Tamil Nadu Transmission Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Civil And Construction
Electrical and Electronics
Water Storage And Supply
Electrical Works
Eprocure
Opening Date7 Mar 2024
Closing Date12 Mar 2024
Tender Amount₹ 43,18,900
Costs
EMD
₹ 43,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_443096_1Bid Award Id
ViewTender No
OT-46/2023-24 of SE/GCC-1/CHNTender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. ST Fittings for Kundah
24
-
-
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. PA rods for Kundah
60
-
-
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Mid span compression joint for Kundah
2
-
-
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Repair sleeve for Kundah
2
-
-
... More
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Vibration Damper for Kundah
24
-
-
... More
Supply of Name board with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
4
-
-
... More
Supply of Danger Board with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
4
-
-
... More
Supply of phase plate (Set of three) 20 mm dia with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
8
-
-
... More
Supply of Cirtuit plate with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
8
-
-
... More
Supply of Anti Climbing devices with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
4
-
-
... More
Supply of Name Plate with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site.
4
-
-
... More
Supplying of Pipe type earthing with 40 mm dia GI pipe (medium class) as per specification and as direct by the site engineer.
1
-
-
... More
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
1
-
-
... More
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
73
-
-
... More
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Soft Disintegrated Rock not requiring blasting including cost of all materials lead lift etc complete
21
-
-
... More
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Medium rock dense medium rock not requiring blasting including cost of all materials lead lift etc complete as directed by the department engineer at site.
11
-
-
... More
Labour charges for transport of template including assembling of template, stub and cleat and shifting template from location to location and reassambling the same including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.
1
-
-
... More
Labour charges for Providing shoring and shuttering during excavation and concreting works using country wood planks and scantling including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. (Any other improved method is also acceptable to TANTRANSO but at not extra cost to TANTRANSCO)
150
-
-
... More
Labour charges for Filling with M- sand including watering and consolidation as per standard specification, including cost of all labour, material, lead and lift etc., complete as directed by the department engineer at site.
3
-
-
... More
Labour charges for providing Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. Without form work
3
-
-
... More
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for foundation without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
7
-
-
... More
Providing and laying P.C.C 1:2:4 using 20mm HBG stone for chimney with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
4
-
-
... More
Labour charges for providing RCC 1:1.5:3 using 12-20 mm HBG metal for foundation including cost of all materials labour, lead, lift, etc., complete but excluding cost of steel reinforcement.
9
-
-
... More
Supplying, fabrication and placing in positioiin of MS/RTS reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site.
0.85
-
-
... More
Labour charges for Clearing of juliflora jungle with uprooting including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
3100
-
-
... More
Labour Charges for cutting and removing small Palmira / Coconut stumps and other trees and clearing the same away from the site including the cost of all labour lead, lift etc., complete as directed by the department engineer at site.
5
-
-
... More
Labour Charges for cutting and removing large Palmira / Coconut stumps and othertrees and clearing the same away from the site including the cost of all labour lead, lift etc., complete as directed by the department engineer at site.
5
-
-
... More
Labour charges for providing Pipe type earthing with 40 mm dia GI pipe (medium class) as per specification and as direct by the site engineer including cost of all meterials, cutting of earth wire to the required length and connecting to the tower leg and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
5
-
-
... More
Labour charges for bailing out of water by using pumpset including the cost of heir charges for diesel pumpset 3/5HP, labour fuel charges, transport, T & P, lead, lift ect., complete as directed by the department engineer at site.
16
-
-
... More
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for muffing and coping with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
1
-
-
... More
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
8
-
-
... More
Labour charges for erection of tower parts (special cross arm) for square cross arm in accordance with boards design as per drawings furnished and as per IS:2062 Grade A and as detailed in this specification including cost of all materials, labour, leads, and lifts etc., complete as directed by the department engineer at site. LC Condition.
15.5
-
-
... More
Labour charges for welding of bolts and nuts at two places 1 cm each diagonally opposite each other after tightening and puching to avoid theft of tower parts with one coat of painting zinc coat in the welded portion including cost of welding rod, hire charge for generators, painting the bolts and nuts transporting labour, lead, lift etc complete as per instrution incharge of department engineer at site
1950
-
-
... More
Labour charges for releasing and re-stringing of 6 Nos. Kundha conductor without damge to the conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. LC Condition.
3.01
-
-
... More
Labour charges for Transporting and hoisting of 13 units 90 KN disc insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
9
-
-
... More
Labour charges for Transporting and hoisting of 14 units disc insulators 120 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
24
-
-
... More
Labour charges for releasing and re-stringing of 1 No.HTS earth wire without damage to the earth wire with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. LC Condition.
3.01
-
-
... More
Providing independent temporary guys for sets of each 3nos including digging of trench of size of 6'x6'x6', supplying and placing of RSJ/Concrete Block/Wooden log of 50 Kgs weight in the dug pit, tying the cross arm with the wooden log/RSJ/Concrete with the help of GI earthwire to a distance of 1.5 x Heinght of tower, refilling the trench and releasing after completion of work etc. complete and as directed by the department engineer at site.
1
-
-
... More
Arranging and attending shutdowns work on HT / LT, EHT lines, dismandling and restringing of HT / LT / EHT lines after completion of line stringing work including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site
5
-
-
... More
Labour charges for installing of tower accessories including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Danger Plate.
1
-
-
... More
Labour charges for installing of tower accessories including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Number Plate.
1
-
-
... More
Labour charges for installing of tower accessories including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Phase Plate (set of three).
2
-
-
... More
Labour charges for installing of tower accessories including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Circuit Plate (set of two).
2
-
-
... More
Labour charges for installing of tower accessories including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Name Plate
1
-
-
... More
Labour charges for installing of tower accessories including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Anti Climbing devices (set of four)
1
-
-
... More
Labour charges for Painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials labour lead, lift etc., complete as directed by the department engineer at site.
1
-
-
... More
Labour charges for dismantling of Reinforced Cement Concrete and disposing the debris away from the SS permises including all materials, labour, transport, lead and lift etc., complete as directed by the department engineer at site.
2
-
-
... More
Labour charges for dismantling the existing towers as is where is condition consisting of various type of towers and devoluted to stores in good condition including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition.
5.3
-
-
... More
Labour charges for dismantling the existing 14 unit 120 KN insulator as is where is condition consisting of various type of towers and devoluted to stores including cost of loading, unloading, T&P, labour, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
12
-
-
... More
Labour charges for dismantling the existing 13 unit 90 KN insulator as is where is condition consisting of various type of towers and devoluted to stores including cost of loading, unloading, T&P, labour, lead, lift etc., complete as directed by the department engineer at site. Under LC Condition
6
-
-
... More
GST for bidders within TamilNadu
-
-
-
... More
SGST
1
-
-
... More
CGST
1
-
-
... More
GST for bidders outside TamilNadu (IGST)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements