Tamil Nadu Transmission Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender
Electrical and Electronics
Eprocure
Opening Date21 Aug 2024
Closing Date19 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 3,56,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Strengthening Of Existing 110 Kv Pudhanchandai - Rasipuram Sc Line On Sc Tower With Leopard Conductor Into 110 Kv Sc Line On Dc Tower With Panther Conductor Between Location Nos. 04 To 59.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_475624_1Bid Award Id
ViewTender No
TP1-15/2024-25 OF CE/TP-I/CNITender Authority
Tamil Nadu Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In soft distengrated rock not requiring blasting
247
-
-
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In medium rock and dense medium rock not requiring blasting
247
-
-
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring blasting
124
-
-
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring Wedging and chesiling
124
-
-
Fixing of templates, stub and cleat for GCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
43
-
-
Fixing of templates, stub and cleat for HCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
9
-
-
Fixing of templates, stub and cleat for KCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
3
-
-
PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P,labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials, adhering to the BOCW act 1996 and rules 2006 without any compromise etc complete.
47
-
-
PCC 1:2:4 using 20 mm HB Stone for tower foundation and chimney with steel form work for frustum shaped foundation including cost of cement of approved brand including all materials labour etc., complete,labour, lead, curing , steel formwork charges, consolidation, hire charges for T&P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials, adhering to the BOCW act 1996 and rules 2006 without any compromise etc complete.
369
-
-
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For GCR (Dry) type tower.
16
-
-
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For GCR (Wet) type tower.
27
-
-
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For HCR (Wet) type tower.
9
-
-
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For KCR (Wet) type tower.
3
-
-
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
55
-
-
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport,T&P etc., complete.
49
-
-
Transport and erection of towers including sorting out of tower members, tightening punching the bolts and nuts whereever necessary, patch painting, cutting of angles wherever necessary, minor fabrication workss, final checking, cost of T & P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials,adhering to the BOCW act 1996 and rules 2006 without any compromise all leads and lifts etc., complete.
195
-
-
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
144
-
-
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of ST fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
81
-
-
Labour charges for transporting and hoisting of 2 X 9 units of 120 KN insulators for Panther and fixing of DT fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
6
-
-
Labour charges for transport of 3 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. Under LC condition
15.31
-
-
Labour charges for transport of 3 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. Under LC condition, for NH crossing.
1
-
-
Labour charges for stringing of OPGW cable including paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour , clipping the cable joints and cost of T&P etc complete. Under LC condition
15.48
-
-
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete .
13
-
-
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete
156
-
-
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
30
-
-
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
57
-
-
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
12
-
-
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete
100
-
-
Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete
300
-
-
Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete
200
-
-
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
29520
-
-
Providing trussels for minor road crossing including cost of all materials,labour, lead lift etc. Complete.
31
-
-
Labour charges for supply and fixing of 12 Nos. PG clamp for panther for providing loop inbetween existig 110 KV LILO line during L.C. condition for all the phase including all cost of labour,lead, lift, T & P etc complete if necessary and removal of loop jumper after completion of work as per the instruction of site engineer.
1
-
-
Labour charges for dismantling of existing GI tower angles including cost of materials,T & P,labour, lead, lift etc complete. as per approved drawing and specification
106.13
-
-
Labour charges for Releasing of 7 units of 90 KN insulators with SS fittings for leopard including cost of all labour,lead, lift, T & P etc complete.
165
-
-
Labour charges for releasing of 8 units of 120 KN insulators and fixing of ST fittings for leopard S.B damper with all allied hardwares including all cost of labour,lead, lift, T & P etc complete.
63
-
-
Labour charges for Releasing of 3 Nos of leopard conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. Under LC condition
15.6
-
-
Labour charges for Releasing of OPGW cable including jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour, clipping the cable joints and cost of T&P etc complete. Under LC condition
15.6
-
-
Transport charges for devolution of Leopard conductor, OPGW Cable and 90 KN & 120 KN disc insulator to departmental store including Tansportation charges from site to store, labour, lead lift etc., complete.
11.28
-
-
Providing Special type earthing arrangements for Teriminal tower including necessary excavation for fixing 3m long 100mm dia CI class pipe, 60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect with the leg of the stub with 50x10mm MS flat and providing GI barbed wire as per the instruction of site engineer including all cost of materials lead lift etc complete.
1
-
-
Supply, transport and fixing of Single Tension fittings for panther as per design drawing and specifications.
81
-
-
Supply, transport and fixing of Double Tension fittings for panther as per design drawing and specifications.
6
-
-
Supply, transport and fixing of SB damber for panther as per design drawing and specifications.
87
-
-
Supply, transport and fixing of Single Suspension fittings for Panther as per design drawing and specifications.
144
-
-
Supply, transport and fixing of preformed armoured rods for panther as per design drawing and specifications.
133
-
-
Supply, transport and fixing of ST fittings for EW 7/3.55mm as per design drawing and specifications
4
-
-
Supply, transport and fixing of Bird Guard as per design drawing and specifications
140
-
-
Supply, transport and fixing of Mid span joint for Panther as per design drawing and specifications
50
-
-
Supply, transport and fixing of Repair sleeve for Panther as per design drawing and specifications
50
-
-
Supply, transporting and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
57
-
-
Supply, transporting and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
57
-
-
Supply, transporting and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
57
-
-
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
195
-
-
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
9
-
-
Dismantling of MS Tower parts in AS IS WHERE IS Condition clearing from the site on cost to paid to TANTRANSCO,including the cost of loading,unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.25000)
106.13
-
-
Dismantling of ACSR Leopard conductor in AS IS WHERE IS Condition clearing from the site on cost to paid to TANTRANSCO,including the cost of loading,unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.95000)
22.92
-
-
Dismantling of OPGW Cable in AS IS WHERE IS Condition clearing from the site on cost to paid to TANTRANSCO,including the cost of loading, unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.18000)
10.22
-
-
GST for bidders within TamilNadu
-
-
-
SGST
1
-
-
CGST
1
-
-
GST for bidders outside TamilNadu (IGST)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements