Water Resources Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Water Resources Department - WRD Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date22 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 74,25,000
Costs
EMD
₹ 47,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_420823_2Bid Award Id
ViewTender No
5SE/TBC/TNY/2023-2024(44)Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 3KMCT by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed , and not exceeding 23 cm thickness, benching of slopes prior to placement of earth fill, including extra earth filling , breaking clods, watering to OMC and compaction of each layer to 95% of Proctor density through deployment of appropriate compaction equipment 8-10 tonne power roller ; vibratory power roller ; short width (+/-)0.90m width drum) power roller or vibratory power roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes through the deployment of hydraulic excavators with steel plate fixtures attached to their booms/ heavy power rollers capable of climbing 2.00 (Horizontal) : 1.00 (Vertical) slope including side slopes as directed by the engineer in charge of works and as per technical specifications.
22300
-
-
... More
Gravel backing for revetment and apron in layers not exceeding 15cm thick, including watering, consolidation and trimming the top surface so as to receive the Rough Stones and including stacking for pre measurement etc., complete complying with standard specification and as directed by the departmental officers
132
-
-
... More
Manufacturing and fixing of M15 grade cement concrete block of size 300X250X200mm using hard broken stone aggregate of maximum nominal size of 20mm including moulding charges casting of blocks, finishing, curing and conveyance of all materials to work site and fixing the same in postion and handling charges for the same in position including all other incidental charges etc., complete complying with standard specification and as directed by the departmental officers.
176
-
-
... More
Providing and placing in position Plain Cement concrete of M-10 using broken hard granite coarse aggregate (well graded) of nominal maximum size of 40mm to IS specified grading and using crushed stone sand(m-sand) ( to achieve the specified characteristic strength of 10 N / mm² in 28 days ) and mixing the incredients in approved mixer including dewatering of the placement site by baling/pumping and diverting wherever necessary placing in layers and watering, curing, finishing the surface with all leads and lifts etc., complete in all respects so as to attain the profile and strength as specified in the approved drawings and specification etc., complete complying with standard specification and as directed by the departmental officers.
75
-
-
... More
Providing and placing in Position of Plain cement concrete of grade M15 using hard broken stone aggregate of maximum nominal size of 60% of 40mm and 40 % of 20mm IS specified grading and using crushed stone sand(m-sand) ( to achieve the specified characteristic strength of 15 N / mm² in 28 days ) and mixing the incredients in approved mixer including dewatering of the placement site by baling/pumping and diverting wherever necessary placing in layers and watering, curing, finishing the surface with all leads and lifts etc., complete in all respects so as to attain the profile and strength as specified in the approved drawings and specification etc., complete complying with standard specification and as directed by the departmental officers.
130
-
-
... More
Supplying and erecting water tight steel centering for sides and sofits including supports and strutting upto 3.29M height for plain surface such as RCC slab, vertical slabs, side slabs of RCC works wioth all cross bracings using mild steel B.G.10gauge sheets of size 90cm x60cmx10 gauge stiffend with welded mils dteel angels of size 25mm x25mmx3mm for boarding laid over silver oak(country wood) joists of size 10cmx6.5 spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete complying with standard specification and as directed by the Engineer incharge of work (The retrieved materials should be taken back by the contractor). The payment should be made after the concrete is laid.
-
-
-
... More
Without Strutting
454
-
-
... More
GST at 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements