Tamil Nadu Transmission Corporation Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Civil Works Others
Eprocure
Opening Date6 Jul 2019
Closing Date24 Jul 2019
Tender AmountRefer Documents
Costs
EMD
₹ 7,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_EB_131176_1Bid Award Id
ViewTender No
06/SE/O/SPR/2019-20Tender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work excavation in hard rock requiring blasting and depositing on bank with initial lead of 10m and lift of 2m etc.
8.1
-
-
... More
Sand filling including cost of sand, filling charges, labour for watering and consolidation leads and lift etc. complete.
5.81
-
-
... More
Plain Cement Concrete 1:3:6 using 40mm HBG stone for foundation including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site .
2.91
-
-
... More
R:C:C 1:1.5:3 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete as per standard specification as directed by the dept. Engineer at site
7.71
-
-
... More
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete as per standard specification as directed by the dept. Engineer at site (excluding cost of steel reinforcement)
9.49
-
-
... More
Plain Cement Concrete 1:2:4 using 20mm HBG stone without form work including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site excluding cost of steel reinforcement.
19.94
-
-
... More
Plain Cement Concrete 1:2:4 using 20mm HBG stone with form work including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site excluding cost of steel reinforcement.
9.46
-
-
... More
Plastering in CM 1:3 12 mm thick including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site
104.13
-
-
... More
Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site
1.38
-
-
... More
Supplying and filling with well gravel including cost of all materials leads, left, labour etc., complete
3.75
-
-
... More
Supplying and filling with quarry dust including cost of all materials leads, left, labour etc., complete
1.88
-
-
... More
Supplying and filling with 12-20 mm metal including cost of all materials leads, left, labour etc., complete
1.88
-
-
... More
Fabricating of M.S. angles including cost of all materials, labour charges for cutting, welding and placing in position transport charges from work shop to site painting with enamel paint over a cost of priver as directed by the Engineer at site,
97.44
-
-
... More
Colour washing two coats using Cement paint over one coat of white washing including cost of all materials, colour pigments labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site
105
-
-
... More
Labour charges for assembling of template in correct position and alignment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as directed by the dept. Engineer at site.
23
-
-
... More
supply of hot dip galvanizing Bolt & Nuts of size 20 mm dia with minimum 100mm long bend and thread 100mm including 2 nos. GI nuts and washers and fixing in position as directed by the Engineer at site including all materials, labour, lead, lift etc. complete.
94
-
-
... More
supply of hot dip galvanizing Bolt & Nuts of size 25 mm dia with minimum 100mm long bend and thread 100mm including 2 nos. GI nuts and washers and fixing in position as directed by the Engineer at site including all materials, labour, lead, lift etc. complete.
12
-
-
... More
supply and laying of PVC pipe of size 40mm dia with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, labour, lead, lift etc. complete.
20
-
-
... More
supply and laying of PVC pipe of size 32mm dia with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, labour, lead, lift etc. complete.
25
-
-
... More
supply and laying of PVC pipe of size 25mm dia with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, labour, lead, lift etc. complete.
25
-
-
... More
supply and fixing of gunmetal gate valve of size 32 mm dia as directed by the Engineer at site including all materials, labour, lead, lift etc. complete.
2
-
-
... More
supply and fixing of gunmetal gate valve of size 25 mm dia as directed by the Engineer at site including all materials, labour, lead, lift etc. complete.
3
-
-
... More
Labour charges for back filling with excavated earth and spreading the surplus earth including cost of all materials transport, labour, lead, lift etc., complete as directed by the dept. Engineer at site.
53.36
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements