Tidel Park Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tidel Park Limited Tender

Civil And Construction
Software and IT Solutions
Consultancy Services
Aerospace and Defence
Eprocure
Opening Date23 Mar 2022
Closing Date22 Apr 2022
Tender Amount₹ 45,97,26,811 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BMS interfacing type microprocessor controlled Roof top air-cooled liquid chiller package suitable for refrigerant R-134a having multiple screw type compressors (semi hermetic type) complete with suction and discharge shut off valves, automatic safety control HP/LP cutouts, oil pressure failure switch, gauge panel, crankcase heater, automatic capacity control, condenser coils, fans relief valve, flooded chiller with shell and tube evaporater, multiple circuits, controls such as thermostatic expansion valve, cooling thermostat, antifreeze thermostat, water pressure/flow switch for double circuit system as per drawing, differential pressure switch, integral refrigerant pipes & fittings, stainer, sight glass, isolating valves, suction piping and chiller, 20mm dia chiller drain valve, sight glass, insulation, first charge of gas and oil, base frames, rubber isolation bellows, vibration isolation springs, integral wiring. Unit mounted microprocessor-based panel (BACnet Confirmatory and IBM compatible, complete with chiller sequencing management with built-in self diagnostic capability, quickly pin point the location of any system problem. Unit mounted isolator/fuse switch etc capable to handle the cooling requirements as detailed below.

-

-

-

... More
Important Note: The minimum Co-efficient of performance (COP) of chillers shall meet to 3.1 or above at AHRI conditions.

-

-

-

... More
For copper coil with Aluminium fins 2 years DLP from the date of commissioning and handing over and for E coated AL-Al condenser coils 2 years DLP from the date commissioning and hand over Plus minimum ten(10) years Warraty for condenser coil with consumables and oil if any rework, cost includes sea freight and local transport, import duty, local tax local clerance at port, local transport, loading and unloading, erection of chillers using suitable telescopic crane to shift site to respective location, insurance from chiller factory to site.Cost also shall inclusive of site performance test with OEM Engineer.

-

-

-

... More
Chillers capacity of each chilling unit will be as follows:

-

-

-

... More
Capacity : 250 TR (minimumm) at 45° C Ambient for Data Center in-row cooling (2W+2S+6F) (We have not considered the future quantities in the tender BOQ) The Rate shall be inclusive of rapid restart of chillers.

4

-

-

... More
Water in : (+) 20 Deg. C

-

-

-

... More
Water Out: (+) 15 Deg. C

-

-

-

... More
Fouling factor : 0.0001 FPS units

-

-

-

... More
Capacity : 350 TR (minimumm) at 42° C Ambient (3W+1S) for Comfort cooling

4

-

-

... More
Water in : (+) 12 Deg. C

-

-

-

... More
Water Out: (+) 7 Deg. C

-

-

-

... More
Fouling factor : 0.0001 FPS units

-

-

-

... More
Necessary sockets and nipples with shut off valves for mounting sensors/transmitters on pipe line to interface the BMS system.

2

-

-

... More
CHILLER PLANT MANAGER

-

-

-

... More
CPM shall control the following items and shall have provision for sharing all the parameters relevant to chillers and pumps with BMS through software integration (BACNET PROTOCOL).Memory map for all the above shall be furnished longwith technical submittals.Necessary sensors for operating the CPM shall be part of chiller . CPM supplier.An additional noe no. temperature sensor(apart from the requirement of CPM operation) needs to be included for mounting in the Primary-secondary bypass line. The control signal cables and LAN cables along with rigid GI conduit intagrating all equipment to CM shall also be included in the scope of CPM.

-

-

-

... More
Data Center Cooling - Air cooled chiller Bank 1 - 10 Nos.(2W+2S+6F) for CHW temperature of inlet 20 Deg C and outlet of 15 Deg C.

-

-

-

... More
Comfort Cooling - Air cooled chiller Bank 2 - 4 Nos.(3W+1 S) for CHW temperature of inlet 12 Deg C and outlet of 7 Deg C.

-

-

-

... More
Data Center Cooling - Primary chilled water pumps for chiller Bank 1 - 10 Nos - (2W+2S+6F)

-

-

-

... More
Data Center Cooling - Secondary Chilled water pumps with VFD for chiller Bank 1 - 6 Nos (1W+1S+4F)

-

-

-

... More
Comfort Cooling - Primary chilled water pumps for chiller Bank 2 - 4 Nos (3W+1S)

-

-

-

... More
Comfort Cooling - Secondary Chilled water pumps with VFD for chiller Bank 2 - 3 Nos (2W+1S)

-

-

-

... More
Motorised Butterfly valve for Chiller Bank 1 - 35 Nos

-

-

-

... More
Motorised Butterfly valve for Chiller Bank 2 - 5 Nos

-

-

-

... More
Immersion temp sensor with well - 2 Nos (Each chiller bank - 1 No)

-

-

-

... More
Combined temeprature and RH sensor - 2 Nos (Each chiller bank - 1 No)

-

-

-

... More
DP Sensors across chillers for Chiller bank 1 - 10 nos

-

-

-

... More
DP Sensors across chillers for Chiller bank 2 - 4 nos

-

-

-

... More
Chiller plant manager shall able to control and monitor above and shall have open protocol to communicate to BMS.

2

-

-

... More
The rate quoted in the above shall be inclusive of Cantilevered cat walk grating from the curb of pedestal to provide easy and trouble free access, weather protective cowl for electrical panel and all special tools and tackles for operation, assembling, commissioning and maintaining the chiller unit. It shall be supplied/ provided by the ACMV Contractor.

-

-

-

... More
CHILLED WATER PUMPS

-

-

-

... More
To design, supply, installation, and commissioning of the following items as shown on the equipment data and drawings for complete and satisfactory operation and control to local authorities approval.

-

-

-

... More
Energy efficient, BAS interfacing type chilled water pumps having required capacity against the selected head with C.I. casing, bronze impleller mechanical seal, stainless steel shaft sleeve, integral motors complete with Factory made weather cowl, acoustic box, drive guard, 25x25x3 mm thick nosing angle frame with flating foundation, suction diffuser, inertia block with, vibration spring isolators, isolation sleeves, insulated drip tray stainless steel foundation bolts etvc. as per specification and technical schedule of equipment.

-

-

-

... More
The pump motor shall be suitable for 415V+/- 10% Volts, 50 +/- 5% Hz, +/- 10% combined voltage and frequency variation, 3 phase AC power supply. The squirrel cage induction type, TEFC enclosure, class 'F' insulation and shall be connected the pump through a high tensile Aluminium slit type spacercoupling to permit servicing of the mechanical seal without disturbing pump, motor or electrical wiring. Coupling shall be protected by a motor. All motor efficiency shall comply to IE3.

-

-

-

... More
Primary Chilled water pumps (Constant flow)

-

-

-

... More
Type : Back pullout pumps (constant flow) for Comfort cooling (Office and Common area)

4

-

-

... More
Flow : 935 USGPM

-

-

-

... More
Temp range : (-) 5 Deg C upto 35 Deg C

-

-

-

... More
Total Head : 15mtr

-

-

-

... More
Indicative Motor rating : 15.0KW/1450 Rpm

-

-

-

... More
Mechanical Seal - Internal Self - flushing type

-

-

-

... More
Type : Back pullout pumps (constant flow) for Data center Rack cooling

4

-

-

... More
Flow : 665 USGPM

-

-

-

... More
Temp range : (-) 5 Deg C upto 35 Deg C

-

-

-

... More
Total Head : 15.0mtr

-

-

-

... More
Indicative Motor rating : 11.0 KW/1450 Rpm

-

-

-

... More
Mechanical Seal - Internal Self - flushing type

-

-

-

... More
Secondary Chilled water pumps (Variable flow)

-

-

-

... More
Type : Back pullout pumps (variable flow) - for Comfort cooling (Office and Common area)

3

-

-

... More
Flow : 1405 USGPM

-

-

-

... More
Temp range : (-) 5 Deg C upto 45 Deg C

-

-

-

... More
Total Head : 35mtr

-

-

-

... More
Motor rating : 45.0KW/1450 RPM

-

-

-

... More
Mechanical Seal - Internal Self - flushing type

-

-

-

... More
Secondary CHW pump 3 nos of VFD - 2 Working + 1 standby

-

-

-

... More
Type : Back pullout pumps (variable flow) for critical area (Data center and MMR room rack cooling)

2

-

-

... More
Flow : 1330 USGPM

-

-

-

... More
Temp range : (-) 5 Deg C upto 45 Deg C

-

-

-

... More
Total Head : 35mtr

-

-

-

... More
Motor rating : 45.0KW/1450 RPM

-

-

-

... More
Secondary CHW pump 2 VFD - 1 Working + 1 Standby

-

-

-

... More
Supply, Installation, testing and commissioning of Variable speed drives (Frequency controller and auto bypass) VFD panels for the following pumpsets complete with necessary pressure sensors / transmitters / temperature sensor. Microprocessor based pump logic controller, suitably integrated with adjustable frequency drive in a single enclosure and capable to control necessary AFD for multiple pumpsets. Parallel pump software duly downloaded and integrated with pump system. VFD panels shall be supplied with mounting frames and power wires / control wiring between pump motor, AFD and pump logic controller, The integrated power cabling and control wiring between adjustable frequency driver and logic controller panel and for sensor shall be included in the cost. The Voltage harmonics within 5% and current harmonics within 15% as per IEEE 519 standard.

-

-

-

... More
Secondary CHW pump 3 VFD - 2 Working + 1 Standby

3

-

-

... More
Secondary CHW pump - Critical areas - 2 VFD - 1 Working + 1 Standby

2

-

-

... More
Supply, Installation, testing and commissioning of power and control wiring between pump motor, AFD and pump logic controller

1

-

-

... More
Pump design parameter furnished in the BOQ and in the specification is of indicative in nature, If the actual parameter required to meet the proposed configuration, then the same shall be prpovided by AC Contractor based on the final selection without any cost implication to the Owner.

-

-

-

... More
AIR HANDLING UNITS, CEILING SUSPENDED UNITS AND HEAT RECOVERY WHEELS

-

-

-

... More
To design, supply, installation, testing and commissioning of the following items for complete and satisfactory operation

-

-

-

... More
OPTION-01 AIR HANDLING UNITS - FLOOR MOUNTED DIDW BACKWARD CUVRED CENTRIFUGAL TYPE FAN WITH VFD

-

-

-

... More
Supply, installation, testing and commissioning of Double Skin Air Handling Unit - of Horizontal, pre-filte & Bag filter, 6 rows Chilled water coil (copper tube and aluminium fins construction), Fan section with DIDW backward curved centrifugal type fan, Fire damper, Low leak volume control damper,Mixing box, Flexible connections complete as per specifications as required.

-

-

-

... More
Frame of hollow anodised extruded aluminium hollow section material and bolted together with cast aluminium, fittings provided at joints and the entire unit is supported on painted steel channel frame. All the section shall be thermal break Casing panels shall be of insulated sandwich made of 1.0mm thick powder coated or plasticised sheet steel on outside and 0.6mm thick galvanised sheet steel inside with 50 mm thick mineral wool / Puf insulation (density - 38 to 40 Kg/Cum) media in between. One section of panel to another and panel to frame work are bolted together with leak proof soft neoprene rubber gasket to prevent any air leakage. Air tight access doors with adjustable tension locking device for inspection wherever required. Common channel base to mount fan and motor assembly with vibration isolator for smooth vibration free operation. The cooling coil header material shall be copper.

-

-

-

... More
The price quoted against the double skin air handler shall include for the following and its final painting to code.

-

-

-

... More
Low leaking volume control damper (Class 1) in 1.4 mm galvanised / aluminium aerofoil blade, 16mm dia plated steel stubs locked to the blades with mechanical fasteners, heavy duty moulded nylon bearings, neoprene rubber seals at tips, aluminium compression seals at jambs, brass rollers, double linkage on panels over 1000mm in width etc.

-

-

-

... More
Flexible connections at fan outlet constructed of the fire-resistant flexible double canvass sleeve as per the specification.

-

-

-

... More
The price quoted shall also include the following.

-

-

-

... More
a) All internal wiring, Marine light, Postive Interlocking system, power cabling copper earthing of air handling unit motors, from the local control panel and control wiring

-

-

-

... More
b) Bimetallic lugs shall be used at copper to aluminium joints.

-

-

-

... More
c)All the motors efficiency shall comply with IE3.

-

-

-

... More
d) Accessories and associated wiring between fire damper panel to fire damper and AHU motor to close fire dampers and shut-off AHU motor in the case of fire.

-

-

-

... More
Cooling Coil Inlet Temp : 7ºC / 44.6ºF

-

-

-

... More
Cooling Coil Outlet Temp : 12ºC / 53.6ºF

-

-

-

... More
Maximum fan outlet velocity : 610 m/min

-

-

-

... More
Maximum velocity of air across cooling coils and filter : 2.54m/s (Approx)

-

-

-

... More
Motor speed : 1450rpm / 4 Pole

-

-

-

... More
AHU Capacities

-

-

-

... More
Cooling Capacity : 17.0TR (Ground floor Reception and Lobby)

1

-

-

... More
Type : Horizontal Floor mounted AHU with DIDW backward curve centrifugal type fan (Top discharge)

-

-

-

... More
Dehumidified air quantity : 10500 CFM

-

-

-

... More
Fresh Air Qty. : 450 CFM

-

-

-

... More
External Static Pr. : 30 mm Wg

-

-

-

... More
Coil ADP : 55 deg F

-

-

-

... More
No of Rows : 6 Rows

-

-

-

... More
Filters : MERV 8 ((During commissioning & building flushing) & MERV 13

-

-

-

... More
GPM : 45.22 USGPM

-

-

-

... More
Indicative Motor rating : 7.5 KW (1Nos), IP-21

-

-

-

... More
Cooling Capacity : 32.0TR

9

-

-

... More
Type : Horizontal Floor mounted AHU with DIDW backward curve centrifugal type fan (Top discharge)

-

-

-

... More
Dehumidified air quantity : 18000 CFM

-

-

-

... More
Fresh Air Qty. : 1950 CFM

-

-

-

... More
External Static Pr. : 30 mm Wg

-

-

-

... More
Coil ADP : 55 deg F

-

-

-

... More
No of Rows : 6 Rows

-

-

-

... More
Filters : MERV 8 ((During commissioning & building flushing) & MERV 13

-

-

-

... More
GPM : 85.12 USGPM

-

-

-

... More
Indicative Motor rating : 11.0 KW (1Nos), IP-21

-

-

-

... More
OPTION-02 AIR HANDLING UNITS - FLOOR MOUNTED PLUG TYPE CENTRIFUGAL FAN WITH VFD

-

-

-

... More
Supply, installation, testing and commissioning of Double Skin Air Handling Unit - of Horizontal, pre-filte & Bag filter, 6 rows Chilled water coil (copper tube and aluminium fins construction), Fan section with Plug type centrifugal fan, Fire damper, Top / side discharge as per tender drawings, Low leak volume control damper,Mixing box, Flexible connections complete as per specifications as required.

-

-

-

... More
Frame of hollow anodised extruded aluminium hollow section material and bolted together with cast aluminium, fittings provided at joints and the entire unit is supported on painted steel channel frame. All the section shall be thermal break Casing panels shall be of insulated sandwich made of 1.0mm thick powder coated or plasticised sheet steel on outside and 0.6mm thick galvanised sheet steel inside with 50 mm thick mineral wool / Puf insulation (density - 38 to 42 Kg/Cum) media in between. One section of panel to another and panel to frame work are bolted together with leak proof soft neoprene rubber gasket to prevent any air leakage. Air tight access doors with adjustable tension locking device for inspection wherever required. Common channel base to mount fan and motor assembly with vibration isolator for smooth vibration free operation. The cooling coil header material shall be copper.

-

-

-

... More
The price quoted against the double skin air handler shall include for the following and its final painting to code.

-

-

-

... More
Low leaking volume control damper (Class 1) in 1.4 mm galvanised / aluminium aerofoil blade, 16mm dia plated steel stubs locked to the blades with mechanical fasteners, heavy duty moulded nylon bearings, neoprene rubber seals at tips, aluminium compression seals at jambs, brass rollers, double linkage on panels over 1000mm in width etc.

-

-

-

... More
Flexible connections at fan outlet constructed of the fire-resistant flexible double canvass sleeve as per the specification.

-

-

-

... More
The price quoted shall also include the following.

-

-

-

... More
a) All internal wiring, Marine light, Postive Interlocking system, power cabling copper earthing of air handling unit motors, from the local control panel and control wiring

-

-

-

... More
b) Bimetallic lugs shall be used at copper to aluminium joints.

-

-

-

... More
c)All the motors efficiency shall comply with IE3.

-

-

-

... More
d) Accessories and associated wiring between fire damper panel to fire damper and AHU motor to close fire dampers and shut-off AHU motor in the case of fire.

-

-

-

... More
e) The termination should be accomplished by provided a double canvass connection for a length of minimum 150 mm. A 150 mm plastic “ZIP” shall be provided in the canvass for providing access to measure the discharge temperature of the equipment.

-

-

-

... More
Cooling Coil Inlet Temp : 7ºC / 44.6ºF

-

-

-

... More
Cooling Coil Outlet Temp : 12ºC / 53.6ºF

-

-

-

... More
Maximum fan outlet velocity : 610 m/min

-

-

-

... More
Maximum velocity of air across cooling coils and filter : 2.54m/s (Approx)

-

-

-

... More
Motor speed : 1450rpm

-

-

-

... More
AHU Capacities

-

-

-

... More
Cooling Capacity : 17.0TR (Ground floor Reception and Lobby)

1

-

-

... More
Type : Horizontal Floor mounted AHU with Plug type centrifugal fan (Top discharge)

-

-

-

... More
Dehumidified air quantity : 10500 CFM

-

-

-

... More
Fresh Air Qty. : 450 CFM

-

-

-

... More
External Static Pr. : 30 mm Wg

-

-

-

... More
Coil ADP : 55 deg F

-

-

-

... More
No of Rows : 6 Rows

-

-

-

... More
Filters : MERV 8 ((During commissioning & building flushing) & MERV 13

-

-

-

... More
GPM : 45.22 USGPM

-

-

-

... More
Indicative Motor rating : 7.5 KW (1Nos), IP-21

-

-

-

... More
Cooling Capacity : 32.0TR

9

-

-

... More
Type : Horizontal Floor mounted AHU with Plug type centrifugal fan (Top discharge)

-

-

-

... More
Dehumidified air quantity : 18000 CFM

-

-

-

... More
Fresh Air Qty. : 1950 CFM

-

-

-

... More
External Static Pr. : 30 mm Wg

-

-

-

... More
Coil ADP : 55 deg F

-

-

-

... More
No of Rows : 6 Rows

-

-

-

... More
Filters : MERV 8 ((During commissioning & building flushing) & MERV 13

-

-

-

... More
GPM : 85.12 USGPM

-

-

-

... More
Indicative Motor rating : 11.0 KW (1Nos), IP-21

-

-

-

... More
OPTION-03 AIR HANDLING UNITS - FLOOR MOUNTED EC FAN

-

-

-

... More
Supply, installation, testing and commissioning of Double Skin Air Handling Units of Horizontal Configuration, 50mm thick panel with Mineralwool / PUF insulation, MERV8 and MERV 13 filter section, min 6 row deep water coil of copper tube & aluminium fins, copper header, AMCA certified centrifugal impeller with backward curve EC direct driven fan, motor, vibration isolator for fan and motor, factory assembled Aluminium volume control damper, internal power and control wiring, required length of power cable from the fan motor to terminal box which will be provided on the AHU /to the equipment, GI base frame complete as per specifications as required. Fan motor shall be IE-4 type and suitable for 415±10% volts, 50 cycles, 3 phase.Selcetd fan & motor,accessories shall be suitable for 110 % from citited below air flow. Noise level of the AHU shall be less than 65 dbA @ 1 mts distance

-

-

-

... More
AHU Chilled water In / Out temperature to be considered for AHU selection shall be 7.0°C / 12.0°C.

-

-

-

... More
The price quoted shall also include the following.

-

-

-

... More
a) All internal wiring, Marine light, Postive Interlocking system, power cabling copper earthing of air handling unit motors, from the local control panel and control wiring

-

-

-

... More
b) Bimetallic lugs shall be used at copper to aluminium joints.

-

-

-

... More
c)All the motors efficiency shall comply with IE4.

-

-

-

... More
d) Accessories and associated wiring between fire damper panel to fire damper and AHU motor to close fire dampers and shut-off AHU motor in the case of fire.

-

-

-

... More
e) The termination should be accomplished by provided a double canvass connection for a length of minimum 150 mm. A 150 mm plastic “ZIP” shall be provided in the canvass for providing access to measure the discharge temperature of the equipment.

-

-

-

... More
AHU Capacities

-

-

-

... More
Cooling Capacity : 17.0TR (Ground floor Reception and Lobby)

1

-

-

... More
Type : Horizontal Floor mounted AHU with EC fan

-

-

-

... More
Dehumidified air quantity : 10500 CFM

-

-

-

... More
Fresh Air Qty. : 450 CFM

-

-

-

... More
External Static Pr. : 30 mm Wg

-

-

-

... More
Coil ADP : 55 deg F

-

-

-

... More
No of Rows : 6 Rows

-

-

-

... More
Filters : MERV 8 ((During commissioning & building flushing) & MERV 13

-

-

-

... More
GPM : 45.22 USGPM

-

-

-

... More
Indicative Motor rating : 7.5 KW (1Nos), IP-21

-

-

-

... More
Cooling Capacity : 32.0TR

9

-

-

... More
Type : Horizontal Floor mounted AHU with EC fan

-

-

-

... More
Dehumidified air quantity : 18000 CFM

-

-

-

... More
Fresh Air Qty. : 1950 CFM

-

-

-

... More
External Static Pr. : 30 mm Wg

-

-

-

... More
Coil ADP : 55 deg F

-

-

-

... More
No of Rows : 6 Rows

-

-

-

... More
Filters : MERV 8 ((During commissioning & building flushing) & MERV 13

-

-

-

... More
GPM : 85.12 USGPM

-

-

-

... More
Indicative Motor rating : 11.0 KW (1Nos), IP-21

-

-

-

... More
IMPROTANT NOTE TO THE BIDDERS: All the three model available is separately mentioned for getting quote. During exection of work, anyone of the type (AHU / FAN) / make will be choosen by Client based on availability (delivery time, size feasibility).

-

-

-

... More
Supply & Installation of Stater Panel with VFD housed on the external surface of the AHU as detailed in the technical specification. Cost of Panel with Starter with VFD should be considered by AHU Manafacturer and it should be noted that Starter panel should be housed on the external surface of AHU. The Communication card to transfer the entire data available on VFD to the BMS System. The rate shall be inclusive of Power and control cabling between the VFD panel to motor, potential free contact with necessary cables. The THD shall below 8%.

-

-

-

... More
7.5 KW

1

-

-

... More
11.0 KW

9

-

-

... More
CEILING SUSPENDED UNITS

-

-

-

... More
Chilled water type horizontal Ceiling suspended Units (CSU), Blow through type with 3R/4R cooling coil, Cleanable fabric filter, main condensate extended insulated SS drain pan, motor suitable for 220+/-6V, 50Hz, forward curved double width centrifugal fan, completed with factory fitted PICBV valve, ball valve with strainer, ball valve without strainer, balancing valve, drain pipe provision and necessary supports. All AHU coil fins shall be protected by hard wood sheet till the time of commissioning.

-

-

-

... More
3.0 TR-1200CFM

9

-

-

... More
4.0 TR-1600CFM

1

-

-

... More
HEAT RECOVERY UNIT WITH VFD

-

-

-

... More
Supply,installation, testing and commissioning of Centralised Treated Fresh air unit consists of exhaust air block and fresh air block. Each block is made up of double skin construction designed on modular concept basis and has provision for forward curve fan , motor, damper and filter. Panels shall be 50 mm thick, inner and outer skin thickness shall be same as AHUs and filled with 50mm slabs of mineral wool /PUF insulation (density - 38 to 40 Kg/Cum) media in between (Each block module shall be fitted with other block, housing heat recovery devices, washable metallic viscous filters (50mm thick) and inlet and outlet dampers (extruded aluminium low leakage construction) with bird screen for supply and return air. Air flow parameters: Heat Recovery wheel to recover energy complete with hygroscopic aluminium media rotor seal GI structural frame work to house rotor, drive system, rotor drive motor, belt, pre and Bag filter complete with starter panel. The price quoted for Treated fresh air unit (Heat recovery unit) shall include the following a) All internal wiring, power cabling copper earthing of treated fresh air unit motors, from the panel and control wiring b) Bimetallic lugs shall be used at copper to aluminium joints and as per specification

-

-

-

... More
The vendor shall be select the suitable units with minimum leakage. The fresh air quantity required after leakage is as follows.

-

-

-

... More
FILTER SECTION FOR HEAT RECOVERY UNIT

-

-

-

... More
Filters : MERV 8 ((During commissioning & building flushing) & MERV 13

-

-

-

... More
Supply air fan - 10800 CFM (Located at Terrace Floor - Left wing AHU)

-

-

-

... More
Exhuast air fan - 10800 CFM

-

-

-

... More
External static pressure - SA fan - 30 mmWg; RA fan - 30 mmWg.

-

-

-

... More
Indicative motor rating - Supply air fan - 7.5KW & Exhaust air fan - 7.5KW & 1.1KW for Wheel

1

-

-

... More
Supply air fan - 9250 CFM (Located at Terrace Floor - Right wing AHU)

-

-

-

... More
Exhuast air fan - 9250 CFM

-

-

-

... More
External static pressure - SA fan - 30 mmWg; RA fan - 30 mmWg.

-

-

-

... More
Indicative motor rating - Supply air fan - 5.5KW & Exhaust air fan - 5.5KW & 1.1KW for Wheel

1

-

-

... More
Supply air fan - 1200 CFM (Located at Terrace Floor - Middle wing FCU)

-

-

-

... More
Exhuast air fan - 1200 CFM

-

-

-

... More
External static pressure - SA fan - 25 mmWg; RA fan - 25 mmWg.

-

-

-

... More
Indicative motor rating - Supply air fan - 1.5KW & Exhaust air fan - 1.5KW & 0.55KW for Wheel

1

-

-

... More
Supply & Installation of Stater Panel with VFD housed on the external surface of the HRW unit as detailed in the technical specification. Cost of Panel with Starter with VFD should be considered by HRW Manafacturer and it should be noted that Starter panel should be housed on the external surface of HRW. The Communication card to transfer the entire data available on VFD to the BMS System. The rate shall be inclusive of Power and control cabling between the VFD panel to motor and potential free contact with necessary cables. The THD shall below 8%.

-

-

-

... More
7.5 KW

2

-

-

... More
5.5 KW

2

-

-

... More
1.5 KW

2

-

-

... More
CHILLED WATER PIPES & VALVES (PRE INSULATED)

-

-

-

... More
Supply of Pre-insulated heavy Class MS Pipes - Chilled water pipe insulation  with 40mm thick upto 100 mm dia & 50 mm thick from 125 mm dia to 300 mm dia and 75 mm thick from 350mm dia with 40+/-2Kg/Cu.Mtr density PUF insulation covered with 24G G.I spiral Cladding." The joint shall be insulated with injuction method by recommended machine

-

-

-

... More
Supply, erection, testing and commissioning of pre insulated chilled water pipes with 0.5 mm thick G.I. Spiral casing with 30 mm thick / 50 mm thick /75 mm thick Rigid Polyurethane foam as insulation having density of 38 Kg./M3. Pipes will be of MS heavy class' upto 150mm dia as per IS 1239, 6.35 mm thick for 200mm and 250mm dia pipes and 8mm thick for 300mm dia and above as per IS 3589 for Comfort Cooling pipes and 12mm thick for 300mm dia and above for Data center cooling pipes. Necessary RCC pedestals of size 600x300x150mm high shall be provided at every 2200mm interval to run the chilled fluid piping above the floor level by ACMV contractor. Insulation shall be as per the technical spsecification.

-

-

-

... More
All other pipe supports will have to be on regular pipe hangers with spring and acceptable isolation in each support. The quoted piping rate shall include for incorporating service flanges on all valves, strainers, service screen / basket strainer on the water line entry to all equipments like chilled water coils and chillers service flanges, descalling Teees, airvent valves, drain valves etc. required to ake the circuits fully operational, The temporary service strainers shall be removed and discarded after the first few hous of trial runs.

-

-

-

... More
The unit rate piping shall also include the chemical cleaning and passivation as detailed in the specification. The insulation valves shall be considered as one meter of the size MS angle/Chennal also to be insulated.

-

-

-

... More
Chilled Water piping with black steel pipes, bends, Tees and fittings, factory made supports as follows

-

-

-

... More
500 NB - 8mm thick (75mm thick insulation)

1820

-

-

... More
450 NB - 8mm thick (75mm thick insulation)

20

-

-

... More
400 NB - 8mm thick (75mm thick insulation)

40

-

-

... More
350 NB - 8mm thick (75mm thick insulation)

20

-

-

... More
300 NB - 8mm thick (50mm thick insulation)

655

-

-

... More
250 NB - 6.35mm thick (50mm thick insulation)

90

-

-

... More
200 NB - 6.35mm thick (50mm thick insulation)

335

-

-

... More
150 NB - MS Heavy Class (50mm thick insulation)

420

-

-

... More
125 NB - MS Heavy Class (50mm thick insulation)

10

-

-

... More
100 NB - MS Heavy Class (40mm thick insulation)

35

-

-

... More
80 NB - MS Heavy Class (40mm thick insulation)

300

-

-

... More
65 NB - MS Heavy Class (40mm thick insulation)

35

-

-

... More
50 NB - MS Heavy Class (40mm thick insulation)

75

-

-

... More
40 NB - MS Heavy Class (40mm thick insulation)

40

-

-

... More
32 NB - MS Heavy Class (40mm thick insulation)

85

-

-

... More
25 NB - MS Heavy Class (40mm thick insulation)

10

-

-

... More
CHILLED WATER PIPES (SITE INSULATED)

-

-

-

... More
Chilled water Mild steel pipes with all necessary fittings like bends, elbows, tees, reducers, hanger, supports,etc and shall be Class C as per IS 1239 upto 150mm dia and as per IS 3589 for 200mm dia & above. The insulation material shall be PUF with minimum density 38 kg/cu.m and covered with 24 G GI Spiral cladding.

-

-

-

... More
500 NB - 8 mm thick (75mm thick insulation)

150

-

-

... More
300 NB - 8mm thick (50mm thick insulation)

75

-

-

... More
Providing and fixing in position the following UPVC pipes cut to required lengths with the necessary elbows, tees, U traps and reducers . The rate shall be inclusive of Drain pipe with PUF insualtion and 24G GI spiral cladding as specified.

-

-

-

... More
100 NB

100

-

-

... More
80 NB

150

-

-

50

-

-

10

-

-

10

-

-

225

-

-

95

-

-

... More
Providing and fixing in position the following Butterfly valves (PN10) complete with end flanges/matching flanges, additional supports, fixing accessories etc. as per specification. Rate shall be inclusive of Pre insulation with 24G GI cladding as specified.

-

-

-

... More
500NB - Gear driven

60

-

-

... More
300 NB - Gear driven

21

-

-

... More
250 NB - Gear driven

20

-

-

... More
200 NB - Gear driven

21

-

-

... More
150 NB - Lever operated

53

-

-

... More
100 NB - Lever operated

8

-

-

... More
80 NB - Lever operated

26

-

-

... More
65 NB - Lever operated

1

-

-

... More
50 NB - Lever operated

10

-

-

... More
Providing and fixing in position the following Ball valves complete with threaded joints, additional supports, fixing accessories etc. as per specification. Rate shall be inclusive of Pre insulation with 24G GI cladding as specified.

-

-

-

... More
40 NB - Lever operated

5

-

-

... More
32 NB - Lever operated

58

-

-

... More
25 NB - Lever operated

17

-

-

... More
Providing and fixing in position the following Ball valves with Strainers complete with threaded joints, additional supports, fixing accessories etc. as per specification. Rate shall be inclusive of Pre insulation with 24G GI cladding as specified.

-

-

-

... More
32 NB - Lever operated

11

-

-

... More
Supply, installation, testing and commissioning of electronic, Self-balancing, pressure independent type dynamic balancing valve with integrated 2-way modulating control valves in a single body. The actuator shall be capable of accepting 2-10VCD, 4-20mA electric signal and shall provide similar transduced feedback output signal to control system. The minimum close of pressure of actuator must be 1.5 times shut off head of pump as per specification of following sizes. Rate shall be inclusive of Pre insulation with 24G GI cladding as specified and 6A scoket, switch and cabling for valve actuator.

-

-

-

9

-

-

1

-

-

10

-

-

... More
Supply, installation, testing and commissioning of 2-way Motorised valves (ON/OFF) with Fast moving actuator working on 230 V of. If required necessary transformer to be included in the scope. Rate shall be inclusive of Pre insulation with 24G GI cladding as specified and 6A scoket, switch and cabling for valve actuator.

-

-

-

... More
500 NB

14

-

-

... More
200 NB

4

-

-

... More
150 NB

12

-

-

... More
Supply, installation, testing and commissioning of 2-way Motorised modulating valve with actuator working on 230 V of. If required necessary transformer to be included in the scope.Rate shall be inclusive of Pre insulation with 24G GI cladding as specified

-

-

-

... More
200 NB

1

-

-

... More
150 NB

2

-

-

... More
Supply and erection of Balancing valves, CI body, non-rising spindle of stainless steel SS410 stem, stainless steel disc of AISI SS410 with EPDM sealing on seat, double seal by EPDM back flow and graphic asbestos packing on spindle C1220 cast iron/aluminium/MS fabricated hand wheel with pressure test cocks for measurements and regulation of flow through pressure drop across the valves as specified, flanges boards, drain valves etc. suitable for computerized balancing instrumentation probes.Rate shall be inclusive of Pre insulation with 24G GI cladding as specified

-

-

-

... More
500 NB

2

-

-

... More
450 NB

1

-

-

... More
300 NB

2

-

-

... More
200 NB

5

-

-

... More
150 NB

8

-

-

1

-

-

... More
Supply and erection of MS fabricated ‘Y’ type strainer with removable brass /stainless steel (SS-316) screen (24G) with 3mm perforation and permanent magnet, drain piping (SS-410) complete with matching flanges and Pre insulated PUF with 24G GI cladding as specified

-

-

-

... More
200 NB

4

-

-

... More
150 NB

4

-

-

9

-

-

1

-

-

... More
Supply,Installation and commissioning of suction guide in-line stainless steel strainer has a free area of 250% of pipe sectional area. The suction guide same dia of pump suction but also connect to inlet piping one dia larger than the pump suction., including flow stabilising vanes on the outlet allow the suction guide to bolt diectly to the pump. The suction guide can be prepareably bought from the same pump manufacturers complete with turns the piping 90º replcing the elbow, in line strainer matching flanges. Rate shall be inclusive of Pre insulation with 24G GI cladding as specified

-

-

-

... More
250 NB

5

-

-

... More
200 NB

4

-

-

... More
150 NB

4

-

-

... More
Supply and erection of Dual plate type Check valves with cast iron body Gr 220 ASTM A217 Gr-CA15, plate SS316 springs, SS410 hinges/Stop pin and AISI SS316 bearings, matching flanges / Buna or rubber seal to ANSI 125 seal, thermal insulation etc. Rate shall be inclusive of Pre insulation with 24G GI cladding as specified.

-

-

-

... More
250 NB

5

-

-

... More
200 NB

4

-

-

... More
150 NB

4

-

-

... More
Supply, installation and commissioning of air seperator with thermal insulation as per specification, necessary steel suppots inlet for soft water, outlet and drain outlet.

-

-

-

... More
Dia - 500mm

2

-

-

... More
Dia - 300mm

1

-

-

... More
Supply and erection of Closed Water Expansion Tank of  steel construction with interchangeable EPDM Butyl rubber membrane bladder complete with 50mm thick expanded polystyrene insulation, set in a frame work of metal and finished with 20G aluminium sheet duly powder coated to match external elevation.  Tank to be minimum 1000 Ltrs capacity and tank shall be mounted on FRP coated steel stands.

-

-

-

... More
The tank shall have 50mm system connection and 40mm drain and over flow and 40mm quick fill and makeup connection, provision for pressure gauge and switches etc.  Tank shall be insulated as per specifications and provided with pressure switches. The expansion tank shall be supplied and installed with all accessories required for proper functioning of the system.

-

-

-

... More
Tank shall be complete with Pumps required in the configuration of N + 1 (1 working + 1 Stand By).  The cost shall include necessary valve package & control logic panel

-

-

-

... More
1000 Ltrs.

3

-

-

... More
Supply, erection and commissioning of dial type Water Pressure gauges with stainless steel syphon tube with cock (0-10bar) and complete with fittings and tubing extension wherever required

-

-

-

... More
150mm dia (Chiller and Pump side)

56

-

-

... More
100mm dia (AHU side)

42

-

-

... More
Supply, erection and commissioning of Bimetallic dial type with thermowell Thermometers (-20 to 40 deg C) and copper separable well complete with guard etc. Mounted on water lines, thermowells, drain valves, vent cocks etc., in the inlet and outlet of cooling coil connections.

-

-

-

... More
150mm dia (Chiller side)

26

-

-

... More
100mm dia (AHU side)

42

-

-

... More
Supply,erection and commissioning of Automatic Air Vents with ball valve shall be installed at all high sections of piping. The discharge from this air vents shall be piped via tubes of appropriate size to the nearest waste drain pipe.

67

-

-

... More
Supply, installation and commissioning of Gate valve for AHU drain of the follwing sizes

-

-

-

20

-

-

... More
Supply, installation, testing & commissioning of Flexible connections of suitable pressure rating to be installed at CHILLERS & Pumpsets inlets & outlets of all chilled water coil along with necessary flanges- also of similar material to minimize transmission of vibration to connected piping and at pipes crossing building expansion joints as per Specifications.

-

-

-

... More
250 NB

10

-

-

... More
200 NB

16

-

-

... More
150 NB

16

-

-

... More
Supply, installtion, testing and commissioning of BTUH METER: Microprocessor based BTUH monitoring system shall be provided to measure the BTUH

-

-

-

... More
BTUH flow sensing giving outputs corresponding to the flow (4-20A/pulse)and the direction of flow (potential free contact).The sensor shall be suitable for the line size as indicated below on which it is to be mounted and complete with installation hardware including tool for installing / removing without requiring shutdown or draining of pipeline.The BTU meter shall operate on Battery, in case of power supply disruption to the BTU Meter and it has one year data storage capacity.

-

-

-

... More
Matched pair of temparature sensors and thermowell

-

-

-

... More
microprocessor based meter to compute the btu value;provided with integral LCD display and keypad .IP65/ Nema 4 or better protection classs ,hardware and software for establishing communication link to the BMS shall include the flow temperatures ,direction of flow and diagnostic information.

-

-

-

... More
Btu Transmitters as per the specification for energy auditing shall consist of following items of following sizes:BTU meter

-

-

-

... More
Inline flow meter

-

-

-

... More
Matching pair sensors / Matching flanges

-

-

-

... More
heat integrator

-

-

-

... More
Minimum 4 Data / Meter to Master Contoroller - T1 / T2 / Flow / KWH - with 2 mtr 2C shielded communication cable

-

-

-

... More
7.98 GPM

10

-

-

... More
10.64 GPM

1

-

-

... More
39.90 GPM

1

-

-

... More
45.22 GPM

1

-

-

... More
82.46 GPM

1

-

-

... More
85.12 GPM

10

-

-

... More
93.10GPM

1

-

-

... More
375.06 GPM

1

-

-

... More
391.02 GPM

1

-

-

... More
404.32 GPM

1

-

-

... More
406.98 GPM

1

-

-

... More
667.66 GPM

1

-

-

... More
935 GPM for Chiller

4

-

-

... More
665 GPM for Chiller

8

-

-

... More
1330 GPM for Data center Branch pipes

2

-

-

... More
1995 GPM for Data center Branch pipes

4

-

-

... More
2805 GPM for Comfort cooling common Header

1

-

-

... More
5320 GPM for Data center cooling common Header

1

-

-

... More
Supply, erection and commissioning of Chilled water buffer tank of  Carbon steel construction with Grit blasted to SA 2.5 and then coated with two coats of red oxide primer complete with 50mm thick Nitrile rubber insulation, set in a frame work of metal and finished with 20G aluminium sheet duly powder coated to match external elevation. The buffer tank insulation can be done at site to avoid the damage of insulation and cladding while moving and positioning of the Vessel.

-

-

-

... More
The tank shall have 300mm inlet and outlet connection, 25mm safety calve and 40mm drain and provision for pressure gauge and switches etc.Tank shall be insulated as per specifications and provided with pressure switches. The Chilled water buffer tank shall be supplied and installed with all accessories required for proper functioning of the system. The tank shall be fitted with a intenal baffle with spray nozzle at the inlet. The shell and dish thickness shall be 12mm.

-

-

-

... More
The tank configuration shall be Vertical / Horizontal and the Working pressure shall be 10 bar. The rate shall be inclusive of necessary supports and all other accessories.

-

-

-

... More
15000 Ltrs.

3

-

-

... More
Designing, supplying installing commissioning & testing of Pressure reducing valve for inlet / oulet with flow controlling, pressure controlling & monitoring on web and to the pipeline feeding to ESR/ MBR / GSR with cable, PLC etc. complete. Pressure reducing valve CLASS 150, FLANGE INLET PRESSURE, 300 PSI, ADJ. 30-300 PSI, GLOBE TYPE, 300mm DIA.

2

-

-

... More
DX HI WALL SPLIT UNITS FOR UPS AND BATTERY ROOM

-

-

-

... More
Supply and Installation of Inverter type Hi-Wall Split air conditioning units of specified capacities with R410A/R407C/Equivalent refrigerant gas filling.The indoor units shall be wall fixing type. The Indoor unit shall comprise of Blower, Cooling coil, Filter and Expansion device. The Outdoor unit shall comprise of scroll / rotary Compressor, Air cooled condenser & Condenser fans. The outdoor unit shall be installed at terrace / Ground Floor level as per site conditions.Scope shall include all supports for the indoor and outdoor units. Rate shall be inclusive of suitable voltage stabilizer,drainkit pump, cabling 20 Amps contactor with NO+NC (for remote operation through BMS), control and power cable.Energy efficient ratio (EER) shall comply with IGBC guidelines.

-

-

-

... More
Cooling Capacity: 2.01 TR Air flow: 614 cfm (UPS room & Battery room)

6

-

-

... More
Providing and fixing microprocessor based control panel cum sequence operation controller for ductable split unit in UPS room, including wiring with PVC panel etc. The controller shall perform mainly the following function.

-

-

-

... More
To run only required a set of units.

-

-

-

... More
To give alarm when running units fail or show an error.

-

-

-

... More
To set a timer for operation of each unit.

-

-

-

... More
To start standby when temperature rises above set point.

-

-

-

... More
To start a standby unit incase of breakdown fault or on temperature rise of space.

2

-

-

... More
Supply,erection and testing of Refrigerant Copper pipes of the following diameters to integrate outdoor / indoor units. The liquid line and suction line shall be insulated with closed cell nitrile rubber insulation as specified below.

-

-

-

... More
6.4mm dia liquid pipe with 13mm thick insulation

5

-

-

... More
9.5mm dia liquid pipe with 13mm thick insulation

120

-

-

... More
12.7mm dia with 13mm thick insulation

5

-

-

... More
15.9mm dia liquid pipe with 19mm thick insulation

120

-

-

... More
Supply and laying of 4C x 2.5 Sqmm PVC Copper Cable - Control cabling between indoor and outdoor units. The rate shall be including suitable size GI conduit with conduit accessories and necessary fixing arrangement.

140

-

-

... More
Supply and laying of 6C x 2.5 Sqmm PVC Copper Cable - Control cabling between indoor and outdoor units. The rate shall be including suitable size GI conduit with conduit accessories and necessary fixing arrangement.

20

-

-

... More
Supply and fixing in position of Heavy duty UPVC pipe cut to required length with insulation as per specification, installed with all joints, reducer, necessary elbows and tees.

-

-

-

60

-

-

5

-

-

30

-

-

... More
AIR DISTRIBUTI0N SYSTEM

-

-

-

... More
Supply and erection of factory fabricated GI duct as per specification with TDF / TDC flanges. Rate shall be inclusive of tie rod supports GI angles frames for hangers, fasteners and all accessories complete as per specifications.

-

-

-

... More
Above 2200 (1.2mm) 1500 - 2200 (1.0mm) 750 - 1500 (0.8mm) 0-750 (0.6mm)

-

-

-

... More
18G thick GSS ducting – factory fabricated

175

-

-

... More
20G thick GSS ducting – factory fabricated

50

-

-

... More
22G thick GSS ducting – factory fabricated

1795

-

-

... More
24G thick GSS ducting – factory fabricated

2283

-

-

... More
Supply and erection of factory fabricated MS duct as per specification with MS flanges 40 x 40 x 3mm - Flanged and Fully welded (Both linear and cross sectional Joint shall be welded). The outside / Riser of the duct shall be coated with Venus Fire coat (fire retardant metal coating) conform to BS 476 120 Minutes fire resistence, Fire coat shall be applied to inner and outer sides of the ducts, the procedures shall be followed as per the manufacturer's recommendations. The quoted price shall be inclusive of necessary hot dip galvanized brackets, tie rod Supports, hangers, flanges, stiffener, anchors, fire resistence neoprene rubber gaskets, fire resitence sealants and all accessories complete as per specifications.

-

-

-

... More
1.6mm thick MS ducting (16G) – factory fabricated

535

-

-

... More
Supply,fabricating and erecting structure steel of make TATA/SAIL shall be confirm to IS:2062 along with test certificate as per specification including transporting, straightening, cleaning, fabricating and erecting various structures in position for ducting support, applying two coats of zinc chromate primer of ICI, Asain make or equivalent, with rubber gasket between support & duct as per specifications and drawings and as directed by the Engineer-in-Charge client /consultant.

15000

-

-

... More
Supply and installation of Thermal insulation on ducts with Class 'O' FM approved Closed Cell XLPE 9mm thick insulation with density of 25 - 30 kg/cum with 26 G Aluminium foil and OEM recommmended site adhesive as per the thickness mentioned below, with fire retardant adhesive and joints sealed with 3mm thick, 50mm wide adhesive tape in accordance with the approved shop drawings and technical specifications. Quoted price shall be inclusive of adhesive, tapes, etc.Low VOC adhesive/ sealant /paint should be used as per IGBC / LEED recommendations

-

-

-

... More
9mm thick

615

-

-

... More
Duct acoustic insulation with 25mm thick fibre glass rigid board of 48Kg/Cu.M density. Insulation shall be covered with 2l ayerof R.P.Tissue and 26 G Al perforated sheet as per specifications.

-

-

-

... More
15mm thick

25

-

-

... More
Supply and installation of Thermal insulation for HRW Fresh air and Exhaust air ducts with Class 'O' FM approved Closed Cell XLPE insulation with density of 25 - 30 kg/cum with 26 G Aluminium foil and OEM recommmended site adhesive as per the thickness mentioned below, with fire retardant adhesive and joints sealed with 3mm thick, 50mm wide adhesive tape in accordance with the approved shop drawings and technical specifications. Quoted price shall be inclusive of adhesive, tapes, etc.Low VOC adhesive/ sealant /paint should be used as per IGBC / LEED recommendations

-

-

-

... More
9mm thick for Internal duct

659

-

-

... More
Supply and installation of AHU room Acoustic insulation, Material shall be Glasswool acoustic board. The material should be fibre free. The density of the same shall be within 70-80 Kg/m3 and 25mm thick with one side Black Glass cloth (Visible) and other side Aluminium Foil (towards wall).

1845

-

-

... More
Supply and installation of Powder coated extruded aluminium continuous double louvered grilles with 45 degree deflection with volume control damper for (Supply/Fresh) air Grille as per specifications as per drawing.

28

-

-

... More
Supply and installation of Powder coated extruded aluminium double louvered grilles with volume control damper for Return/exhaust air as per specifications

34

-

-

... More
Supply and installation of GI volume control damper, (low leakage) made out of 1.4mm thick galvanised sheet steel frame and opposed blades of 1.4mm galvanised steel with suitable links, handles, levers and quadrants for manual control of volume of air flow and for proper balancing of air distribution system.

-

-

-

... More
Rectangular type VCD

43

-

-

... More
Supply, installation and commissioning of combined motorized spring return type Smoke and Fire damper (actuator quantity shall be as per item no.17 below) complete with factory made 1.6mm thick GSS sleeves suitable for 90 minutes fire rating located in supply air ducts.In case of fire failure the damper shall assume " closed posittion" (suitable for BAS) The motorised actuator to operate the above fire damper on receipt of signal from DDC system /fire detection system.

43

-

-

... More
Supply,Installation,Testing and commissioning of following:  Motorized spring return type Actuator,temperature sensor and provision for receipt of external fire signal, wiring as specifications.

84

-

-

... More
Supply and installation of Control panel for the above fire damper (to be located near Fire damper in respective AHU/fan rooms  Power supply to the fire damper panels shall be provided from AHU/fan electrical panel. These shall be interlocked/integrated with zonal damper status indicating panels.Rate to be included with 6A socket, switch and cabling for fire damper actuator as specified.

84

-

-

... More
Supply and installation of Non Return damper (low leakage) made out of 1.4mm thick galvanised sheet .

5.5

-

-

... More
Supply and installation of Powder coated extruded aluminium air transfer door grilles comprising of front section with inverted ‘V’ horizontal blades, borders, countersunk for screw fixing, and matching rear side frame flanges of the sizes as per drawings.

6.5

-

-

... More
Supply and installation of Aluminium powder coated fresh air intake / outlet grille complete with volume control damper, vermin netting and and 45 deg angle suitable for protection against splashing rain water fixed in a powder coated Aluminium angle mount frames.

155

-

-

... More
Supply and fixing of Smoke exhaust and Return air powder coated jali of mesh size 10 mm x 10 mm at all return air passages as per requirement etc.

22.5

-

-

... More
Supply and erection of factory fabricated Acoustic box (Rectangular splitter attenuators) made out of 20G GI sheet and angle iron flanges with acoustically lined GI baffles using 25mm thick fibre glass, finished with RP tissue. The GI baffles shall be fixed at every 100mm intervals. The fibre glass shall be covered with 26G perforated aluminium sheet. The area of perforation shall be atleast 20% . The sizes of the acoustic box will be as follows:

-

-

-

... More
1150 x 450

1

-

-

... More
1450 x 500

1

-

-

... More
VARIABLE AIR VOLUME BOXES (VAV)

-

-

-

... More
Supply of Imported Variable Air Volume (VAV) Units are fabricated out of heavy gauge steel, mechanically sealed with gasketed & leak resistance construction. Both supply & discharge shall be suitable for duct connections. The VAV box shall be AHRI certified.

-

-

-

... More
Boxes shall be of variable air volume at the inlet, variable at outlet and shall be fitted with air volume regulator of the fully proportional type.

-

-

-

... More
The boxes shall be supplied with all internal attenuation treatment as per specification and acoustical damped casing necessary to achieve the required noise criteria. Casing shall be 22G minimum fitted with a completely sealed, easily removable means of access to all internal parts. Access to all boxes must be from the underside only.

-

-

-

... More
Maximum allowable static pressure to the boxes for its satisfactory operation shall not exceed 0.20” WG

-

-

-

... More
Boxes shall be able to reset any air flow between zero and the maximum air quantity that the boxes can handle without changing orifices or other parts. Air quantity limiters will not be accepted.

-

-

-

... More
A suitable device shall be provided for the field adjustment of minimum air flow. All boxes shall be intially factory set at minimum air quantity of 50% of the design requirements. Under shut-off conditions, all boxes shall not have air leakage more than 20% of the maximum air quantity.

-

-

-

... More
VAV Unit shall be ceiling suspended with hanger brackets & vibration isolators.

-

-

-

... More
All accessories listed under specifications should be considered for pricing VAVs.

-

-

-

... More
Direct Output temperature sensor comprising of high quality thermistor or platinum sensing element should be supplied with VAVs.

-

-

-

... More
The zone temperature sensor shall be with externally adjustable set points and with communications jack. The look of the sensor should be rectangular in shape.

-

-

-

... More
Necessary Hardware/ software for integrating the VAV Boxes to the third party system which shall be capable of transferring 4 points as specified in the technical specification for the quantity indicated below shall also be considered in the scope.

-

-

-

... More
Controller shall be 16 Bit controller. It shall be capable for handling the Co2 sensor input also when required. Acoustic insulation shall be considered both the inlet and outlet of the VAV upto 1.0m.

-

-

-

... More
Plug top, 6A socket and cables upto the nearest raw power plug point.The VAV scope inclusive of control cable from VAVs to termostate with sensors. All VAV provided with minimum 20% opening

-

-

-

... More
175 cfm

4

-

-

... More
350 cfm

2

-

-

... More
450 cfm

1

-

-

... More
650 cfm

1

-

-

... More
1950 cfm

9

-

-

... More
Communication cable/bus cable with armoured to intergate all VAVs etc

255

-

-

... More
VENTILATION SYSTEM ( All fans shall be AMCA certified)

-

-

-

... More
Supply, Installation, Testing & Commissioning of direct driven Smokespill Vane Axial Fan with impeller having adjustable pitch angle blades. Fan motor shall be suitable for 415 ± 10% volts, 50 cycles, 3 phase power supply of class 'H' insulation suitable for 250 deg C for 2 hrs as per EN 12101-3 standard. The fan shall be equipped with mounting bracket & spring isolators for the installation of the fans, inlet and outlet wire mesh guards with fire rated gravity louver. The price shall include all accessories & all necessary vibration isolation system, Silencer at inlet fire rated flexible canvass connections, mounting frames, hangers, supports, nut & bolts etc. All 3 phase motors shall be BMS compatible with PFC to monitor through BMS. All 3 phase motors shall be IE3.The capacities shall be as follows:

-

-

-

... More
Exhaust / Smoke spill application in case of fire in Basement and Office building.

-

-

-

... More
Air flow rate : 40500 CFM

4

-

-

... More
ESP : 150 Pa

-

-

-

... More
Fan type: Vane axial smoke spill

-

-

-

... More
Fan motor : 11.0 KW 4 pole 3 phase IP 55 Class H insulation

-

-

-

... More
Fan RPM : 1450

-

-

-

... More
Air flow rate : 18000 CFM Smoke Exhaust fan for Office building.

4

-

-

... More
ESP: 400Pa

-

-

-

... More
Fan type: Vane axial smoke spill

-

-

-

... More
Fan motor : 11.0 KW 4 pole 3 phase IP 55 Class H insulation

-

-

-

... More
Fan RPM : 1450

-

-

-

... More
Supply, installation,testing and commissioning of Ductless Impulse Jet Fans 400 mm dia suitable for normal ventilation and smoke extraction in case of fire as per specifications. Complete fan assembly with its casing, impeller & motor shall be sourced from single manufacturer and certified as tested for smoke extraction application at minimum 250 deg C for 2 hours. The casing shall be GSS construction. The motor shall be Dual Speed, suitable for 3 phase, 50 Hz, 415V. The fans shall be complete with silencers at supply & exhasut air and protection net as described in specifications.(considered low height jet fans for basement).The quoted rate shall also inclusive for preparing and submission of CFD analysis in soft and hard copy for the ventilation system for basement, Wiring between fans. The analysis report shall provide details of air movement and coverage in both normal & fire mode in 3D modeling, simulation, inlet air openings, ehaust openings, exhaust louver, CO sensor, time taken for smoke evacuation, velocity, Co level in ppm or mg/m3 etc..

27

-

-

... More
Supply,installation,testing and commissioning of CO detection sensor with digital display and protection cage at parking area as per specification.

10

-

-

... More
Supply,installation and testing and commisioning of Electrical panel with PLC based control panel with starters for all ventilation fans & jet fans suitable for motor rating of the selected fans with the controller compatible for BMS Connectivity (RS 485).Two feeders from each like jet fan/co sensor & exhaust fan for each basement shall be provided additional to the below provision.The panel shall have suitable switch gear like MCCB as incomer of suitable rating. The PLC shall be programmed for operation of the fans in normal as well as fire mode incorporating feedback and control based on the output of the CO sensor. The panel should also include a potential free contacts.All accessories necessary for fixing the panel shall be included in the cost of the panel.

-

-

-

... More
Basement with provision of minimum 27 nos jet fans but number of fans are not limited as per CFD analysis requirement , 10 co sensors and 4 exhaust air fans

1

-

-

... More
Supply and installation of 8C X 1.5 sqmm Fire resistance control cables from jet fans to the PLC panel

2500

-

-

... More
Supply and installation of 4C X 2.5 sqmm Power cables from PLC panel to jet fans.

2500

-

-

... More
Supply and installation of 4C X 6 sqmm Fire Resistance shielded control cables Co Sensor to the PLC Panel

1250

-

-

... More
Supply and installation of 4C X10 sqmm Copper cable with gland and termination etc for Axial fan to PLC panel

125

-

-

... More
Supply & laying of 25 mm GI conduits,clamp,screw and required accessories from PLC panel to jet fan & CO Sensor as per specification.

4500

-

-

... More
Supply & laying of earthing for the following equipments

-

-

-

... More
8 gauge copper wire for jet fans to GI earth flat with required connecting mecanism like hole, bolt& nut etc as per Electrical installation standards

85

-

-

... More
Supply,installation of GI earth flat - 25mm width X 3 mm thick for exhaust fans

200

-

-

... More
Supply,installation of GI earth flat - 50mm width X 6 mm thick for Jet fans /Axial fan motor

250

-

-

... More
Supply,installation of GI earth flat - 40mm width X 5 mm thick for Jet fans/ Axial fan motor

50

-

-

... More
Supply and installation of following sizes GI perforated Fire retartant type cable rack system made out of sheet steel folded to required shape with adequate number of supports.

-

-

-

... More
75mm x 40mm

327

-

-

... More
100mm x 50mm

37

-

-

... More
150mm x 50mm

412

-

-

... More
300mm x 50mm

163

-

-

... More
450mm x 50mm

162

-

-

... More
Supply, Installation, Testing & Commissioning of direct driven Vane Axial Fan with impeller having adjustable pitch angle blades. Fan motor shall be suitable for 415 ± 10% volts, 50 cycles, 3 phase power supply of class 'F' insulation. The fan shall be equipped with mounting bracket & spring isolators for the installation of the fans, inlet and outlet wire mesh guards with gravity louver. The price shall include all accessories & all necessary vibration isolation system, fire rated flexible canvass connections, mounting frames, hangers, supports, nut & bolts etc. All 3 phase motors shall be BMS compatible with PFC to monitor through BMS. All 3 phase motors shall be IE3.The capacities shall be as follows:

-

-

-

... More
Air flow rate : 9500 CFM Staircase pressurization for OffIce building.

6

-

-

... More
ESP: 300Pa

-

-

-

... More
Fan type: Vane axial fan

-

-

-

... More
Fan motor : 3.7 KW 4 pole 3 phase IP 55 Class F insulation

-

-

-

... More
Fan RPM : 1450

-

-

-

... More
Supplying, installing, testing and commissioning of Double skin cabinet suitable for fresh air / exhaust air as shown in drawings. The casing shall be constructed of galvanised steel. The fan shall be DIDW/SISW with forward curve impeller fitted with maintenance free external rotor motor. The fan noise level should not exceed 50dBA @ 3m.The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply with motor protection of IP21 for single phase motor and IP55 incase 3 phase. All 3 phase motors shall be BMS compatible with PFC to monitor through BMS except toilet ventilation fan as per Clients requirements. The fan motor shall be standard efficiency upto 3000 CFM.The capacities shall be as follows:

-

-

-

... More
Air flow rate : 1360 CFM (Left Wing Toilet Exhaust) - Booster fan

5

-

-

... More
Static Pressure : 300 Pa

-

-

-

... More
Indicative Fan motor : 0.55 KW, 4 pole, 1 Phase, IP 55, Class F

-

-

-

... More
Air flow rate : 1350 CFM (Right Wing Toilet Exhaust) - Booster fan

4

-

-

... More
Static Pressure : 300 Pa

-

-

-

... More
Indicative Fan motor : 0.55 KW, 4 pole, 1 Phase, IP 55, Class F

-

-

-

... More
Air flow rate : 1800 CFM (Left & Right Wing Toilet Exhaust) - Booster fan

8

-

-

... More
Static Pressure : 300 Pa

-

-

-

... More
Indicative Fan motor : 0.55 KW, 4 pole, 3 Phase IP 55, Class F

-

-

-

... More
Air flow rate : 2300 CFM (Basement Electrical Room 01&02)

2

-

-

... More
Static Pressure : 300 Pa

-

-

-

... More
Indicative Fan motor : 1.1 KW, 4 pole, 1 Phase, IP 55, Class F

-

-

-

... More
Supply, installation, testing and commissioning of forward / backward curved Centrifugal DIDW supply / exhaust air fan, celing suspended as per specifications. Fan shall be with necessary protection, Outlet dampers, Vibration isolators, Canvass connection. Motors shall be high efficiency IE3 type suitable for 415±10% volts, 50 cycles, 3 phase AC supply. Fan shall be installed with spring isolators. The outlet velocity should not exceed 10m/s and noise level shall not exceed 65dBA @ 3 m distance. Fresh air fan shall be considered with EU-4 filters as per drawings. All 3 phase motors shall be BMS compatible with PFC to monitor through BMS except toilet ventilation fan as per Clients requirements. The capacities shall be as follows:

-

-

-

... More
Airflow - 6300 cfm (Right Wing Toilet Exhaust )

2

-

-

... More
Static Pressure : 550 Pa

-

-

-

... More
Indicative Fan motor: 3.7 KW 4 Pole 3 Phase IP 55 Class F

-

-

-

... More
Airflow - 7000 cfm (Left Wing Toilet Exhaust )

2

-

-

... More
Static Pressure : 550 Pa

-

-

-

... More
Indicative Fan motor: 3.7 KW 4 Pole 3 Phase IP 55 Class F

-

-

-

... More
Airflow - 4300 cfm (Right Wing Toilet Fresh air fan with EU4 Filter)

2

-

-

... More
Static Pressure : 550 Pa

-

-

-

... More
Indicative Fan motor: 2.2 KW 4 Pole 3 Phase IP55 Class F

-

-

-

... More
Airflow - 4750 cfm (Left Wing Toilet Fresh air fan with EU4 filter)

2

-

-

... More
Static Pressure : 550 Pa

-

-

-

... More
Indicative Fan motor: 2.2 KW 4 Pole 3 Phase IP55 Class F

-

-

-

... More
Airflow - 5200 cfm (Kitchen Fresh air fan with filter )

1

-

-

... More
Static Pressure : 550 Pa

-

-

-

... More
Indicative Fan motor: 2.2 KW 4 Pole 3 Phase IP55 Class F

-

-

-

... More
Airflow - 5500 cfm (Aero Hub,MMR,Battery Room,Ups Room,Ge Office & Ge Lab Fresh air fan with EU4 filter)

2

-

-

... More
Static Pressure : 550 Pa

-

-

-

... More
Indicative Fan motor: 2.2 KW 4 Pole 3 Phase IP55 Class F

-

-

-

... More
Airflow - 6500 cfm (Service lift Well Pressurization)

2

-

-

... More
Static Pressure : 500 Pa

-

-

-

... More
Indicative Fan motor: 3.7 KW 4 Pole 3 Phase IP55 Class F

-

-

-

... More
Airflow - 11100 cfm (Passenger lift Well Pressurization)

6

-

-

... More
Static Pressure : 500 Pa

-

-

-

... More
Indicative Fan motor: 5.5 KW 4 Pole 3 Phase IP55 Class F

-

-

-

... More
Airflow - 11350 cfm (Fire pump room Exhaust)

1

-

-

... More
Static Pressure : 400 Pa

-

-

-

... More
Indicative Fan motor: 5.5 KW 4 Pole 3 Phase IP55 Class F

-

-

-

... More
Supply and installtion of SISW centrifugal fan made Galvanised steel sheet, backward curve fan as per specification suitable for out door application. All the motors shall be BMS compatible with PFC to monitor and on/off control through BMS.

-

-

-

... More
Duct mounted dry type electrostatic precipitators suitable for Kitchen Exhaust System without wash module: The unit shall Removes all airborne particles of Smoke, grease, Oil & Dust. The efficiency as per ASHRAE shall be 95% in single pass (Tested). It shall Captures particles as small as 0.01 micron s and shall have Permanent Cleanable cell (Long Life). The whole system shall not require any consumables and it shall discharge oil free air from the unit. (Single unit for 7500 CFM or Double unit for each 3750 CFM)

-

-

-

... More
Airflow - 7700 cfm (Kitchen exhaust-SISW centrifugal type fan with suitable duct mounted dry scrubber)

1

-

-

... More
Static Pressure : 750 Pa

-

-

-

... More
Indicative Fan motor: 5.5 KW 4 Pole 3 Phase IP55 Class H

-

-

-

... More
Supplying, installing, testing and commissioning of direct driven wall mounted PROPELLER FANS for exhaust air as shown in drawings. Each fan shall be complete permanent split capacitor or shaded pole motor, mounting plate, accessories like wire guard, bird screen and gravity louvers for weather protection as required. Fan shall be suitable for 220±10% volts 50 cycles, 1 phase AC supply.

-

-

-

... More
Airflow - 150 cfm (Security kiosk Toilet Exhaust)

2

-

-

... More
Indicative Fan motor: 0.22 KW 4 Pole 1 Phase

-

-

-

... More
Airflow - 250 cfm (Security kiosk Store exhaust)

1

-

-

... More
Indicative Fan motor: 0.22 KW 4 Pole 1 Phase

-

-

-

... More
Airflow - 650 cfm (Stp Exhaust)

2

-

-

... More
Indicative Fan motor: 0.55 KW 4 Pole 1 Phase

-

-

-

... More
Airflow - 2400 cfm (Transformer and HT panel area)

4

-

-

... More
Indicative Fan motor: 1.1 KW 4 Pole 1 Phase

-

-

-

... More
Airflow - 5300 cfm (Electrical panel room)

4

-

-

... More
Indicative Fan motor: 1.5 KW 4 Pole 3 Phase

-

-

-

... More
Airflow - 4300 cfm (Chiller pump room)

6

-

-

... More
Indicative Fan motor: 1.5 KW 4 Pole 3 Phase

-

-

-

... More
Supply, installation, testing and commissioning of circular inline fan for exhaust air made in glavanised steel with motor complete with flanged inlet and outlet flange connection for ducts, with heavy angle trapez hanger bolted to Units. All the motors efficiency shall comply with IE3.Fan shall be suitable for 220±10% volts 50 cycles, 1 phase AC supply. The capacities shall be as follows:

-

-

-

... More
Airflow - 250 cfm (Substation Toilet Exhaust)

1

-

-

... More
Static Pressure : 300 Pa

-

-

-

... More
Indicative Fan motor : 0.22 KW, 4 pole, 1 Phase, IP 21, Class F

-

-

-

... More
ELECTRICAL WORKS

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following

4

-

-

... More
1No. 125A TP&N MCCB with adjustable variable settings 55 KA with all connected accessories.(Outdoor type-IP 55).

-

-

-

... More
1 No. Star Delta starter (3 Phase) suitable for 15.0 KW for Chilled water Primary pumps with IBMS compatible Ammeter (with RS485 port to provide pump amps data to IBMS), selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable Potential free contact to provide IBMS control for remote operation in AUTO mode and all necessary accessories in a suitable MS enclosure with painting , earthling and suitable fixing arrangement as per specification and as required.

-

-

-

... More
The rate shall be including necessary interlocking, control wiring, interconnection & termination between normal working pumps and stand by pumps in the starter panel with necessary MCBs as required. The pump shall be working in the normal condition 3 nos working & 1 no stand by, in case any one of the normal working pump failure the stand by pump shall be start/run automatically in the system

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following

4

-

-

... More
1No. 125A TP&N MCCB with adjustable variable settings 55 KA with all connected accessories.(Outdoor type-IP 55).

-

-

-

... More
1 No. Star Delta starter (3 Phase) suitable for 11.0 KW for Chilled water Primary pumps with IBMS compatible Ammeter (with RS485 port to provide pump amps data to IBMS), selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable Potential free contact to provide IBMS control for remote operation in AUTO mode and all necessary accessories in a suitable MS enclosure with painting , earthling and suitable fixing arrangement as per specification and as required.

-

-

-

... More
The rate shall be including necessary interlocking, control wiring, interconnection & termination between normal working pumps and stand by pumps in the starter panel with necessary MCBs as required. The pump shall be working in the normal condition 2 nos working & 2 no stand by, in case any one of the normal working pump failure the stand by pump shall be start/run automatically in the system

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following

4

-

-

... More
1No. 32A TP&N MCCB with adjustable variable settings 50 KA with all connected accessories

-

-

-

... More
1 No. DOL starter (3 Phase) suitable for 11.0 KW for Basement Smokespill exhaust air fan with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories in a suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following (Outdoor type-IP 55)

4

-

-

... More
1No. 32A TP&N MCCB with adjustable variable settings 50 KA with all connected accessories

-

-

-

... More
1 No. DOL starter (3 Phase) suitable for 11.0 KW for Office Smokespill exhaust air fan with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories in a suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following (Outdoor type)

8

-

-

... More
1No. 32A TP&N MCCB with adjustable variable settings 50 KA with all connected accessories

-

-

-

... More
1 No. DOL (3 Phase) suitable for 5.5 KW for Liftwell pressurization, Kitchen exhaust and Pump room with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories in a suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following (Outdoor type)

12

-

-

... More
1No. 16A TP&N MCCB with adjustable variable settings 25 KA with all connected accessories

-

-

-

... More
1 No. DOL (3 Phase) suitable for 3.7KW for Toilet Exhaust, Service Lift and Staircase pressurization with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories ina suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following (Outdoor type)

7

-

-

... More
1No. 16A TP&N MCCB with adjustable variable settings 25 KA with all connected accessories

-

-

-

... More
1 No. DOL (3 Phase) suitable for 2.20KW for Kitchen Fresh air, Fresh air fan Space cooling for Data center and Toilet with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories ina suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following (Outdoor type)

10

-

-

... More
1No. 16A TP&N MCCB with adjustable variable settings 25 KA with all connected accessories

-

-

-

... More
1 No. DOL (3 Phase) suitable for 1.50KW for Chiller pump room with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories ina suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following (Outdoor type)

2

-

-

... More
1No. 16A TP&N MCCB with adjustable variable settings 25 KA with all connected accessories

-

-

-

... More
1 No. DOL (3 Phase) suitable for 1.1KW for HRW Wheel with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories ina suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
Supply,erection,testing and commissioning of starter comprising of the following (Outdoor type)

1

-

-

... More
1No. 16A TP&N MCCB with adjustable variable settings 25 KA with all connected accessories

-

-

-

... More
1 No. DOL (3 Phase) suitable for 0.55KW for HRW Wheel with Ammeter, selector switch, suitable ratio of CTs,control fuses, Auto/Manual selector switch, on/off/trip indication lamp with necessary power and control wiring interconnections etc.,with suitable provision to link with IBMS for remote operation and all connected necessary accessories ina suitable MS enclosure with painting , earthling and suitable fixing arrangement as required

-

-

-

... More
CHILLER ISOLATOR PANEL - outdoor type IP 66, Weather proof type

-

-

-

... More
Supply,installation testing and commissioning of cubicle type floor mounting panel board - outdoor type made out of MS sheet enclosure with Aluminium busbars, single busbar system, cable chamber, protection relays, interconnection, painting, earthing etc. comprising of the following.

-

-

-

... More
Incoming

-

-

-

... More
1 No.1000A TPN 50kA ACB

-

-

-

... More
feeders shall be having "ON,OFF&TRIP and 'RYB' indication lamps.

-

-

-

... More
With necessary Aluminium busbars, interconnections, providing Combined Digital type Mulitifunction Meter, ON,OFF,TRIP, phase indication lamps with control MCB/MPCB/ELCB/RCBOs, and necessary CTs, PTs etc. , as per the specification and drawings.

-

-

-

... More
Cable Entry: Top

-

-

-

... More
Cable Gland Plate: 3mm thick MS sheets.

-

-

-

... More
The panel shall be provided at nearby the chiller (350TR air cooled screw chiller).

4

-

-

... More
CHILLER ISOLATOR PANEL - outdoor type IP 66, Weather proof type

-

-

-

... More
Supply,installation testing and commissioning of cubicle type floor mounting panel board - outdoor type made out of MS sheet enclosure with Aluminium busbars, single busbar system, cable chamber, protection relays, interconnection, painting, earthing etc. comprising of the following.

-

-

-

... More
Incoming

-

-

-

... More
1 No.800A TPN 50kA ACB

-

-

-

... More
feeders shall be having "ON,OFF&TRIP and 'RYB' indication lamps.

-

-

-

... More
With necessary Aluminium busbars, interconnections, providing Combined Digital type Mulitifunction Meter, ON,OFF,TRIP, phase indication lamps with control MCB/MPCB/ELCB/RCBOs, and necessary CTs, PTs etc. , as per the specification and drawings.

-

-

-

... More
Cable Entry: Top

-

-

-

... More
Cable Gland Plate: 3mm thick MS sheets.

-

-

-

... More
The panel shall be provided at nearby the chiller (250TR air cooled screw chiller).

4

-

-

... More
Supply and fixing of lockable type push button control for ON / OFF near to all the equipments.

63

-

-

... More
CABLE AND TERMINATION WITH FRLS CABLE

-

-

-

... More
Supply, laying of following FRLS PVC cables

-

-

-

... More
4 Core 25 Sqmm PVC Cu.cable

10

-

-

... More
4 Core 16 Sqmm PVC Cu.cable (2 Runs one for Star and one for Delta)

160

-

-

... More
4 Core 10 Sqmm PVC Cu.cable (2 Runs one for Star and one for Delta)

320

-

-

... More
4 Core 6 Sqmm PVC Cu.cable (2 Runs one for Star and one for Delta)

160

-

-

... More
4 Core 4 Sqmm PVC Cu.cable

240

-

-

... More
3 Core 2.5 Sqmm PVC Cu. Cable

480

-

-

... More
3 Runs of Single Core 300 Sqmm XLPE flexible un-armored Cu. Cable From Isolation panel to each 350 TR Chiller. (1000A 3 Runs for Star and 3 Runs for Delta)

480

-

-

... More
3 Runs of Single Core 240 Sqmm XLPE flexible un-armored Cu. Cable From Isolation panel to each 250 TR Chiller. (800A 3 Runs for Star and 3 Runs for Delta)

480

-

-

... More
Supply termination and commissioning of the following size cables with suitable double compression glands and crimping socket with suitable earth clip & fixing accessories.

-

-

-

... More
4 Core 25 Sqmm PVC Cu.cable

10

-

-

... More
4 Core 16 Sqmm PVC Cu.cable

16

-

-

... More
4 Core 10 Sqmm PVC Cu.cable

32

-

-

... More
4 Core 6 Sqmm PVC Cu.cable

16

-

-

... More
4 Core 4 Sqmm PVC Cu.cable

24

-

-

... More
3 Core 2.5 Sqmm PVC Cu. Cable

48

-

-

... More
3 Runs of Single Core 300 Sqmm XLPE flexible un-armored Cu. Cable From Isolation panel to each 350 TR Chiller.(1000A 3 Runs for Star and 3 Runs for Delta)

48

-

-

... More
3 Runs of Single Core 240 Sqmm XLPE flexible un-armored Cu. Cable From Isolation panel to each 250 TR Chiller.(800A 3 Runs for Star and 3 Runs for Delta)

48

-

-

... More
EARTHING

-

-

-

... More
Supply and laying of 6 gauge bare copper conductor for equipments earthing.

60

-

-

... More
Supply and laying of 8 gauge bare copper conductor for equipments earthing.

965

-

-

... More
Supply and laying of 25x6mm bare copper strip for equipments earthing.

160

-

-

... More
Supply, erection of following sizes GI Ladder type cable rack system made out of sheet steel folded to required shape with adequate number of supports.

-

-

-

... More
The cable rack shall have runners rugs of suitable size, horizontal elbow, vertical elbow 90 Deg. Up vertical elbow 90 Deg. Down, re-deep, coupler plates, materials. The cable racks shall be suspended from ceiling supported from side walls in columns etc. with adequate size supporting angles / channels with fastners, welding, anchor bolts, nuts, rubber gasket to protect the cables near sharp bend’s edges etc. The rack shall have suitable cable clamping arrangements etc. The metal rack system shall be treated with one coat of rubber based polyvinyl paint as primer and finished with two coats of green enamel paint complete with all civil works for fabrication details

-

-

-

... More
150mm x 50mm

205

-

-

... More
300mm x 50mm

168

-

-

... More
450mm x 50mm

363

-

-

... More
600mm x 50mm

68

-

-

... More
Extra Charges for Factory Testing of 1 No. Air cooled Screw Chiller of 350 TR Capacity @ 100% load only (CIF, Chennai)

1

-

-

... More
Extra Charges for Factory Testing of 1 No. Air cooled Screw Chiller of 250 TR Capacity @ 100% load only (CIF, Chennai)

1

-

-

... More
Extra Charges for Boarding, Lodging, To and Fro charges (One Person from Client side and One person from Consultant side)

1

-

-

... More
Extra Charges for 5 years Compressor warranty for 8 Nos Air cooled screw chillers (CIF, Chennai)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.