.5
-
-
Supplying fabricating and placing in position of Ribbed tor steel bars of various diameter for all Reinforced Cement Concrete works including cost of rods, binding wire, Labour Charge for cutting the rods to the required length, bending, tying and fixing in position complete for various height below and above ground level etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work.
24.44
-
-
Providing and fixing weep holes of 110mmdia PVC pipe of working pressure 4Kg/cm2 to a required length for protection wall , Abutment & Wing wall etc., Including cost of all materials to work site including labour charges for 90cm spherical backfill arrangement with 110 mm dia and 20mm size hard granite broken stone charges at the periphery, the labour charges for fixing to drain the back fill etc., Complete complying with standard specification and as directed by the by the Engineer in charge of work.
65
-
-
GST 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements