Tamil Nadu Transmission Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Transmission Corporation Limited - TANTRANSCO Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date4 Sep 2024
Closing Date20 Sep 2024
Tender Amount₹ 19,15,893 
estimatedThis is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Providing Stub Setting, Concreting, Erection Of Towers And Stringing Of Panther Conductor For Increasing The Ground Clearance Of The Existing Elavanthi 110kv Lilo Line Between Loc. No.14 And 15 To Provide Adequate Vertical Clearance For The Proposed

Description

lockUnlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

lockUnlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Promotion Banner

BOQ Items

... More
DO_NOT_SHOW

-

-

-

lockView all details for FREE
... More
Labour charges for dismantling the existing tower parts, including hire charges for major & minor T&Ps,Transport & develotion to store with all labour, lead and lift etc., complete

13.89

-

-

... More
Clearing of juli flora jungle disposing off to a place at-least 1km away from the site as directed by the Engineer in charge including all Labour charges, Lead, Lift, T&Ps etc., complete.

1600

-

-

... More
Check Survey and pit marking of various tower location inlcuding hire charges for theodolite instrument, cost of all materials labour, lead, lift etc complete.

1

-

-

... More
Earth work excavation for foundation in hard gavel soil, shift black cotton soil, murram, gravel, stoney,earth and earth mixed with small size boulders with hard gravelly soil including initial lead of 10 m and lift of 2 m etc., complete.

15

-

-

... More
Earth work Excavation and depositing on bank with initial lead of 10 metre and lift of 2 metre in soft disintegrated rock, laterite soft rock or kankar not requiring blasting including all leads, lifts etc., as per standard specification complete.

30

-

-

... More
Earth work Excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock not requiring blasting including all leads, lifts etc., as per standard specification complete

73

-

-

... More
Earth work Excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in Hard rock requiring control blasting including all leads, lifts etc., as per standard specification complete

15

-

-

... More
Earth work Excavation for tower foundation in Hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts etc., as per standard specification complete.

15

-

-

... More
PCC 1:4:8 using 40mm metal for foundation with out form work including cost of all materials lead lift curing etc complete.

3

-

-

... More
PCC 1:2:4 using 20mm metal (machine crushed) with form work for frustum footing concrete including cost of all materials lead lift curing etc complete including cost of footing box etc.

26.11

-

-

... More
PCC 1:2:4 using 20mm metal (machine crushed) with form work for chimney including cost of all materials lead lift curing etc complete including cost of Chimney box , footing box etc.

35

-

-

... More
Supplying and Setting of stub and cleat for KCR type tower assemble to correct level and allignment including providing of Template shifting from location to location and reassempling same including cost of all materials lead lift labour etc complete

1

-

-

... More
Refilling with excavated earth other than sand including watering consolidation in 150mm thick layer and forming platform around tower legs with excess earth etc., complete.

115.51

-

-

... More
Transporting of excess excavated earth away from site within a lead of 100 m including all labours, lead, lift etc., complete.

30.49

-

-

... More
Providing pipe type earthing including necessary exca-vation for fixing 3M long of 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the earth strips with the legs of the stub including cost of pipe refilling earth, fixing charges transport lead, lift, labour,etc., complete.

1

-

-

... More
Plastering the Chimney portion upto 0.45 m with CM 1:3, 12mm thick including all cost of shuttering charges lead lift curing labour materials etc complete

4.6

-

-

... More
Supplying, transporting and Erection of towers with bolt nut, tightening and punching of bolts & nuts and final checking including all lead lift etc., complete. including charges for rectification of tower parts if any including Tools & Plants all labour, lead, lift, etc., complete.

9

-

-

... More
Tack welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials hire charges for diesel generator and welding transformer all labour transport charges etc complete.

865

-

-

... More
Transport and hoisting of 120 KN antifoc/Ord single tension insulators of 8 units including all cost of labour lead lift T & P etc complete.

12

-

-

... More
Transporting and Hoisting of 8 units of Double tension insulators for providing road Crossing location using DT fitting with fittings transporting from stores to site including cost of all all major and minarT&P, labour, lead, lift, etc

12

-

-

... More
Transport of 6 Nos. of Panther conductor, paving out, jointing, rough sagging, tensioning, clipping, providing vibration dambers for tension locations including giving jumber connection for power conductor including transport charges, loading unloading lead lift etc complete.

2

-

-

... More
Restringing of Released existing 1 Nos of OPGW including cost of all major and minor T&P with all Leads,Lifts, etc. Complete.r including cost of all major and minor T&P with all Leads,Lifts, etc. Complete.(under LC Condition)

2

-

-

... More
Painting with anticorrosive black paint, two coats on the tower legs upto 1 mtr height from chimney coping including all cost of materials lead lift etc complete.

4

-

-

... More
Supplying and fixing of Name board of size 0.750 x 0.450mm using 18 gauge MS sheet with 25x25x3mm MS angle frame painting with approved enamel painting two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labours, lead, lift, etc., complete as per standard specification.

1

-

-

... More
Labour charges for fixing of Number plate, wherever necessary including all lead, lift, etc., complete

1

-

-

... More
Labour charges for fixing of Danger boardand phase plate wherever necessary including all lead, lift, etc., complete

1

-

-

... More
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only

1

-

-

... More
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only

1

-

-

... More
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only

1

-

-



Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.