Tamil Nadu Transmission Corporation Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date2 Aug 2024
Closing Date21 Aug 2024
Tender AmountRefer Documents
Costs
EMD
₹ 26,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Erection, Testing And Commissioning Of 230 Kv Mc Line Towers With Acsr Zebra Conductor From Ariyalur 765/400/230 Kv Ss To Sankarapuram 230/110 Kv Ss Including Supply Of All Materials, Under Total Turnkey Contract Basis.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_468830_1Bid Award Id
ViewTender No
T-59Tender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply of line materials as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
ACSR Zebra conductor
200
-
-
... More
OPGW 48 Fibre Cable with accessories
19.1
-
-
... More
ADSS cable 48 fibres ,HDPE pipe with accessories
2.5
-
-
... More
Earth wire7/3.66 mm
1.6
-
-
... More
90 KN Insulator
6550
-
-
... More
120 KN Insulator
14650
-
-
... More
ST fitting for Zebra
1050
-
-
... More
SS fitting for Zebra
505
-
-
... More
SB Damber for Zebra
2100
-
-
... More
Earth wire tension clamp for 7/3.66mm EW.
10
-
-
... More
Vibration damper for 7/3.66 mm Earth Wire
10
-
-
... More
PA Rod forZebra conductor
505
-
-
... More
Aluminium Earth bond
125
-
-
... More
Mid span joint for Zebra
102
-
-
... More
Repair sleeves for Zebra
51
-
-
... More
Number Plate
69
-
-
... More
Phase Plate (Set of three)
276
-
-
... More
Danger Board
69
-
-
... More
PG Clamp for Zebra
12
-
-
... More
D-shackle
114
-
-
... More
Schedule B (Civil and Erection Works) Clearing Light jungle
186250
-
-
... More
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
69
-
-
... More
Earthwork excavation in hard gravelly soil inlcuding all cost of lead lift etc complete.
8036
-
-
... More
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
5358
-
-
... More
Earthwork excavation in MR and DMR requiring blasting.
5358
-
-
... More
Earthwork excavtion in hard rock measured in solid including blasting etc.,complete.
6697
-
-
... More
Earthwork excavtion in hard rock Hard rock wedging and chiselling etc.,complete.
1340
-
-
... More
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport etc complete.
520
-
-
... More
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete as directed by the Engineer incharge at site.
2795
-
-
... More
Fixing of stub and cleat with supply of template to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. MA type tower
19
-
-
... More
MC type tower
21
-
-
... More
MD type tower
18
-
-
... More
NMD type tower
2
-
-
... More
KSR type tower
2
-
-
... More
LS(O) type tower
6
-
-
... More
DD type tower
1
-
-
... More
PCC 1:3:6 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete.
461
-
-
... More
PCC 1:2:4 using 20mm metal for foundation with formwork including cost of all materials lead lift etc complete.
173
-
-
... More
PCC 1:2:4 using 12 to 20mm HB Stone for foundation with steel form work including cost of cement all materials labour etc., complete.Muffing and coping.
325
-
-
... More
RCC 1:1.5:3, using 12 to 20mm HBG metal for foundation , Frustum and chimney concrete with form work including cost of cement all materials labour, lead, lift etc., complete. As directed by the Engineer at site.
3063
-
-
... More
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
321
-
-
... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
22931
-
-
... More
Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site.
69
-
-
... More
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
3860
-
-
... More
Labour charges for Erection of various Multi tower parts etc as per drawing including sorting out at site , erection, tightening , punching , final checking, providing holes wherever necessary and final checking etc., complete including cost of all labour charges etc., complete.
1467
-
-
... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete.
405
-
-
... More
Labour charges for removal of Large tree
1500
-
-
... More
Labour charges for removal of Small tree
2500
-
-
... More
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
108300
-
-
... More
Labour charges for transporting and hoisting of 13 units of 90 KN insulators for Zebraand fixing of SS fittings for Zebrawith all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Zebra (insulators will be supplied by board)
504
-
-
... More
Labour charges for transporting and hoisting of 14 units of 120 KN insulators for Zebraand fixing of SS fittings for Zebrawith all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
1050
-
-
... More
Labour charges for transport of Zebra conductor paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. 6 Wire For Span
14
-
-
... More
12 Wire For Span
25
-
-
... More
12 Wire For Kms
8.8
-
-
... More
3 Wire For Span
7
-
-
... More
Installation & Stringing of 1 No ADSS cable 48 fibres for inter connecting OPGW cable with the terminal gantry at the substation including cost of HDPE pipe protection and all accessories as per standard specification and as directed by the engineer incharge.
2.5
-
-
... More
Labour charges for Erection of OPGW- 48 Fibre with accessories (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete
17.7
-
-
... More
Installation & stringing of 1No. 7/3.66 mm earth wire including fixing of hardware fittings and accessories etc., complete as per standard specification and as directed by the engineer incharge for the line (Stringing of earth wire is to be done using tension stringing equipment)
12
-
-
... More
Labour charges for fixing of number plates, danger board, phase plate including all cost of materials, abour transport, lead, lift, etc complete.
69
-
-
... More
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete.
69
-
-
... More
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete.
69
-
-
... More
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
50
-
-
... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete.
65
-
-
... More
Providing special trussels for Road crossing including cost of all materials, labour, lead lift etc. Complete.
25
-
-
... More
Providing Loop jumpers and removal of the same after commissioning of the 110 & 230 KV line including cost of all materials, labour lead llift T&P etc complete.
2
-
-
... More
Releasing and lowering and rehoisting of 14 units of 120 KN single tension insulator with fittings including all labour lead lifts, and T & P etc complete.
9
-
-
... More
Labour charges for Releasing and lowering of 3 Nos of Zebra conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For SpansLC Condition & Railway, NH crossing works
2
-
-
... More
Schedule C ( Survey works for Land Compensation ) Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details)
605000
-
-
... More
Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines.
605000
-
-
... More
Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File.
605000
-
-
... More
Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself.
605000
-
-
... More
Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas.
605000
-
-
... More
Print: Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets Colour print.
605000
-
-
... More
Marking of Village Topo-map: Marking radius of 400m, 800m, 1200m, 1600m from the centre oint of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India.
605000
-
-
... More
Collection of land sales value: Method 1 - Preparation of 10 sets of documents required for arriving land compensation including obtaining sales value from Registration Department for all survey numbers within 400m radius, 800m (R), 1200m (R) and 1600(R) for fixing the market value of lands for Survey numbers in Tower locations / Transmission Corridor, as per the guidelines of the Revenue Department.
605000
-
-
... More
Preparation of documents for fixing land value: Method 1 - Preparation of 10 sets of documents including annexures required for arriving land compensation based on sales value within 400m radius, 800m (R), 1200m (R) and 1600(R) received from Registration Department for all survey numbers for fixing the market value of lands for Survey numbers in Tower locations / Transmission Corridor, as per the guidelines of the Revenue Department.
605000
-
-
... More
Submitting documents to District Collector for approval: Submitting all the prepared documents including annexures required for arriving land compensation to District Collector for arriving land compensation and getting approval from the concerend District collector for all survey numbers for fixing the market value of lands for Survey numbers in Tower locations / Transmission Corridor and submitting the approvad proposal to the Division office.
605000
-
-
... More
SCHEDULE - D - RETRIVED MATERIAL Zebra Conductor
0.34
-
-
... More
GST @ 18%
1
-
-