Tamil Nadu Transmission Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Civil Works Roads
Eprocure
Opening Date8 Feb 2021
Closing Date20 Feb 2021
Tender AmountRefer Documents
Costs
EMD
₹ 40,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_EB_194618_1Bid Award Id
ViewTender No
109/2020-21 of SE GCC CBETender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
HGS SS.20.B. Earth work excavation for foundation and depositing on bank in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and as per standard specification complete.
379
-
-
... More
SDR - (Not Requiring Blasting) Earth work excavation for foundation and depositing on bank in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting and as per standard specification.
138
-
-
... More
MR and DMR - Earth work excavation for foundation and depositing on bank in Medium Rock and Dense Medium Rock not requiring blasting as per standard Specification .
44
-
-
... More
Earth work excavation for foundation in Removing Hard Rock by wedging, chiseling and trimming to proper shape and stocking for measurement, as per standard specification complete.
44
-
-
... More
Plain cement concrete in CC 1:3:6 mix using 40 mm HB metal for tower foundation concrete without formwork including cost of cement and all materials, labour, curing, lead, lift, etc., as per standard specification complete.
44
-
-
... More
Plain cement concrete in CC 1:3:6 mix using 40 mm HB metal for tower foundation concrete with steel formwork including cost of cement and all materials, labour, curing, lead, lift, steel shuttering etc., as per standard specification complete.
51
-
-
... More
Plain cement concrete in CC 1:3:6 mix using 20 mm HB metal for Chimney concrete with steel formwork including cost of cement and all materials, labour, curing, lead, lift, steel shuttering, Vibration charges etc., as per standard specification complete.
7
-
-
... More
Reinforced cement concrete in C.C. 1:1 1/2:3 mix using 20 mm HBG machine crushed metal without form work including cost of all materials, labour, curing, all leads and lifts, vibrating charges as per Standard Specification complete. ( But excluding cost of steel reinforcement)
42
-
-
... More
Plain cement concrete in CC 1:2:4 mix using 20 mm HB metal with steel formwork including cost of cement and all materials, labour, curing, lead, lift, steel shuttering, vibration charges etc., complete as per standard specification.
223
-
-
... More
Providing steel reinforcement Mild Steel / TMT rods (minimum Fe 450 Grade) for all RCC works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per approved drawing, placing aligning, and tying properly with all labour, leads and lift as per standard specification, etc., complete
3360
-
-
... More
Labour charges of setting of stub and cleat of (using template / modern technique) HCO Tower with correct level and alignment as per approved drawing and hire charges of template, with all labour, lead, lift, etc., as per Standard specification complete. (Stub and cleat will be supplied by TANTRANSCO)
1
-
-
... More
Labour charges of setting of stub and cleat of (using template / modern technique) KCO Tower with correct level and alignment as per approved drawing and hire charges of template, with all labour, lead, lift, etc., as per Standard specification complete. (Stub and cleat will be supplied by TANTRANSCO)
2
-
-
... More
Supplying and fixing of pipe type earthing including necessary excavation for fixing of 3 M long 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the GI earth strips with the legs of the stub including cost of pipe refilling charges, fixing charges transport lead, lift, labour, etc., as per standard specification complete.
3
-
-
... More
Plastering with CM 1:3, 12mm thick for coping including cost of all materials, lead, lift, curing etc as per standard specification complete.
46
-
-
... More
Supplying and filling of Gravel brought from outside and well consolidated in each layer of not more than 15 cm thickness consolidated complying with standard specification including cost of filling, transporting charges, Consolidation etc. as per Instruction of TANTRANSCO's Engineer incharge complete.
25
-
-
... More
Providing anchor rod / Grip rod of 20mm dia RTS (Not less than Fe 450 Grade) to a length of 2m by drilling 32mm dia hole to a depth of 1.00 metre into hard rock and grouting with Bonding materials as directed by the TANTRANSCO Engineer at site including cost of all materials, labour, lead, lift , curing , etc., complete.
10
-
-
... More
Supplying, laying and fixing of 75mm dia. PVC pipe 4Kg / cm2 to proper alignment and slope for weep hole of retaining wall including cost of pipe, lead, lift, labour as per the Instruction of TANTRANSCO Engineer incharge at site complete
30
-
-
... More
Dewatering using 3hp diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump Operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
8
-
-
... More
Refilling the tower location using excavted earth other than sand inside the tower foundation and retaining wall in 150mm layers well consolidation watering etc. as per specification and making plat form around tower legs including all labour, lead, lift, etc., as per Instruction of TANTRANSCO Engineer at site complete.
347
-
-
... More
Disposal of Excess of surplus earth away in low lying area with a lead of 2km distance including spreading and levelling charges all labour, lead, lift as per Instruction of TANTRANSCO Engineer at site complete.
256
-
-
... More
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
1
-
-
... More
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
1
-
-
... More
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements