Tamil Nadu Transmission Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Jan 2023
Closing Date30 Jan 2023
Tender Amount₹ 48,80,000
Costs
EMD
₹ 48,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_EB_283105_1Bid Award Id
ViewTender No
LT-03/22-23 of SE/GCC-I/CNITender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. ST Fittings for Zebra Conductor
9
-
-
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. SB Vibration Damper for zebra conductor
9
-
-
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Mid span compression Joint for Zebra.
3
-
-
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Repair sleeve for Zebra
3
-
-
... More
Supplying and providing Pipe type earthing with 40 mm dia GI pipe (B class) as per specification and as direct by the site engineer including cost of all meterials, cutting of earth wire to the required length and connecting to the stub and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
1
-
-
... More
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
1
-
-
... More
Labour charges for Clearing juliflora jungle with uprooting including cost of all labour, lead, lift, etc., complete and as directed by the Dept. Engineer at site.
8230
-
-
... More
Labour charges of Engaging Hitachi for dismanlting and erection purpose of towers during restoration work including lead lift, etc., complete.
16
-
-
... More
Providing working platform by supply of gravel in tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
1900
-
-
... More
Labour charges for Sinking well in loose soils, light black cotton soil, dandy loam and ordinary soil under water including bailing or pumping charges if necessary, labour, transport, lead, lift etc., complete as directed by the department engineer at site. - first depth of 2 meters
43
-
-
... More
Labour charges for Sinking well in loose soils, light black cotton soil, dandy loam and ordinary soil under water including bailing or pumping charges if necessary labour, transport, lead, lift etc., complete as directed by the department engineer at site - second depth above 2 meters
31
-
-
... More
Manufacuring and supply of precast of RCC well ring 2.40m, thickness 75mm and 0.30m depth including cost of 8mm RTS rods 3 nos longtudinally and 20cm C/C vertically including all materials, dewatering, lead lift etc complete as directed by the department engineer at site.
48
-
-
... More
Labour charges for transport of template including assembling of template and shifting of stub and cleat, shifting template from location to location and reassambling the same including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.
1.42
-
-
... More
P:C:C 1:2:4 using 12 to 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
79.5
-
-
... More
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for muffing and coping with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
1.3
-
-
... More
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, tightening, punching of bolt and nuts transporting to each and every location final checking cost of T&P, labour, transport from stores, lead, lift, etc., complete the defects pointed out during final checking for handing over and commissoning the line must be attended by the contractor without any extra cost to the board.
10.79
-
-
... More
Labour charges for welding of bolts and nuts at two places 1 cm each diagonally opposite each other after tightening and puching to avoid theft of tower parts with one coat of painting zinc coat in the welded portion including cost of welding rod, hire charge for generators, painting the bolts and nuts transporting labour, lead, lift etc complete as per instrution incharge of department engineer at site
460
-
-
... More
Labour charges for Transporting and hoisting of 14 units ordinary disc insulators 120 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.
9
-
-
... More
Labour charges for Transporting and hoisting of 13 units ordinary disc insulators 90 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.
3
-
-
... More
Labour charges for transporting and paying out of 3 Nos. of Zebra conductor with fittings including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete. For continuous span
0.64
-
-
... More
Labour charges for Stringing of 3 Nos. Zebra conductor with fittings including transport, sorting out of conductor according to drum schedule and loading and unloading at site, providing trussels and rough sagging, tensioning, clipping, labour, providing vibration dampers including giving jumper connections, cost of T&P, lead and lift etc., complete Under Normal. For Single Span
2
-
-
... More
Labour charges for Paying out, rough sagging tensioning of 1 No. OPGW cable with fittings including transport, sorting out of conductor according to drum schedule and loading and unloading at site, providing trussels and rough sagging, tensioning, clipping, labour, providing vibration dampers including giving jumper connections, cost of T&P, lead and lift etc., complete Under Normal. - For continous Span
2
-
-
... More
Earth work excavation hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc.complete (PROTECTION FOR RAISED CHIMNEY) For strengthening of tower legs at Loc 11 and 15
3.5
-
-
... More
P:C:C 1:2:4 using 20mm HBG metal For Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
1.95
-
-
... More
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for chimney with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
0.65
-
-
... More
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
28
-
-
... More
Labour charges for temporary stay during rough sagging and tensioning, with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site.
6
-
-
... More
Painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials labour lead, lift etc., complete as directed by the department engineer at site.
2
-
-
... More
Labour charges for bailing out of water by using pumpset including the cost of heir charges for diesel pumpset 0.5HP, labour fuel charges, transport, T & P, lead, lift ect., complete as directed by the department engineer at site.
8
-
-
... More
Labour charges for dismantling of 3 no Zebra conductor including rough sagging, tensioning using tensioner/puller as per specification, clipping, jumpering, fixing of dampers , transport including cost of all T&Ps, labour lead and lifts etc., complete Under Normal and devoluting to stores
1
-
-
... More
Labour charges for dismantling of 1 No. GI eathwire including rough sagging, tensioning using tensioner/puller as per specification, clipping, jumpering, fixing of dampers , transport including cost of all T&Ps, labour lead and lifts etc., complete Under Normal and devoluting to stores
1
-
-
... More
SCRAP:- Labour charges for dismantling of existing GI tower and owing the same as is where is condition including the cost of transport, lead, lift etc., complete as directed by the department engineer at site. (The rate should be quoted not less than Rs. 25000/- per MT)
1.92
-
-
... More
GST for bidders within TamilNadu
-
-
-
... More
SGST
1
-
-
... More
CGST
1
-
-
... More
GST for bidders outside TamilNadu (IGST)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements