Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Eprocure
Opening Date4 Jun 2019
Closing Date18 Jun 2019
Tender AmountRefer Documents
Costs
EMD
₹ 7,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_EB_127476_1Bid Award Id
ViewTender No
GCC 008 GL 002 19-20Tender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Transporting and fixing of stub and cleat and transporting with template to site and assembling at site and shifting the template from loc to loc and back to store including cost of lead , lift, labour etc., stub & cleat supplied as per std.ISI specification of approved by compettitent authority complete.(Template supplied by department) For HC Tower
1
-
-
... More
Supply,transporting and fixing of stub and cleat and transporting with template to site and assembling at site and shifting the template from loc to loc and back to store including cost of lead , lift, labour etc., stub & cleat supplied as per std.ISI specification of approved by compettitent authority complete.(Template supplied by department) For KC Tower
1
-
-
... More
PCC1:2;4 using 20mm metal for foundation concrete with out form work including cost of all materials, lead, lift ,frustum box , etc complete .
19.5
-
-
... More
PCC 1:2:4 using 20mm metal for foundation frustom concrete with steel form box including cost of all materials, lead, lift etc complete .
23
-
-
... More
PCC 1:2:4 using 20mm metal for chimney concrete with steel form box including cost of all materials, lead, lift ,frustum box , etc complete .
4.5
-
-
... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. HC tower.
1
-
-
... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. KC tower.
1
-
-
... More
supply & Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
2
-
-
... More
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
47
-
-
... More
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete
18
-
-
... More
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
98
-
-
... More
Transport and erection of towers including shorting out of tower, bolt and nut etc., asper the relevent IS specification. and transporting of tower parts from TLC sub stores including loading , unloading and labour charges for erection of tower with bolt and nutsand bunching, cutting of tower angles wherever necessary patch painting tightening of bolts and nuts punching,final checking and all other incidental charges for erection , lead , lift etc., complete, but excluding cost of tower parts. Any defect that are pointed out by operation wing of TANTRANSCO before taking over of line should be rectified by free of cost.
15.2
-
-
... More
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .
1
-
-
... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete
11
-
-
... More
Supply transport,Labour charges for fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete
2
-
-
... More
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
1
-
-
... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
2
-
-
... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete
5
-
-
... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
2100
-
-
... More
Labour charges for removal of large trees
2
-
-
... More
Labour charges for removal of Small tree
4
-
-
... More
Providing temporary guys wherever necessary including excavation,buryingout of anchor forstaywire,tightening,dismantling the same after completion of works including cost of allmaterials,lead,lift,labour etc complete.
18
-
-