Tamil Nadu Transmission Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Civil And Construction
Eprocure
Opening Date23 Nov 2020
Closing Date1 Dec 2020
Tender AmountRefer Documents
Costs
EMD
₹ 40,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_EB_185821_2Bid Award Id
ViewTender No
59/2020-21 of SE GCC CBETender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work excavation for foundation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock not requiring blasting including all leads, lifts, etc., complete.
280
-
-
... More
Earth work excavation for foundation in hard rock by wegding, chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts, etc., complete.
140
-
-
... More
PCC 1 : 3 : 6 using 20mm metal without form work including cost of all materials, lead, lift, curing, etc., complete.
26
-
-
... More
Transporting of template and stubs, cleats for KCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead, lift, etc., complete.
9
-
-
... More
Transporting of template and stubs, cleat for HCR tower and assembling at site and shifting the template from loc to loc including cost of all materials, labour for fabrication, galvanising etc., lead, lift, etc., complete.
1
-
-
... More
PCC 1:2:4 using 20mm metal (machine crushed) with form work for tower Frustum concrete including cost of all materials, lead, lift, curing, etc., complete including cost of frustum box etc. (for Frustum)
247
-
-
... More
PCC 1:2:4 using 20mm metal metal (machine crushed) with form work for tower chimney concrete including cost of all materials, lead, lift, curing, etc., complete including cost of chimney box etc. (For Chimney)
12
-
-
... More
Providing pipe type earthing including necessary excavation for fixing 3m long 40m dia GI "B" class pipe and refilling with excavated earth mixed with salt charcoal and connect the earthstrip with the leg of the stub including all cost of all materials, lead, lift, etc., complete.
10
-
-
... More
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
1496
-
-
... More
Transporting of excess excavated earth and disposing them with a lead of 5 KM including all lead, lift, labour chrges, etc., complete.
1047
-
-
... More
Plastering the chiney coping portion in CM 1:3, 12mm thick including cost of all materils, lead, lift, curing, labour charges, etc., complete.
47
-
-
... More
Transporting & Erection of Tower Parts including Sorting out of Tower Parts at stores & at Site, tightening, rectification of tower parts if any at the time of erection, Punching of Bolt and nuts including transporting charges, Cost of T&P'S, all materials, labour, lead, lift, etc., complete. (Including Bolt & Nuts )
68
-
-
... More
Tack welding ( Three Tacks )of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour, transport charges, etc., complete.
8900
-
-
... More
Dewatering charges including rent of Pump rent of Generator, labour lead lift etc complete as per Standard Specification.
100
-
-
... More
Painting with anti corrosive black paint, two coats on the tower legs upto 1 mtr height from chimney coping including cost of all materials, lead, lift, etc., complete.
10
-
-
... More
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
1
-
-
... More
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
1
-
-
... More
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements