Tamil Nadu Transmission Corporation Limited Tender

... More
The TANTRANSCO has issued a formal invitation for competitive bids for the Tamil Nadu Transmission Corporation Limited project, for Et/wc/ No 10/voc/2023-24 Dt30.09.2023 in Tiruvannamalai, Tamil Nadu. The bid opening date for this tender is 05-10-2023 and the last date for bid submission is 20-10-2023. Interested bidders for Tamil Nadu Transmission Corporation Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Opening Date5 Oct 2023
Closing Date20 Oct 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Et/wc/ No 10/voc/2023-24 Dt30.09.2023

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
ESI EPF GST ETCStructure Modification at existing Arani 230 KV SS using Micro concreting for damaged structure under PSDF DPR - II scheme at Arani 230/110 KV Sub Station
ESI EP GST etc for Structure Modification at existing Arani 230 KV SS using Micro concreting for damaged structure under PSDF DPR - II scheme at Arani 230/110 KV Sub Station
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
FORM WORK

-

-

-

... More
GST 18 % to be entered by the Biders

1

-

-

... More
SHEAR CONNECTOR

-

-

-

... More
PROVISION OF ADDITIONAL REINFORCEMENT

-

-

-

... More
Drilling 10mm dia holes up to a depth of 60mm maximum and fix 8mm dia L shaped anchor rods as shear connectors atwhere ever reqired on the surfaces of the slab or any other structural member as the case may be. Clean the same using water and make sure that there is no fine particle present in the hole.Mix the base and hardner of the polyester resin with the spatulathoroughly. Fill the drilled and cleaned holes to a minimum depth of 1/3rd of the hole with the preparedpolyester resin. Make sure that the resin has reached till the end of the hole. At this stage push the shear connector gently in to the hole and finish the excess resin which comes out of the hole and allow the shear connector to be undisturbed for minimum 20 minutes - complete.

2425

-

-

... More
Labour charges for chipping the spalled and old concrete of the slab. Check for the phenopthaline test and if there is no change in colour chip the same further down until, reaching the good or uncontaminated concrete. Clean the surface and make sure that surface is clean and free from loose particle at an average thickness of 50mm.

730

-

-

... More
Providing slurry tight form work including strutting, propping, etc., which should not deform or leak due to pressure of micro concrete shall be fabricated in position using 6mm thick commercial plywood as per the required line and length at all different floor levels as per the standard specification-complete. Form work should be rigid to prevent loss of micro concrete at all stages & appropriate to the methods of placing & compacting as per standard specification. It should be made of suitable material. The form work should be coated with shutter release agent prior to fixing. The rate shall include the cost of all the operations and etc.,

730

-

-

... More
MICROCONCRETE

-

-

-

... More
Micro Concreting for the damaged structural element like slab/beam/column by Stocking sufficient quantity of micro concrete and 12mm downgraded chips on site to enable the completion of the pouring in a continuous operation. An approved concrete mixer or a slow speed heavy duty drilling machine fitted with mixing paddle shall be used. Mix the micro concrete and the 12mm down grade chips in the ratio of 1: 0.5 (one part of Rendroc RG and 0.5 part 12mm down chip) by weight with required quantity of water powder ratio 0.16 and place the same to the prefixed formwork well before the epoxy jointing compound dries up. Remove the formwork after 24 hours in the case of columns and after a period of 72 hours in the case of slab and beam and check for any surface defects and if so apply the polymer modified mortar - complete. The rate shall include the cost of all the operations and complete.

18

-

-

... More
SURFACE PREPARATION

-

-

-

... More
All the areas which are under consideration for the repair & rehabilitation are to be provided with double legged scaffolding independent of the work having two sets of vertical supports. The supports shall be sound and strong, tied together with horizontal pieces over which scaffolding planks shall be fixed. Supply and fixing of scaffolding with bracing including cost of all material, all labour charges etc.,

1800

-

-

... More
Clean the rebars using the rust remover if there exists any rust, otherwise clean the rebar free of foreign material. Mix the base and hardner of the zinc rich epoxy resin mechanically using a slow speed heavy duty drilling machine fitted with mixing paddle. Apply the mixed materials to the cleaned rebar and allow it to dry complete.

95

-

-

... More
PRIMING OF REINFORCEMENT BARS

-

-

-

... More
Check the diameter of the existing rebar and if the diameter is less than 30% of the original diameter and provide additional reinforcement. Cut the required dia bars as main reinforcement to the required length with proper development length. Tie them to the prefixed shear connectors so that the additional rebar acts monolithic with the existing ones . In case of the shear reinforcement also, if the diameter of the reabrs are reduced, provide 8mm dia stirrups in the form of 2 "U" shaped. Tie them properly so that it has the tight contact with the main bars.

2180

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.