Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date9 Aug 2023
Closing Date23 Aug 2023
Tender Amount₹ 30,20,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R:C:C 1:1.5:3 using 12 to 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work

39.18

-

-

... More
R.C.C. 1:1.5:3 using 12- 20mm metal with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.

37.21

-

-

... More
Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site.

4.58

-

-

... More
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site

16.15

-

-

... More
Providing and laying P.C.C 1:2:4 using 12-20mm HBG stone for Plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.

25

-

-

... More
Plastering with CM 1:3, 12mm thick for bottom of roof slab, bottom and sides of sunshade partition walls etc. including cost of materials all labour,curing, lead, lift etc., complete. as directed by the department at site.

385

-

-

... More
Providing grout holes for equipment structure at required position including cost of all materials, curing,labour, lead and lift etc., complete as per standard specification and as directed by the department engineer at site.

140

-

-

... More
Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as per standard specification and as directed by the dept. Engineer at site.

24

-

-

... More
Filling with stone dust including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site.

100

-

-

... More
Filling with 20 mm B.G metal including cost of all labour, materials, transport, leads, lift,etc., complete and as directed by the department engineer at site.

100

-

-

... More
Fabrication, galvanising and supplying of bolt and nut with 2 nos. washer in high tensile steel including 10 cm "L" at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc completed as directed by the department engineer at site.

578.59

-

-

... More
Colour washing two coats using cement paint over one coat of white washing including cost of all materials, labour, lead lift etc., complete as per standard specification and as directed by the department engineer at site.

289

-

-

... More
Supplying, fabrication of MS angle including cost of GI angle, flats as per drawing and specification and galvanising placing in position including cost of angle including cost of all materials, transport, labour, lead etc., complete as directed by the department engineer at site.

127

-

-

... More
Supplying and laying 200 mm dia (8 inches dia) good quality PVC pipes for cable ducts jointed with extra joints including laying pipe from yard to trench including cost of all materials, transport, labour, lead etc., complete as directed by the department engineer at site.

7.5

-

-

... More
Labour charges for spreading and levelling the excavated earth including all materials, labour, T&P, lead and lift etc., complete as directed by the department engineer at site.

44.16

-

-

... More
Labour charges for dismantling of Reinforced Cement Concrete by drilling hols and breaking with compressor drilling machine and disposing the debris away from the SS permises including all materials, labour, T&P, lead and lift etc., complete as directed by the department engineer at site.

22

-

-

... More
Supplying and providing 90 lbs rails in transformer plint and labour charges for fixing in correct position and aligenment as directed by dept.Engineer at site including cost of Rail, cutting charges , transport to site, labour, lead, lift etc. Complete as directed by the department engineer at site.

0.36

-

-

... More
Fabrication, galvanising and supplying of various type of normal tower parts, tower body/leg extension complete (excluding bolts, nuts and stubs) abd including transport charge, hanger, d-shackles and all taxes etc complete as directed by the department engineer at site and as per standard specification.

1.61

-

-

... More
Transport & erection of various type of towers with bolts and nuts including tack welding of bolts & nuts, supply of zinc rich primer, enamel pain and application of one coat of zinc rich primer and two coats of zinc rich enamel paint over the welded portion as per technical specification and as directed by the department engineer at site.

1.61

-

-

... More
GST for bidders within TamilNadu

-

-

-

1

-

-

1

-

-

... More
GST for bidders outside TamilNadu (IGST)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.