Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Works
Electrical and Electronics
Eprocure
Opening Date14 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 25,54,337 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Transport And Erection Of Towers, Stringing Of Panther Conductor And Earthwire For Erection Of 110 Kv Dc Line On Dc Tower By Making Lilo Of The Existing 110 Kv Thiruverambur-k.sathanur Feeder At The Proposed Mannarpuram 110/11kv Ss

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour charges for transporting and hoisting of 7 units of 90 KN disc insulators from department store with supply & fixing of suspension fitting for panther with all allied hard ware fittings including transport T & P including all cost of labour, lead, lift, T & P etc complete. with PA rod for panther.

24

-

-

... More
Labour charges for transporting and hoisting of 8 units of 120 KN disc insulators from department store with supply & fixing of Single tension fitting SB damper with all allied hard ware fittings including transport T & P including all cost of labour, lead, lift, T & P etc complete.

132

-

-

... More
Labour charges for stringing of 6 Nos. of ACSR Panther conductor including cost of loading & unloading transporting, sorting out of drums according to drum schedule providing trusseles, paying out, jointing, rough sagging, tensioning, clipping, Supply of hardware fitting providing vibration dambers at tension locations and all accessories including jumber connections, cost of T&P, moving the drum to work spot all labour, lead, lift, etc complete in all respects. (Single Span without LC)

10

-

-

... More
Labour charges for stringing of 6 Nos. of ACSR Panther conductor including cost of loading & unloading transporting, sorting out of drums according to drum schedule providing trusseles, paying out, jointing, rough sagging, tensioning, clipping, Supply of hardware fitting providing vibration dambers at tension locations and all accessories including jumber connections, cost of T&P, moving the drum to work spot all labour, lead, lift, etc complete in all respects. (Continuous Span without LC)

1.23

-

-

... More
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares (i.e. ST fittings, SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading, lead, lift, cost of T&P, etc complete. (Single Span without LC)

9

-

-

... More
Labour charges for transport of 7/3.55mm GI earthwire from Department store supply and fixing of GI earthwire hardwares (i.e.ST fittings, SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading, lead, lift, cost of T&P, etc complete. (Continuous Span without LC)

1.23

-

-

... More
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift etc complete.

5.5

-

-

... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete.

51

-

-

... More
Providing welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level 1 cm each side at two places opposite to each other after tightening and punching of bolt & nuts including painting the welded portion of bolt and nuts two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of welding rod, hire charges of diesal generator and welding transformer, paint and all T & P including cost of all materials, labour, lead, lift etc complete.

4698

-

-

... More
Painting with two coats of using best quality anticorrosive paint over tower leg at a height of 1.00 m above coping including cost of all materials, labour, lead, lift, etc complete in all respects.

16

-

-

... More
Labour charges for fixing of Number Plate, Danger Board, Phase plate set of three in tower as directed by the engineer at site including all cost of labour transport, lead, lift, etc complete.

48

-

-

... More
Supply, fabrication and fixing of name board with 18 gauge plate with one coat red oxide and two coat enamel paint for back ground lettering with enamel of approved colour fixing in tower as directed all materials labour,lead, lift, etc, complete for name board size approved by the engineer incharges of works.

5.5

-

-

... More
Labour charges for removal of Large trees

50

-

-

... More
Labour charges for removal of Small trees

80

-

-

... More
Providing temporary guys with steel wires and turn buckles including necessary excavation for fixing RSJ/rail bit or concrete blocks for anchorage dismantling after after completion of stringing works including cost of all materials, lead, lift, labour etc complete.

9

-

-

... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour, lead, lift etc complete.

10

-

-

... More
Providing special type trussels for P&T, road crossing during stringing work with casurina props so as to avoid accident and dameges to conductor and earth wire on both side of crossing including cost of all materials, labour, lead lift etc. Complete in all respects.

10

-

-

... More
Releasing and lowering of existing 6 Nos. Racoon conductor and devoluted to departmental store including all labour, lead, lift, T & P etc complete.

2.12

-

-

... More
Labour charges for dismantling of 1 No. Earthwire and devlouted to store including cost of all materials, labour, lead, lift etc complete.

2.12

-

-

... More
Labour charges for Dismantling the existing tower in complete member by member in complete shape to devlouted to store including cost of all materials, T&Ps, lead, lift ,etc.,

8.91

-

-

... More
Brickwork in CM 1:3 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" for wall, including cost of labour materials, curing, lead, water charges, lift, etc., complete.

10.5

-

-

... More
Lowering & dismantling of Suspension insulators (7 units of 90 KN insulator) with fitting and devlouted to store including cost of all major & minor T & P with all lead, lift etc complete.

30

-

-

... More
Lowering & dismantling of tension insulators (8 units of 120 KN insulator) with fitting and devlouted to store including cost of all major & minor T & P with all lead, lift etc complete.

30

-

-

... More
Clearing Juliflora jungle with up rooting including all cost of labour, lead, lift, etc complete.

9600

-

-

... More
Applicable GST 18%

18

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.