Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Eprocure
Opening Date6 Oct 2018
Closing Date22 Oct 2018
Tender Amount₹ 1,09,39,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.

3229

-

-

... More
Transporting and fixing of stub and cleat with supply of template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete.(Stub and cleat only supplied by department)

-

-

-

... More
KCO tower(w)

9

-

-

... More
HCO tower(w)

11

-

-

... More
GCO tower(w)

16

-

-

... More
PCC 1:3:6 using 40mm metal for foundation without formwork including cost of all materials lead lift etc complete.

255

-

-

... More
PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete .

349

-

-

... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.

-

-

-

... More
KCO tower(w)

9

-

-

... More
HCO tower(w)

11

-

-

... More
GCO tower(w)

16

-

-

... More
Removal of surplus earth in a low lying area to a average distance of 200m by head load.

604

-

-

... More
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.

36

-

-

... More
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete

306

-

-

... More
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.

3341

-

-

... More
Transport and erection of GI tower angles including cost of T &P, labour, lead, lift etc complete.as per approved drawing and specification.

218

-

-

... More
Labour charges for transport of 6 Nos of Panther conductor from department store,supply and fixing of panther conductor hardwares(ie.SB damper, Dshackle, U bolt,MSJ for panther etc ), paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete.

-

-

-

... More
Continuous span without L.C

7

-

-

... More
single span without L.C

8

-

-

... More
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares(ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing,rough sagging, tensioning,including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete.

-

-

-

... More
Continuous span without L.C

7

-

-

... More
single span without L.C

8

-

-

... More
Labour charges for transporting and hoisting of 7 units of 90 KN single suspension polymer insulators with supply and fixing of SS fittings for panther and U bolt including all cost of labour,lead, lift, T & P etc complete

-

-

-

... More
Without PA rod for panther

27

-

-

... More
With PA rod for panther

96

-

-

... More
Labour charges for transporting and hoisting of 8 units of 120 KN single Tension polymer insulators with supply and fixing of ST fittings for panther,S.B damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete

240

-

-

... More
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete.

15

-

-

... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete

159

-

-

... More
Supply transport,Labour charges for fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete

-

-

-

... More
Number Plate

36

-

-

... More
Danger Board

20

-

-

... More
Phase Plate( R,Y,B)

20

-

-

... More
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete

13

-

-

... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete

36

-

-

... More
Providing temporary guys wherever necessary including excavation,buying out of anchor for stay wire, tightening, dismantling the same after completion of works including cost of allmaterials,lead,lift,labour etc complete.

20

-

-

... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete

25

-

-

... More
Labour charges for removal of trees

-

-

-

... More
Large tree

300

-

-

... More
Small tree

250

-

-

... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.

18500

-

-

... More
Providing trussels for major and minor road crossing including cost of all materials,labour, lead lift etc. Complete.

3

-

-

... More
Releasing, lowering and restringing of existing 3 Nos. panther conductor under L.C including all labour, lead,lifts,T&P,etc complete.

2

-

-

... More
Releasing, Lowering and restringing of Existing 1 No 7/3.55 mm GI earthwire L.C including all labour, lead,lifts,T&P,etc complete.

2

-

-

... More
SGST & CGST (If applicable quote the value, if not enter '0')

1

-

-

... More
IGST (If applicable quote the value, if not enter '0')

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.