Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Civil And Construction
Eprocure
Opening Date17 Jul 2018
Closing Date31 Jul 2018
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Tender for Providing foundation concrete for structure.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removal of HR by wedging and chiselling

41

-

-

... More
Supplying and filling of river sand in foundation and basement with well water and consolidation as per specn.incliding cost of all materials labour, lead, lift, etc., complete.

29

-

-

... More
PCC 1:4:8 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, lead, lift, curing, etc., complete.

29

-

-

... More
PCC 1:3:6, using 20mm HBG metal foundation without form work including cost of cement, all materials, labour, lead, lift, etc. complete.

102

-

-

... More
PCC 1:2:4, using 20mm HBG metal foundation without form work including cost of cement, all materials, labour, lead, lift, etc. complete.

95

-

-

... More
PCC 1:3:6, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.

126

-

-

... More
PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.

11

-

-

... More
Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift, etc. complete.

621

-

-

... More
Colour washing two coats with approved qulity of colour pigments over one coat of white cement including cost of all materials , labour lead and lift etc complete.

376

-

-

... More
RCC 1:1/2:3 using 12- 20mm HBG metal for foundation with out form work including cost of all materials, form work including cost of all materials, labour, lead, lift, etc. complete.(But excluding cost of steel reinforcement)

51

-

-

... More
RCC 1:1/2:3 using 12- 20mm HBG metal for foundation with form work including cost of all materials, form work including cost of all materials, labour, lead, lift, etc. complete.(But excluding cost of steel reinforcement)

30

-

-

... More
RCC 1:1.5:3 using12- 20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab for baffle wall concrete.

7

-

-

... More
supply,fabrication and placing reinforcements of RTS rods in position as per drawing for all RCC works including cost of all materials, binding wire, labour for bending, tying, placing in position, lead, lift, etc. complete.

6800

-

-

... More
Supply ,Labour charges for fabrication, fixing in position of MS rail with proper anchorage by using welding and cutting to the required size and length anf fixing over transformer plinth as per departmental specifications including cost of labour, transport, placing in position, lead,lift etc complete.

540

-

-

... More
Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete.

321

-

-

... More
Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete.

55

-

-

... More
Supply & Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete

700

-

-

... More
Supply and spreading of quarry dust inside the yard as per std. spec.including cost of materials ,labour lead,lift etc

218

-

-

... More
Supply and apreading of 20mm of HB stone inside the yard as per std. spec.including cost of materials ,labour lead,lift etc

110

-

-

... More
Providing PVC pipe using 110mm dia 4 Kg / sqcm, PVC pipe and pvc clamp line supreme etc, including fixing PVC washer type door bend & shoe, in correct position including cost of all materials, labour, transport lead, lift, etc., complete, including PVC accessories and washers.

62

-

-

... More
Supplying and fixing readymade earth collars of size 60 cm inner dia with 30 cm height and shell thickness of 50 mm with cover slab including cost of all materials, transport to site, labour, lead, lift, etc., complete as per standard specification.

5

-

-

... More
Benching hard rock at site up to an average depth of 10 cm including cost of all materials lead,lift,labour etc complete as per the direction of site engineer.

200

-

-

... More
clearing juliflora jungles with uprooting and disposed from the site as per the direction of site engineer including cost of all labour, lead, lift, etc., complete

8250

-

-

... More
Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete

360

-

-

... More
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For culvert deck slab concrete with 230mm thick.

33

-

-

... More
Collection, supplying, stacking and spreading of hill earth with compacted by power roller including cost of all materials lead lift labour etc complete as per the direction of site engineer.

880

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.