Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Works
Civil And Construction
Electrical and Electronics
Eprocure
Opening Date25 Sep 2024
Closing Date15 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for foundation in soft disintegrated rock, laterite soft rock or kankar not requiring blasting for including initial lead of 10 m and lift of 2 m etc., complete.

57.6

-

-

... More
Excavation for foundation in DMR MR not requiring blasting for including initial lead of 10 m and lift of 2 m etc., complete.

57.6

-

-

... More
Earth work Excavation for foundation and depositing on bank with initial lead of 10m and lift of 2 m in removing hard rock by wedging and chiselling where blasting is prohibitted and trimming to proper shape including all leads lifts etc., complete.

19.2

-

-

... More
PCC 1:3:6 using 20mm HB metal for tower foundation concrete with form work including cost of all materials, labour,curing lead, lift, curing etc., complete.

3.62

-

-

... More
PCC 1:2:4 using 20mm HB metal for tower foundation frustum concrete with form work including cost of all materials, labour,curing lead, lift, curing etc., complete.

34.59

-

-

... More
PCC 1:2:4 using 20mm HB metal for tower foundation chimney concrete with form work including cost of all materials, labour,curing lead, lift, curing etc., complete.

5

-

-

... More
Assembling template with providing of template at site and shifting the template from loc to loc. and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete for KCR

1

-

-

... More
Assembling template with providing of template at site and shifting the template from loc to loc. and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete for HCR

1

-

-

... More
Back filling with excavated earth other than sand including watering consolidation in 150mm thick layer and forming platform around tower legs with excess earth etc., complete.

148.78

-

-

... More
Transporting of excess excavated earth away from site within a lead of 100 m including all labours, lead, lift etc., complete.

43.21

-

-

... More
Providing pipe type earthing including necessary exca-vation for fixing 3M long of 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the earth strips with the legs of the stub including cost of pipe refilling earth, fixing charges transport lead, lift, labour,etc., complete.

2

-

-

... More
Plastering with CM 1:3, 12 mm thick for coping portion including cost of all materials, labour, lead, lift curing etc., complete.

10

-

-

... More
Labour charges for erection of GI tower parts , transporting unloadingat site erection of tower tightening , punching of bolt & nut and final checking rectification of tower parts if any during erection and transporting etc

9.81

-

-

... More
Tack welding of bolt nuts in the newly erected tower upto bottom crossarm leval including three tack weld for each bolt nut hire charges for welding machine cost of welding rod and painting with cold galvanized paint over welded portion including cost all materials T&P labour lead lift etc complete

1340

-

-

... More
Painting with anticorrosive black paint upto 1m height from chimney leval ncluding cost all materials T&P labour lead lift etc complete

2

-

-

... More
Providing temporary guys at the time of releasing and lowering and stringing of power conductor and earth wire etc., rough sagging and single tensioning with necessary excavation of pits fixing rails etc., and dismantling stay after completion of work including all , T&P , lead lift labour etc., completen

5

-

-

... More
Transporting and Hoisting of 7 units of single Suspension insulators with fittinfs transporting from stores to site including cost of all T & Ps with all labour, lead, lift, etc complete as per standard specification.

3

-

-

... More
Transporting and Hoisting of 8 units of tension insulators with fittings transporting from stores to site including cost of all T & Ps with all labour, lead, lift, etc complete as per standard specification.

12

-

-

... More
Stringing of 3 Nos Zebra conductor, paving out, Rough sagging, Tensioning clipping, providing vibration dampers for tension locations including giving jumper connection Availing LT/HT LC including cost of transporting, lead, lift, labour, major & minor T &Ps etc., as per Standard specification complete

0.55

-

-

... More
Realeasing and lowering of 3 Nos panther Conductor and Restringing the same conductor including cost of all major and minor T&P with all Leads,Lifts, etc. Complete.(under LC Condition)

2

-

-

... More
Labour charges for releasing at Exist.Loc.22 and stringing at Prop.Loc.22A & 22B of OPGW 48 Fibre cable including transporting from store to site, loading and unloading, paving out with using pilot rope by using puller machine at both end and rough sagging and tensioning including cost of all labour, lead, lift, transport and hire charges for special T&P's etc complete.

0.18

-

-

... More
Supplying and fixing of Name board of size 0.750 x 0.450mm using 18 gauge MS sheet with 25x25x3mm MS angle frame painting with approved enamel painting two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labours, lead, lift, etc., complete as per standard specification.

2

-

-

... More
Supply and fabrication and fixing of 20 mm eye bolt suitable for KCR tower including cost of materials, labour, lead, lift, etc., complete

3

-

-

... More
Labour charges for fixing of Number plate, wherever necessary including all lead, lift, etc., complete

3

-

-

... More
Labour charges for fixing of Danger boardand phase plate wherever necessary including all lead, lift, etc., complete

2

-

-

... More
Labour charges for Dismantling existing tower of GI tower parts , transporting unloading and sortingout tower partsat karamadai central store and stocking them as directed by incharge including cost all materials T&P labour lead lift etc complete

3.45

-

-

... More
Lowering and Dismantling of ACSR dog conductor and 1no Earth wire including cost of all T & P lead lift ,labour etc complete

0.21

-

-

... More
Coilliing the Dismantled conductor, Earthwire to convenient length transporting to store , stocking them including all T& P lead lift labour etc complete

0.62

-

-

... More
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only

1

-

-

... More
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only

1

-

-

... More
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.