Tamil Nadu Transmission Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Civil And Construction
Eprocure
Opening Date15 Jul 2019
Closing Date24 Jul 2019
Tender AmountRefer Documents
Costs
EMD
₹ 2,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_EB_131951_1Bid Award Id
ViewTender No
GCC 023 GL 011 2019-2020Tender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
PCC1:2:4 using 20mm metal for foundation concrete with out form work including cost of all materials, lead, lift ,frustum box , etc complete .
4
-
-
PCC1:2:4 using 20mm metal for foundation concrete with steel form box including cost of all materials, lead, lift ,frustum box , etc complete .
4
-
-
PCC 1:2:4 using 20mm metal for chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete .
2
-
-
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. GCO tower
1
-
-
supply & Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
1
-
-
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
9
-
-
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete
6
-
-
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
29
-
-
Transport and labour charges of hot dip galvanized Tower parts, as per relevant IS spaecification and erection including Cost of materials, sorting out of tower parts, transport of tower parts rectification of defective member it any including providing correct holes and cutting of angle wherever necessary, patch painting tightening of bolts and nuts punching, lead lift, etc., including T & Ps. Any defect that are pointed out by operation wing of TANTRANSCO before taking over of line should be rectified by free of cost.
3
-
-
Labour charges for releasing the existing conductor,holding with clamp,cutting and restringing the conductor to the newly erected tower including tensioning to correct sag and tension clipping, providing vibration dampers, jumper and all accessories including , cost of all T& P , labour lead, lift, etc complete.( under LC condition).
2
-
-
Labour charges for releasing the existing earthwire,holding with clamp,cutting and restringing the earth wire to the newly erected tower including tensioning to correct sag and tension clipping, providing vibration dampers, jumper and all accessories including , cost of all T& P , labour lead, lift, etc complete. ( under LC condition).
2
-
-
Labour charges for hoisting 90 KN Disc insulator as per department specification &as pe the insructions of Engineer incharge including all cost of labour,lead, lift, etc complete.
6
-
-
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .
1
-
-
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete
6
-
-
Supply transport,Labour charges for fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete
2
-
-
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
1
-
-
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
1
-
-
Labour charges for removal of large trees
1
-
-
Labour charges for removal of Small tree
2
-
-
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
400
-
-
Clearing juliflora jungle with uprooting including all cost of labour, lead, lift etc complete.
1200
-
-