Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date29 Feb 2024
Closing Date15 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in MR & DMR requiring blasting inlcuding all cost of lead lift etc complete.

25

-

-

... More
Earthwork excavation in Hard rock mearured in solid including blasting & stacking inlcuding all cost of lead lift etc complete.

9

-

-

... More
Transporting and fixing of stub and cleat with supply of template and assembling at site and shifting the template from loc to loc including cost of template labour, fabrication charges etc complete.(KCO tower with or with out extension) .

1

-

-

... More
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges,labour, fuel, oil, transport etc complete.

3

-

-

... More
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.

54

-

-

... More
PCC1:3:6 using 20mm metal for foundationfor tower concrete with out form work including cost of all materials, lead, lift , etc complete .

11

-

-

... More
PCC1:2:4 using 20mm metal for foundation for tower concrete with form work including cost of all materials, lead, lift , etc complete .

15

-

-

... More
Refilling with the excavated earth other than sand including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete. KCO tower

139

-

-

... More
supply & Providing earthing as per approved specification and as directed by the site engineer including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.

1

-

-

... More
Removal of surplus earth whereever necessary including transport up to 2KM away from the site ,loading & unloading etc complete.

26

-

-

... More
Labour & Transport and erection of GI tower parts including in accordance with boards design as per drawing & tightening punching of bolt & nuts transport charges to each location ,final checking cost of T &P,labour, lead, lift etc complete . ( Under LC)

14

-

-

... More
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .

1

-

-

... More
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete

6

-

-

... More
Painting with two coats of using best quality anticorrosive paint over tower leg at a height of 1.00m above coping including cost of all materials,labour, lead lift etc complete in all respects.

1

-

-

... More
Providing welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level 1 cm each side at two places opposite to each other after tightening and punching of bolt & nuts including painting the welded portion of bolt and nuts two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost ofwelding rod ,hire charges of diesal generator and welding transformer, paint and all T & P including cost of all materials labour,lead, lift etc complete.

900

-

-

... More
Labour charges for transporting and hoisting of 7 units of 90 KN disc insulators from department store with supply & fixing of suspension fitting for panther with all allied hard ware fittings including transport T & P including all cost of labour, lead, lift, T & P etc complete without PA rod for panther

3

-

-

... More
Labour charges for transporting and hoisting of 7 units of 90 KN disc insulators from department store with supply & fixing of suspension fitting for panther with all allied hard ware fittings including transport T & P including all cost of labour,lead, lift, T & P etc complete with PA rod for panther

6

-

-

... More
Labour charges for transporting and hoisting of 8units of 120 KN disc insulators from department store with supply & fixing of Single tension fitting SB damper with all allied hard ware fittings including transport T & P including all cost of labour,lead, lift, T & P etc complete

30

-

-

... More
Labour charges for stringing of 6 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles, paying out, jointing, rough sagging, tensioning, clipping, Supply of hardware fitting providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P, moving the drum to work spot all labour, lead, lift, etc complete in all respects. (under LC)

2

-

-

... More
Releasing, lowering and restringing of existing OPGW 48fiber with all acessories including jumber connection transport charges, loading,unloading ,lead, lift, cost of T&P, etc complete. (under LC)

0.32

-

-

... More
supply & transport & Labour charges for fixing of Number Plate , Danger Board ,Phase plate set of three in tower as directed by the engineer at site including all cost of labour transport, lead, lift, etc complete.

9

-

-

... More
Supply,fabrication and fixing of name board with 18 gauge plate with one coat red oxide and two coat enamel paint for back ground lettering with enamel of approved colour fixing in tower as directed all materials labour,lead, lift, etc, complete .for name board size approved by the engineer incharges of works.

1

-

-

... More
Providing temporary guys with steel wires and turn buckles including necessary excavation for fixing RSJ/rail bit or concrete blocks for anchorage dismantling after after completion of stringing works including cost of all materials, lead, lift, labour etc complete.

2

-

-

... More
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete

3

-

-

... More
Labour charges for removal of Small trees

5

-

-

... More
Clearing Juliflora jungle including all cost of labour, lead, lift etc complete.

240

-

-

... More
Providing special type trussels forP&T,road crossing during stringing work with casurina props so as to avoid accident and dameges to conductor and earth wire on both side of crossing including cost of all materials,labour, lead lift etc. Complete in all respects.

4

-

-

... More
Labour charges for Dismantling of existing 6 wire leopard conductor and devlouted to store including cost of all materials,T &Ps lead, lift ,etc., complete. (under LC )

2

-

-

... More
Relasing & lowering and restringing of existing 6 wire leopard conductor including cost of all materials, T &Ps lead, lift ,etc., complete. (under LC )

1

-

-

... More
Lowering & dismantling of tension insulators (8 units) with fitting and devlouted to store including cost of all major & minor T & P with all lead,lift etc complete. (Under LC)

24

-

-

... More
Labour charges for Dismantling the existing tower in complete member by member to devlouted to store including cost of all materials, T &Ps lead, lift ,etc., complete including cost of all materials, T &Ps lead, lift etc., complete. (under LC)

10

-

-

... More
Releasing & lowering and rehoisting of 7 units of single suspension insulators with fittings including all cost of labour,lead, lift, T & P etc complete.

6

-

-

... More
Releasing & lowering and rehoisting of 8 units of single suspension insulators with fittings including all cost of labour,lead, lift, T & P etc complete .

6

-

-

... More
Applicable GST 18%

18

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.