Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Works
Transportation and Logistics
Eprocure
Opening Date18 Jun 2024
Closing Date4 Jul 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Labour charges for dismantling, transporting of 10MVA/16 MVA/25MVA(SH) 110 KV power Transformers from various SS, Unloading, erection, commissioning at various SS in Tirunelveli region for the period of one year contract
Labour charges for dismantling, transporting of 10MVA/16 MVA/25MVA(SH) 110 KV power Transformers from various SS, Unloading, erection, commissioning at various SS in Tirunelveli region for the period of one year contract
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour charges for Pulling of Power transformer(Allotted and Failed at existing SS and new SS) from plinth to safer side or vice versa as directed by the Field Engineer (35MTx3x70mtrs) +(40MTx3x70mtrs)+(50MTx1x70mtrs)

19250

-

-

... More
Labour charges for loading Power transformer with complete accessories including released oil, initial lead of 5 Metres as directed by the Field Engineer .(35MTx3)+(40MTx3)+(50MTX1)

275

-

-

... More
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer.From 31 Ton to 50 Ton, Upto 100 Kms

4

-

-

... More
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer.From 51 Ton to 100 Ton, Upto 100 Kms

1

-

-

... More
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer. Above 100KM (550kmx40x4)

88000

-

-

... More
Labour Charges for loading /unloading of power transformer oil barrel with new/ released oil from store to site or vice versa as directed by the Field Engineer.

105

-

-

... More
Labour charges for Unloading Power transformer with complete accessories including released oil, initial lead of 5 Metres as directed by the Field Engineer .(35MTx3)+(40MTx3)+(50MTX1)

275

-

-

... More
Labour charges for draining of oil from main tank (To Barrel) as directed by the Field Engineer.

28000

-

-

... More
Labour charges for Intial filling of oil under vacuum from spare tank / barrel to main tank as directed by the Field Engineer.

28000

-

-

... More
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.10 MVA Power Transformer

3

-

-

... More
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.16 MVA Power Transformer

1

-

-

... More
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor.Oil circulation required only in Main tank -Upto 5,000 Litres

35000

-

-

... More
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor.Oil circulation required only in Main tank -Above 5,000 Litres

65000

-

-

... More
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)Upto 8 core cable.

2.25

-

-

... More
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)Above 8 core cable

2.1

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.32 mm

30

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.28 mm

30

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.25 mm

30

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.19 mm

50

-

-

... More
Termination of cable core end dressed neatly including the cost of cable socket (lug) ferrules, sleeves, tags, ties, stropes, etc., as directed by the field engineer.(No.of core ends in unit of 1000)(150x6)=900nos= 0.9 units

1.05

-

-

... More
Supply of various steel materials and Labour machinery consumables for the double earthing of neutral , main tank and other panel etc.as directed by the field engineer.(0.25Tx8)

2

-

-

... More
Labour charges for one finish coating of aluminium painting works with spray gun for transformer complete including T&P etc. and painting of valves, bushings with red, yellow, blue and black paint including cost of paint of reputed make company viz Asian, Berger etc., and Consumables as directed by the field engineer. 10 MVA to 25 MVA Power Transformer

7

-

-

... More
Supply and erection of silica gel breather flange type including the cost of 4-6 mm blue mesh silica gel.5Kg

6

-

-

... More
Supply and erection of Neutral omega copper with copper M-42 Nut & washer of suitable length and diameter as per drawing and as directed by the field engineer.Up to 16MVA

4

-

-

... More
Supply & erection of 1 no. Oil Temperature indicator

1

-

-

... More
Supply & erection of 1 no. Winding temperature indicator with four control switch

1

-

-

... More
Supply and erection of various sizes of GI bolts &Nuts and washers of required sizes to be used for erection of Turret, Radiator, wheel bolts, Conservator, Foundation bolts for A frame etc. as per the requirement during erection.

100

-

-

... More
Supply ,transporting and erection of Power Transformer accessories- PRV with operating pressure 0.42,0.49,0.56 Kg/cm2,operating tolerance+ 0.1Kg/cm2, port opening Nominal 70 mm.

1

-

-

... More
Supply ,transporting and erection of Power Transformer accessories -Surge relay as per IS 3637

1

-

-

... More
Supply ,transporting and erection of Power Transformer accessories- Magetic Oil Gauage dial with minimum,maximum and normal (at 30C) marking and pointer and low oil level contact of 0.5 Amps , 110/30 V DC rating.

1

-

-

... More
Supply ,transporting and erection of Power Transformer accessories- Buchholz relay as per IS 3637

1

-

-

... More
Supply ,transporting and erection of Power Transformer accessories -Butterfly valve as per required size

1

-

-

... More
Supply ,transporting and erection of Power Transformer accessories- Bushing CT's -HV CT'S as per required ratio

1

-

-

... More
Supply ,transporting and erection of Power Transformer accessories -Bushing CT's -LV CT's as per required ratio

1

-

-

... More
Labour Charges for Overhauling of Power/Auto Transformer OLTC mechanism including cleaning and replacing of defective spares and gaskets etc. as directed by the Field Engineer.(Gasket & Spares will be supplied by TANTRANSCO) (10MVA and above)

4

-

-

... More
Charges for Transport insurrance for power Transformer from the released SS Site to the Allotted SS Site with nationalised insurrance company( Billed as per actual)

4

-

-

... More
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only

1

-

-

... More
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only

1

-

-

... More
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.