Tamil Nadu Transmission Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Eprocure
Opening Date14 Aug 2018
Closing Date28 Aug 2018
Tender AmountRefer Documents
Costs
EMD
₹ 17,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Providing foundation concrete for structures and equipment plinths and retaining wall around the yard,cable duct for the Enhancement of power transformer capacity from 2 16 MVA to 3 16 MVA at Valavanur 110 22 KV SS.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_EB_101767_1Bid Award Id
ViewTender No
GCC 239 GL 148 2018 19Tender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PCC 1:2:4, using 20mm HBG metal foundation without form work including cost of cement, all materials, labour, lead, lift, etc. complete.
24.5
-
-
... More
PCC 1:3:6, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.
13
-
-
... More
PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.
6.5
-
-
... More
Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift, etc. complete.
285
-
-
... More
Colour washing two coats with approved qulity of colour pigments over one coat of white cement including cost of all materials , labour lead and lift etc complete.
257.5
-
-
... More
RCC 1:1/2:3 using 12- 20mm HBG metal for foundation with form work including cost of all materials, form work including cost of all materials, labour, lead, lift, etc. complete.(But excluding cost of steel reinforcement)
16
-
-
... More
RCC 1:1.5:3 using12- 20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab for baffle wall concrete.
4.5
-
-
... More
supply,fabrication and placing reinforcements of RTS rods in position as per drawing for all RCC works including cost of all materials, binding wire, labour for bending, tying, placing in position, lead, lift, etc. complete.
1400
-
-
... More
Supply ,Labour charges for fabrication, fixing in position of MS rail with proper anchorage by using welding and cutting to the required size and length anf fixing over transformer plinth as per departmental specifications including cost of labour, transport, placing in position, lead,lift etc complete.
270
-
-
... More
Supply & Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete
149
-
-
... More
Providing PVC pipe using 110mm dia 4 Kg / sqcm, PVC pipe and pvc clamp line supreme etc, including fixing PVC washer type door bend & shoe, in correct position including cost of all materials, labour, transport lead, lift, etc., complete, including PVC accessories and washers.
15
-
-
... More
Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete
50
-
-
... More
Brickwork in CM 1:5 mix using bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. By using II class Champer Burnt bricks
31
-
-
... More
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete. 32 mm dia
110
-
-
... More
Providing and laying PVC high density pipe including cost of all materials viz.bend, labour for cutting threading fixing and tightening necessary excavation etc., complete.25mm dia
75
-
-
... More
Supplying and fixing inposition of heavy duty wheel valve of approved best quality including cost of all special fixtures lead, lift,etc., complete for eath pit water supply arrangements.. 32mm dia
1
-
-
... More
Supplying and fixing inposition of heavy duty wheel valve of approved best quality including cost of all special fixtures lead, lift,etc., complete for eath pit water supply arrangements.. 25mm dia
1
-
-
... More
Supplying and fixing inposition of heavy duty wheel valve of approved best quality including cost of all special fixtures lead, lift,etc., complete for eath pit water supply arrangements..20mm dia
1
-
-
... More
Supplying and fixing of 12mm high quality brass screw down bib cock such as leader, zeolite and zenith of any other approved quality cost of all materials, labour, lead, lift, etc., complete.
5
-
-
... More
Supply and spreading of quarry dust inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
80
-
-
... More
Supply and apreading of 20mm of HB stone inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
120
-
-
... More
Collection, supplying, stacking and spreading of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer.
198
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements