Tidel Park Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tidel Park Limited Tender
Machinery and Tools
Eprocure
Opening Date15 Mar 2024
Closing Date26 Apr 2024
Tender Amount₹ 19,88,73,356 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 20,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TIDEC_449180_1Bid Award Id
ViewTender No
TIDEL/2023-24/15Tender Authority
Tidel Park Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Volume_III Technical Specification
BOQ Items
... More
Supply, Installation, Testing and Commissioing of UVGI systems inside AHU cabinet, for the AHU comprising of all the neccesary accessories ie UV Lamps, Aluminium reflector, electronic ballast and all other components. The UV lamps should comply with UL Standard 1995, 153, 1598 as applicable to usage of UVC Emitters in HVAC Equipment. The lamps should be UL certified. The UV lamp should have a life of 18000 hrs. The Power Supply and Fixtures shall be warranted for 10-years. The UVC dose at the extreme edges of the coil shall not be less than 1225 µW/cm2 and end of life intensity on the coil face shall exceed 750 µW/cm2 at the end of the 18000 hours of operation period measured in 2.5 m/s airflow at 13 Deg C. Cost include Power cable, wire, end termination, isolator, conduit and 18G GI earth between UV lamp to electrical panel distance between Electrical panel to UV lamp approx. 50 to 70 RMT (UL Listed /CE Certified).
88
-
-
... More
Supply, Installation, Testing and Commissioing of Fire rated suitable copper armoured XLPE cable for the above unit with suitable perforated Cable tray width 100mm, Tray sheet thickness -1.6 mm, GI Angle support for tray inclusive of bend and reducers.
440
-
-
... More
Supply, Installation, Testing and Commissioing of suitable fire rated Double compression cable gland for the above both the end termination.
470
-
-
... More
Supply, Installation, Testing and Commissioing for 2 run of 12G GI wire for earthing.
608
-
-
... More
Charges for Air balancing works for the above units.
88
-
-
... More
Charges for Water balancing for each AHU.
88
-
-
... More
Supply, Installation, Testing and Commissioing of Limit switch / Bulk head cabling from AHUs to VFD, approx. length shall be 90RMT of 3core 1.5 sq.mm XLPE copper armoured cable with end termination.
88
-
-
... More
Supply, Installation, Testing and Commissioing charges for fire rated canvas connection for the above. Fire rating shall be 300dge 2hrs rating with TDF flange end.
200
-
-
... More
AIR HANDLING UNITS - 15TR
-
-
-
... More
EUROVENT CERTIFIED (HORIZONTAL/VERTICAL TYPE)
Supply, Installation, Testing and Commissioning of Double Skin Air Handling Unit (AHU), panel having 40mm (+/-2mm) thick Puff/Rockwool 48 kg/cum density, inner skin Plain GSS (Zinc 275 GSM) and outer skin Pre-coated GSS shall be 0.8mm thick pre-coated and pre plasticized sheets, 6 ROW deep coil having 13 FPI with coil face velocity 500 FPM and filter face velocity shall be 450 FPM, Direct driven type Backward curved PLUG fans with required high efficiency IE4 Motors -TEFC Squirrel gauge induction motor, commissioning filter, MERV-8 pre filter and MERV-13 bag filter washable type, with Fresh Air and Return Air GI damper and outlet side GI damper, SS 304- 18G drain pan with 19mm thick nitrille insulation, limit switch and safety guard, view panel, required spring mounted vibration isolator for fans, unit base with suitable size of coushy foot mounting. The motor shall comply IEC60034 for construction and IE4 efficiency, Motor winding shall be vacuum pressure impregnated for all motors. Insulated bearing on non-drive end for Motor frame of 315 and above shall be provided. Fans are rated and tested in accordance with AMCA / Eurovent standard to meet the Air and sound performance requirements. Copper header with M.S Adaptor with suitable flange conection to conect the piping, EN1886 / AHRI1350 standard for Thermal transmittance –T2, Thermal bridging –TB2, Casing air leakage – L1, filter bypass leakage – F9, Casing strength – D1. Capacity Minimum of 15 TR- 6000 CFM/ESP not less than 30 mm,Selected Motor rating shall be minimum 15% above BKW. Cost inculde at site Performance test with OEM Engineer. In case AHU is provided with multiple blowers, each blowers sholud be provided with seperate VFD.
AHU Sizes need to customized based on existing site conditon to suit the AHU room sizes wtihout comprimising on the maintance space requirment. Choice of vertical / horizontal shall be decided by client based on site condition to suit the existing space availability.
53
-
-
... More
Supply, Installation, Testing and Commissioing of including Suitable IP 54 Panel, IP20 VFD & PID controller (A0-2.Ai-4, DO-5,DI -5) with by pass Star Delta Starter for operation of AHUs, Supply air fan, auto/manual switch, saftey switch, ammeter, voltmer and energy meter,d isconnet switch VFD Star Delta and THDI not exceeding 35 -40 %, panel shall be as per the IS standard of electrial standard and DC Choke in-built in the drive on the both the side of the limbs , CRCA-14 G / 2mm thick Sheet steel enclosed. Indoor floor mounted free standing cubicle type & CNC fabricated, required BMS compactable for the above operation. Panel having provison for 2Nos of 12v/24 v/230 volt Transformer / Isolator switch for two way valves and limit switch input power requirment and 2Nos of 230 volts power supply for UV lights and fire damper control panel power requirment. Panel should be designed for Fire control operation and BMS compactable type (cost of VFD along with accessories and modbus RS485 provison for BMS integration to be considered).
Note : The THID should not exceed more than 35%-40% in the VFD level and THID should not cross more than 8% at point of coupling,sepearte line item has been provided for harmonic filter quantity below and vendor has to quote accordingly
53
-
-
... More
Supply, Installation, Testing and Commissioing of UVGI systems inside AHU cabinet, for the AHU comprising of all the neccesary accessories ie UV Lamps, Aluminium reflector, electronic ballast and all other components. The UV lamps should comply with UL Standard 1995, 153, 1598 as applicable to usage of UVC Emitters in HVAC Equipment. The lamps should be UL certified. The UV lamp should have a life of 18000 hrs. The Power Supply and Fixtures shall be warranted for 10-years. The UVC dose at the extreme edges of the coil shall not be less than 1225 µW/cm2 and end of life intensity on the coil face shall exceed 750 µW/cm2 at the end of the 18000 hours of operation period measured in 2.5 m/s airflow at 13 Deg C. Cost include Power cable, wire, end termination, isolator, conduit and 18G GI earth between UV lamp to electrical panel distance between Electrical panel to UV lamp approx. 50 to 70 RMT (UL Listed /CE Certified).
53
-
-
... More
Supply, Installation, Testing and Commissioing of fire rated suitable copper armoured XLPE cable for the above unit with suitable perfrated cableTray with 100thick, tray sheet thickness -1.6 mm, GI angle Iron support for tray, inclusive of bend and reducers,
265
-
-
... More
Supply, Installation, Testing and Commissioing of suitable fire rated Double compression cable gland for the above both the end termination
278
-
-
... More
Supply, Installation, Testing and Commissioing for 2 run of 12G GI wire for earthing.
106
-
-
... More
Charges for Air balancing works for the above units.
53
-
-
... More
Charges for Water balancing for the above .
53
-
-
... More
Supply, Installation, Testing and Commissioing of Limit switch / Bulk head cabling from AHU to VFD approx. length shall be 90RMT of 3core 1.5sqmm XLPE copper armoured cable with end termination.
53
-
-
... More
Supply, Installation, Testing and Commissioing charges for Fire rated canvas connection for the above. Fire rating shall be 300dge 2hrs rating with TDF flange end.
120
-
-
... More
AIR HANDLING UNITS - 20TR
-
-
-
... More
EUROVENT CERTIFIED (HORIZONTAL/VERTICAL TYPE)
Supply, Installation, Testing and Commissioning of Double Skin Air Handling Unit (AHU), panel having 40mm (+/-2mm) thick Puff/Rockwool 48 kg/cum density, inner skin Plain GSS (Zinc 275 GSM) and outer skin Pre-coated GSS shall be 0.8mm thick pre-coated and pre plasticized sheets, 6 ROW deep coil having 13 FPI with coil face velocity 500 FPM and filter face velocity shall be 450 FPM, Direct driven type Backward curved PLUG fans with required high efficiency IE4 Motors -TEFC Squirrel gauge induction motor, commissioning filter, MERV-8 pre filter and MERV-13 bag filter washable type, with Fresh Air and Return Air GI damper and outlet side GI damper, SS 304- 18G drain pan with 19mm thick nitrille insulation, limit switch and safety guard, view panel, required spring mounted vibration isolator for fans, unit base with suitable size of coushy foot mounting. The motor shall comply IEC60034 for construction and IE4 efficiency, Motor winding shall be vacuum pressure impregnated for all motors. Insulated bearing on non-drive end for Motor frame of 315 and above shall be provided. Fans are rated and tested in accordance with AMCA / Eurovent standard to meet the Air and sound performance requirements. Copper header with M.S Adaptor with suitable flange conection to conect the piping, EN1886 / AHRI1350 standard for Thermal transmittance –T2, Thermal bridging –TB2, Casing air leakage – L1, filter bypass leakage – F9, Casing strength – D1. Capacity Minimum of 20 TR- 8000 CFM/ESP not less than 30 mm,Selected Motor rating shall be minimum 15% above BKW. Cost inculde at site Performance test with OEM Engineer. In case AHU is provided with multiple blowers, each blowers sholud be provided with seperate VFD.
AHU Sizes need to customized based on existing site conditon to suit the AHU room sizes wtihout comprimising on the maintance space requirment. Choice of vertical / horizontal shall be decided by client based on site condition to suit the existing space availability.
165
-
-
... More
Supply, Installation, Testing and Commissioing of including Suitable IP 54 Panel, IP20 VFD & PID controller (A0-2.Ai-4, DO-5,DI -5) with by pass Star Delta Starter for operation of AHUs, Supply air fan, auto/manual switch, saftey switch, ammeter, voltmer and energy meter,d isconnet switch VFD Star Delta and THDI not exceeding 35 -40 %, panel shall be as per the IS standard of electrial standard and DC Choke in-built in the drive on the both the side of the limbs , CRCA-14 G / 2mm thick Sheet steel enclosed. Indoor floor mounted free standing cubicle type & CNC fabricated, required BMS compactable for the above operation. Panel having provison for 2Nos of 12v/24 v/230 volt Transformer / Isolator switch for two way valves and limit switch input power requirment and 2Nos of 230 volts power supply for UV lights and fire damper control panel power requirment. Panel should be designed for Fire control operation and BMS compactable type (cost of VFD along with accessories and modbus RS485 provison for BMS integration to be considered).
Note : The THID should not exceed more than 35%-40% in the VFD level and THID should not cross more than 8% at point of coupling,sepearte line item has been provided for harmonic filter quantity below and vendor has to quote accordingly
165
-
-
... More
Supply, Installation, Testing and Commissioing of UVGI systems inside AHU cabinet, for the AHU comprising of all the neccesary accessories ie UV Lamps, Aluminium reflector, electronic ballast and all other components. The UV lamps should comply with UL Standard 1995, 153, 1598 as applicable to usage of UVC Emitters in HVAC Equipment. The lamps should be UL certified. The UV lamp should have a life of 18000 hrs. The Power Supply and Fixtures shall be warranted for 10-years. The UVC dose at the extreme edges of the coil shall not be less than 1225 µW/cm2 and end of life intensity on the coil face shall exceed 750 µW/cm2 at the end of the 18000 hours of operation period measured in 2.5 m/s airflow at 13 Deg C. Cost include Power cable, wire, end termination, isolator, conduit and 18G GI earth between UV lamp to electrical panel distance between Electrical panel to UV lamp approx. 50 to 70 RMT (UL Listed /CE Certified).
165
-
-
... More
Supply, Installation, Testing and Commissioing of Fire rated suitable copper armoured XLPE cable for the above unit with suitable perforated Cable tray width 100mm, tray sheet thickness -2mm, GI Angle support for tray, inclusive of bend and reducers.
968
-
-
... More
Supply, Installation, Testing and Commissioing of suitable fire rated Double compression cable gland for the above both the end termination.
968
-
-
... More
Supply, Installation, Testing and Commissioing for 2 run of 12G GI wire for earthing.
330
-
-
... More
Charges for Air balancing works for the above units.
165
-
-
... More
Charges for Water balancing for the above .
165
-
-
... More
Supply, Installation, Testing and Commissioing of Limit switch / Bulk head cabling from AHU to VFD, approx. length shall be 90RMT of 3core 1.5sqmm XLPE copper armoured cable with end termination.
165
-
-
... More
Supply, Installation, Testing and Commissioing charges for fire rated canvas connection for the above. Fire rating shall be 300dge 2hrs rating with TDF flange end.
350
-
-
... More
AIR HANDLING UNITS - 25TR
-
-
-
... More
EUROVENT CERTIFIED (HORIZONTAL/VERTICAL TYPE)
Supply, Installation, Testing and Commissioning of Double Skin Air Handling Unit (AHU), panel having 40mm (+/-2mm) thick Puff/Rockwool 48 kg/cum density, inner skin Plain GSS (Zinc 275 GSM) and outer skin Pre-coated GSS shall be 0.8mm thick pre-coated and pre plasticized sheets, 6 ROW deep coil having 13 FPI with coil face velocity 500 FPM and filter face velocity shall be 450 FPM,Direct driven type Backward curved PLUG fans with required high efficiency IE4 Motors -TEFC Squirrel gauge induction motor, commissioning filter, MERV-8 pre filter and MERV-13 bag filter washable type, with Fresh Air and Return Air GI damper and outlet side GI damper, SS 304- 18G drain pan with 19mm thick nitrille insulation, limit switch and safety guard, view panel, required spring mounted vibration isolator for fans, unit base with suitable size of coushy foot mounting. The motor shall comply IEC60034 for construction and IE4 efficiency, Motor winding shall be vacuum pressure impregnated for all motors. Insulated bearing on non-drive end for Motor frame of 315 and above shall be provided. Fans are rated and tested in accordance with AMCA / Eurovent standard to meet the Air and sound performance requirements. Copper header with M.S Adaptor with suitable flange conection to conect the piping, EN1886 / AHRI1350 standard for Thermal transmittance –T2, Thermal bridging –TB2, Casing air leakage – L1, filter bypass leakage – F9, Casing strength – D1. Capacity Minimum of 25 TR- 10000 CFM/ESP not less than 30 mm,Selected Motor rating shall be minimum 15% above BKW. Cost inculde at site Performance test with OEM Engineer. In case AHU is provided with multiple blowers, each blowers sholud be provided with seperate VFD.
AHU Sizes need to customized based on existing site conditon to suit the AHU room sizes wtihout comprimising on the maintance space requirment. Choice of vertical / horizontal shall be decided by client based on site condition to suit the existing space availability.
15
-
-
... More
Supply, Installation, Testing and Commissioing of including Suitable IP 54 Panel, IP20 VFD & PID controller (A0-2.Ai-4, DO-5,DI -5) with by pass Star Delta Starter for operation of AHUs, Supply air fan, auto/manual switch, saftey switch, ammeter, voltmer and energy meter,d isconnet switch VFD Star Delta and THDI not exceeding 35 -40 %, panel shall be as per the IS standard of electrial standard and DC Choke in-built in the drive on the both the side of the limbs , CRCA-14 G / 2mm thick Sheet steel enclosed. Indoor floor mounted free standing cubicle type & CNC fabricated, required BMS compactable for the above operation. Panel having provison for 2Nos of 12v/24 v/230 volt Transformer / Isolator switch for two way valves and limit switch input power requirment and 2Nos of 230 volts power supply for UV lights and fire damper control panel power requirment. Panel should be designed for Fire control operation and BMS compactable type (cost of VFD along with accessories and modbus RS485 provison for BMS integration to be considered).
Note : The THID should not exceed more than 35%-40% in the VFD level and THID should not cross more than 8% at point of coupling,sepearte line item has been provided for harmonic filter quantity below and vendor has to quote accordingly
15
-
-
... More
Supply, Installation, Testing and Commissioing of UVGI systems inside AHU cabinet, for the AHU comprising of all the neccesary accessories ie UV Lamps, Aluminium reflector, electronic ballast and all other components. The UV lamps should comply with UL Standard 1995, 153, 1598 as applicable to usage of UVC Emitters in HVAC Equipment. The lamps should be UL certified. The UV lamp should have a life of 18000 hrs. The Power Supply and Fixtures shall be warranted for 10-years. The UVC dose at the extreme edges of the coil shall not be less than 1225 µW/cm2 and end of life intensity on the coil face shall exceed 750 µW/cm2 at the end of the 18000 hours of operation period measured in 2.5 m/s airflow at 13 Deg C. Cost include Power cable, wire, end termination, isolator, conduit and 18G GI earth between UV lamp to electrical panel distance between Electrical panel to UV lamp approx. 50 to 70 RMT (UL Listed /CE Certified).
15
-
-
... More
Supply, Installation, Testing and Commissioing of Fire rated suitable copper armoured XLPE cable for the above unit with suitable perforated Cable tray width 100mm, Tray sheet thickness -2mm, GI Angle support for tray, inclusive of bend and reducers.
83
-
-
... More
Supply, Installation, Testing and Commissioing of suitable fire rated Double compression cable gland for the above both the end termination
96
-
-
... More
Supply, Installation, Testing and Commissioing for 2 run of 12G GI wire for earthing.
30
-
-
... More
Charges for Air balancing works for the above units.
15
-
-
... More
Charges for Water balancing for the above.
15
-
-
... More
Supply, Installation, Testing and Commissioing of Limit switch / Bulk head cabling from AHUs to VFD, approx. length shall be 90RMT of 3core 1.5sqmm XLPE copper armoured cable with end termination.
15
-
-
... More
Supply, Installation, Testing and Commissioing charges for Fire rated canvas connection for the above. Fire rating shall be 300dge 2hrs rating with TDF flange end.
45
-
-
... More
CHILL WATER - PIPING & ASSOCIATED WORKS Supply, Installation, Testing and Commissioing of Insulated Chilled Water Piping and valves. All valves shall be insulated similar to the pipe specifications. All Valves shall be PN 16 Rated. Pipes laid above ground / Trench with Elastomeric Rubber insulation & covered Insulation & Aluminium Cladding as per technical specification. All Bolts / Nuts should be Galvanised used in the chilled water piping. Thermal Insulation of specified thickness of Elastromeric Rubber. Insulation materials manufactured as per ASTM E 84 test & which should also meet NFPA 90A supplementary materials for Chilled Water Piping System which should not absorbs less 0.2% water by volume (ASTM c 209), should not support microbial growth (ASTM C1071, G21, G22) and should emit objectionable odors (ASTM C 665) and should have thermal conductivity of 0.27 ( R - 2.78 in 3.4" thickness) and water vapor permeance of 0.10. Joints should be sealed with 50 mm wide 3 mm thick self adhesive tape (Black Cotton Tape not acceptable) with Class "O" Material. Outer finish of insulation should be 24 G Aluminium Cladding, 32mm thick insulation shall be provided for pipes 80 mm dia and above. For pipes with dia less than 80 mm - 25 mm thick insulation shall be provided. Chilled water pipe insulation should be provided with Aluminium cladding Finish which is factory laminated (site lamination wont be acceptable). Chilled Water Piping running in terrace level should have UV Resistant Tape over & above (insulation should be with low VOC content). Chilled water pressure test need to done after completion of pipelinewelding works). Cost inclusive of M.S related works for chiiled water piping support materials, puff saddle along with Enamel painting works where ever required
-
-
-
... More
350mm dia
3
-
-
... More
300mm dia
3
-
-
... More
250mm dia
3
-
-
... More
200mm dia
3
-
-
... More
150mm dia
3
-
-
... More
125mm dia
25
-
-
... More
100mm dia
85
-
-
... More
80 mm dia
1100
-
-
... More
65 mm dia
1780
-
-
... More
50 mm dia
1480
-
-
... More
40 mm dia
355
-
-
... More
Supply and erection of Thermal Insulated and 24 G Aluminium Cladding Butterfly valves as per specification complete with Thermal insulated end flanges / matching flanges, additional supports, fixing accessories, etc. The valve shall be PN16 type of VALVES
-
-
-
... More
125mm dia
5
-
-
... More
100mm dia
10
-
-
... More
80 mm dia
265
-
-
... More
65 mm dia
410
-
-
... More
50 mm dia
300
-
-
... More
Supply and erection of Thermal Insulated,24 G Aluminium Cladding and gun metal screwed type Manual Balancing Valves confirming to the BS:5154 or equivalent and cast iron flanged type confirmed to BS:1452 or equivalent, rated PN 16
-
-
-
... More
125mm dia
5
-
-
... More
100mm dia
8
-
-
... More
80 mm dia
140
-
-
... More
65 mm dia
30
-
-
... More
50 mm dia
2
-
-
... More
Supply and erection of of PURGE/ DRAIN Valves.
-
-
-
... More
12mm/15mm dia
321
-
-
... More
Supply and erection of Thermal Insulated ,24 G Aluminium Cladding ‘Y’ type strainer with removable stainless steel screen with 3mm perforation and permanent magnet, drain piping. Rate shall inclusive of insulated end flanges/matching flanges, additional supports, fixing accessories, etc.
-
-
-
... More
80 mm dia
2
-
-
... More
65 mm dia
180
-
-
... More
50 mm dia
150
-
-
... More
Supply, Installation, Testing and Commissioning of Thermal Insulated,24 G Aluminium Cladding 3-Way Modulating Valve with companion PN16 flanges with Actuator & Thermostat for AHU flow control for the following sizes. Make and Specification should be matched with the existing 3-way modulating valves at site
-
-
-
... More
65 mm dia
1
-
-
... More
50 mm dia
1
-
-
... More
Supply, Installation, Testing and Commissioning of Thermometers of approved make & shall be of mercury in steel type with range suitable for the temperature services. It should be installed in the thermowells as explained in the tender specifications.
656
-
-
... More
Supply, Installation, Testing and Commissioning of Pressure guages shall be of Bourdon (100 mm) type with range selected so that normal operation is near to middle of the scale. Syphons and cocks to be provided along with SS snubber.
656
-
-
... More
Supply, Installation, Testing and Commissioning of Automatic Air Vents shall be installed at all high sections of piping as well as in the AHU room piping. The discharge from this air vents shall be piped via copper tubes of appropriate size to the nearest waste drain pipe.
321
-
-
... More
LOW SIDE WORKS
-
-
-
... More
DOUBLE SKIN PLENUM for AHU's
Supply, Installation, Testing of All Sheet metal cabinet type double skin air plenum section for Air Handling Units supplied by Developer. The plenum shall be constructed using double-skinned acoustic panels with minimum 0.6 mm thick pre-coated G S sheet for outer skin and & minimum 0.6 mm plain G S sheet for inner skin of the unit. All the panels shall incorporate 25 mm thick PUF insulation sandwiched in between inner & outer skin. Double skin Plenum with all supports suiting to site conditions. Plenum colour shall be similar to the existing AHU.
1535
-
-
... More
Rectangular Ducting Works using with Ductmate Flanges (TDF) for all sizes of the duct. Supply, Installation, Testing of GI Ducts, Galvanizing shall be Class VIII – light coating of zinc, nominal 120 gm / sqm surface area and Lock Forming Quality prime material alongwith mill test certificates. In addition, if deemed necessary, samples of raw material, selected at random by owner’s site representative shall be subject to approval and tested for thickness and zinc coating at contractor’s expense.
All duct construction and installation shall be in accordance with SMACNA standards. In addition ducts shall be factory fabricated utilizing the following machines to provide the requisite quality of ducts. All ducts shall be fabricated and installed in workmanlike manner, conforming to relevant SMACNA codes. Above the size of 1000mm width duct bends Vanes to be considered every 300mm once cost inclusive of this items.
The Duct shall be supported with specified Supports at regular interval as mentioned in the technical specifications. (To ensure the air tightness, All ducts shall be checked with third party Pressure test (500Pa) after completion of installation but before applying insulation) and report should be submit to PMC/Client. (Cost inclusive of Acrylic fire stop sealant fire sealent with nessarry supporting meatrials)
-
-
-
... More
26 G Ducting with TDF flanges(0-550mm)
55
-
-
... More
24 G Ducting with TDF flanges(551-900mm)
1178
-
-
... More
22 G Ducting with TDF flanges(901-1200mm)
740
-
-
... More
20 G Ducting with TDF flanges(1201-1600mm)
1315
-
-
... More
18 G Ducting with TDF flanges(1601 & above)
670
-
-
... More
Supply, Installation, testing of Volume Control Dampers made of 100 x 40 x 1.55 mm thick galvanised steel frame and Blades should be of 1.55 mm Galvanised steel sheet for Rectangular duct.
115
-
-
... More
Supply & Installations of Fire dampers CBRI Standard for AHU supply & return air ducts. 16 Guage -frame & 16 Guage Blade to be considered. Interlocking of fire dampers using copper control wiring and requisite relays with existing AHU starter panel shall be affected as required. The dampers shall be BMS compatible as per the specifications. UL 555S Leakage Rating Leakage Class: I or II, Damper shall be Multi-blade type damper with 2.0 hours Fire rating.
3
-
-
... More
Supply & Installations of Actuators with Control Panel for above fire dampers - HIGH TORQUE TYPE-10/15 NM (Actuators shall be spring return type. 24 / 230 VAC) Panel should be compatible for third party BMS integration. Necessary fire integrator should be consider in part HVAC vendor scope.
2
-
-
... More
CABLES and END TERMINATIONS.
Supply, Laying, Testing & Commissioning of M.S insulated M.S sheathed, Steel armoured, Aluminium conductors 1100 V grade power cables. The cables shall be laid in tray built up trench etc., Rate shall exclude the cost of tray.
-
-
-
... More
3 runs of 2.5 sq.mm FRLS Cu Wire in 19 mm dia M.S Conduit for damper panel to Fire dampers
10
-
-
... More
3 runs of 2.5 sq.mm FRLSCu Wire in 19 mm dia M.S Conduit for AHU panel to Fire damper
10
-
-
... More
Supply and Installation of Accoustic Duct liner (Insulation) of specified thickness of Elastromeric Rubber Insulation manufactured as per ASTM E 84 Test & which should also meet NFPA 90A supplementary materials for air distribution system, which should not absorbs less 0.2% water by volume (ASTM c 209), should not support microbial growth (ASTM C1071, G21, G22) and should emit objectionable odors (ASTM C 665) and should have thermal conductivity of 0.27 ( R - 2.78 in 3.4" thickness) and water vapor permeance of 0.10. - Class "1" Material(FM APPROVED). Insulation should be sealed with 50 mm wide,3 mm thick self adhesive tape (Black Cotton Tape not acceptable).
-
-
-
... More
10 mm thick
3850
-
-
... More
Supply and Installation of Thermal Insulation of specified thickness of Elastomeric Rubber Insulation manufactured as per ASTM E 84 Test & which should also meet NFPA 90A supplementary materials for Air Distribution System which should not absorbs less 0.2% water by volume (ASTM c 209), should not support microbial growth (ASTM C1071, G21, G22) and should emit objectionable odors (ASTM C 665) and should have thermal conductivity of 0.27 ( R - 2.78 in 3.4" thickness) and water vapor permeance of 0.10. Insulation Joints should be sealed with 100 mm wide, 3mm thick self adhesive tape (Black Cotton Tape not acceptable). Class "O" Material-Material should be FM approved. For internal ducts ,insulation should be provided without any patches. One coat adhesive to be provide on surface of duct & material should be provided.
-
-
-
... More
9 mm thick
50
-
-
... More
Supply & Installations of Insulated UPVC Condensate Drain piping as per specification as mentioned in the document, insulated same as chilled water piping but without polyshield covering. Consider drip pans with drian pipe. Entire draine pipe needs to be insulated with 6mm thick Nitrile rubber.
-
-
-
... More
50 mm dia
1600
-
-
... More
40 mm dia
1200
-
-
... More
32mm dia
740
-
-
... More
Pedestals : Providing & Laying of Reinforced cement concrete of M20 grade at the level given below, using river sand, 20 mm as down size coarse aggregates, application of necessary admixtures as specified by consultants inclding all leads and lifst, scaffolding wheever necessary, curing as directed, including the cost of shuttering, centering and staging for required height and including rubber pads.
104
-
-
... More
Chipping, chassing & Plastering the wall openings in cement mortor 1:6 of 15 mm thick finishing to line and level with sand faced finshing at all levels, including all leads & lifts, scaffolding, curing etc complete (for SA & RA openings in ahu rooms, opgs for CHW pipes etc)
26
-
-
... More
GYPSUM CEILING - Providing and fixing in position multi level Exterior grade GYPSUM board false-ceiling suspended on G.I. frame work in design as shown in the drawing. The G.I. frame work consists of 15 x 15mm Shadow Gap Perimeter channel of size 30mm x 27mm x 0.5mm to be screw fixed to the brick wall/ partition with the help of nylon sleeves and screws, at 610 mm centers . Intermediate channel of size 45mm x 0.9mm thick with two flanges of 15mm each . from the soffit at 1220 mm centers with G.I.ceiling angle of size 25 mm x 10 mm x 0.50 mm thick fixed to the soffit with the G.I.cleat and steel expansion fasteners. Ceiling section of 0.55 mm thick having knurled web of 51.5 mm and two flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channels at 457 mm centers. Tapered edge 12.5 mm thick Gyp board (conforming to IS - 2095 - 1982 ) is then screw fixed to ceiling section with 25 mm dry wall screws at 230 mm centers. Screw fixing is done mechanically either with screw driver or drilling machine with the suitable attachment. Finally the boards are to be joined and finished so as to have a flush look which include filling and finished the tapered and square edges of the boards with jointing compound, paper tape and two coats of primer suitable for gypboard. Rate includes making provision for fixing light fixtures smoke detectors and trap doors with locking arrangements. All components to be of India Gypsum. Supply of scaffolding with necessary supporting material.
(Note: Vendor has to take site visit and consider the same before bidding).
250
-
-
... More
Covering and protecting the existing facility with 2mm thick plastic corrugated sheet over the floor, walls and furniture as required during the work tenure. Cost to include removing and disposal of the protective sheet once the work is over. Any damage to the sheet due to the transport of material or any other reason needs to be replaced and no extra charges shall be paid for the same.
Providing house keeping services to ensure cleanliness on site during execution of the project.
1
-
-
... More
REFURBISHMENT WORK
-
-
-
... More
Removing of existing single skin plenum (along with insulation).
1661
-
-
... More
Removing of existing duct (along with insulation).
4050
-
-
... More
Removing of existing chilled water pipe along with insullation and including gysum ceiling breaking if reuired.
5855
-
-
... More
Removing and refixing of existing below VCD with all nessary supporting material.
160
-
-
... More
Removing and refixing of existing below Fire damper with all nessary supporting material.
200
-
-
... More
Removal of existing Air Handling units along with valve packages, Safe removal, proper packing, shifting, lifting and relocating to client specified location.
-
-
-
... More
10 TR
94
-
-
... More
15 TR
53
-
-
... More
20 TR
174
-
-
... More
25 TR
15
-
-
... More
BMS Refurbisment
-
-
-
... More
Removing and re-fixing of below, BMS field devices along with related cables. Esnure that the device / sensor along with cable is properly protected and safely installed post completion of piping/ New AHU installation. Refer IO summary and ensure all field devices, cabling and all accessories are saefly removed and reinstalled.
(i) Return Air Temperature sensor along withe related cabling.
(ii) Return Air RH sensor along withe related cabling.
(iii) Supply Air Temperature along with cabling.
(iv) DP swith for Fan along with cabling.
(v) Starter panel cabling (for Command, Auto/Manual status, Trip status, Run status, Fire Trip status).
(vi) CHW valve status and command cables.
(vii) DP swith for Filters along with cabling.
(viii) Fire Trip status cabling.
(ix) Fire damper status cabling.
336
-
-
... More
Supply, installation, testing and commissioning of Expansion IO modules with 1 AI and 1 AO point minimum capacity to integrate VFD's for speed control and feedback. These modules should be installed in the existing DDC controller. (Make of IO module should be Trend supported and inline with the same make installed at site in the existing controller)
321
-
-
... More
4 Core 1.0 SQ. MM, GI unarmored ATC conductor multistrand, screened cable in 19 mm dia MS conduit between IO module and VFD
5778
-
-
... More
Testing/Commissionig of existing Trend controller post addition of IO modules. Necessary logic implementation in the controller as defined by client to be considered as part of scope
321
-
-
... More
Graphics upgdration to capute additional VFD's, software licensing in the main BMS software. Cost shall incuude all related accessories to enable VFD speed control and feedback
1
-
-
... More
Removing of existing starter panel with nessarry supporting materials to client specified area. All the cables to be properly disconnected from the starter panel and properly wrapped with insulation tapes. Post installation of the new starter panels, these cables shall be terminated in the new starter panels both on motor side as well and starter side. necessary termination lugs/glands to be considered. Cost of the same shall be inclusive in this item .
336
-
-
... More
Removing and re-fixing of existing MS conduit and cable along with nessarry supporting materials.
336
-
-
... More
Removing and re-fixing of BTU meters with all nessary supporting Materials to client specified area.
336
-
-
... More
Removing and re-fixing of Fire damper and Actuator with all nessary supporting Materials to client specified area.
600
-
-
... More
Removing storing client specified location and re-fixing of 3 way modulating valves with nessarry supporting materials.( Cost inclusive of removing existing insulation and providing new thermal insulation along with 24 G aluminium cladding to 3-way valves while refxing)
321
-
-
... More
Generation of Shop drawing and as-built drawing of HVAC layout in Autocad format, As built drawing should consist of below info as minimum. Necessary instruments /equipments required to identify the duct routing and sizes to be considered along with necessary grid / tile openings / gypsum openings at minimal locations as required to be considered.
1. AC unit capacities including AHU units etc.
2. Ducting layout indicating thermal and acoustic insulation.
3. Type and sizes of all the Air Teminal devices like VCD, Fire damper, Sound attenuator, Grille, Diffuser, Collar damper etc
4. All other equipments / items related to HVAC. (Note: These drawings to be developed before generation of shop drawings).
1
-
-
... More
ACTIVE HARMONIC FILTERS RELATED ELECTRICAL WORK
NOTES :- The AHF sizing (Active Harmonic Filter) given in the BOQ are only approximate and the contractor has to take actual Harmonic study at site for the exact Sizing of AHF required size before purchase of materials required for the work and Post installation detail harmonic study has to done and report need submited
-
-
-
... More
Design, Supply, Erection, Testing and Commissioning of 3Phase 3 wire / 4 wire system 250Amps IGBT based Active Harmonic filter with inbuilt Pf compensation (Leading as well as Lagging), 2nd to 50th Order Selection Flexibility, Filter should have Ethernet communication and Internal busbar should be copper (Both main and earth busbar), adequate size cables and suitable accessories
2
-
-
... More
Design, Supply, Erection, Testing and Commissioning of 3Phase 3 wire / 4 wire system 375Amps IGBT based Active Harmonic filter with inbuilt Pf compensation (Leading as well as Lagging), 2nd to 50th Order Selection Flexibility, Filter should have Ethernet communication and Internal busbar should be copper (Both main and earth busbar), adequate size cables and suitable accessories
2
-
-
... More
BREAKERS & ISOLATORS
-
-
-
... More
Supply, Erection, Testing and Commissioning of 400Amps 50kA TPN MCCB with Standard Enclosure with including suitable accessories
4
-
-
... More
CALBLES AND END TERMINATION
NOTES :- The Quantities (mtrs) given in the BOQ are only approximate and the contractor has to take actual measurements at site for the exact quantities of materials required before purchase of materials required for the work.
-
-
-
... More
Supply, laying, testing & commissioning of the following sizes of 1.1KV grade Aluminium / Copper Conductor armoured power cables Insulation of XLPE above 25Sqmm and Class A PVC below 25Sqmm laid on trays, ceilings, walls trenches, ground etc., with necessary clamps, cable ties, fasteners, identification tags, cable marking as required. Cost of sand, bricks, excavation should not be included in the rate quoted & measured separately.
-
-
-
... More
1C-240Sq.mm XLPE Cu. Ar CABLE (For Transformr-1-4)
660
-
-
... More
Supply & end termination of following AL/CU armoured power cables with necessary double compression brass glands, AL/CU. terminal sockets, insulation tapes, fasteners, earthing clips & connecting the clip to main earth bus with suitable bare copper wire complete accessories as required; all outdoor double compression and indoor single compression
-
-
-
... More
1C-240Sq.mm XLPE Cu. Ar CABLE (For Transformr-1-4)
16
-
-
... More
Preparation of CEIG drawings, Liasioning with CEIG for getting drawing approval, arranging inspection, getting safety certificate & preparation& submission of AS BUILT drawings. Four Sets of paper print of as built drawings& a soft copy of these drawings to be submitted to the clients while completion. (All statutory fees to be paid in this regard will be reimbursed by the client on submission of receipt & should not be included in this item).
1
-
-
... More
BUY BACK OF OLD ITEMS
-
-
-
... More
Buy back of Old 336 Nos. of Air Handling Units(AHU) and its accessories as mentioned below. (Cost should be inclusive on transporting)
i) Old Air Handling Units.
ii) Old GI ducting and VCD.
iii) Old Chilled water pipings.
iv) Valve packages excluding 3-way modulating valve.
v) AHU Starter panel.
(Note: Vendor has to take site visit and consider the same before bidding).
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements