Tamil Nadu Generation And Distribution Corporation Limited Tender

... More
The TANGEDCO has issued a formal invitation for competitive bids for the Tamil Nadu Generation And Distribution Corporation Limited project, for Mtps I Chp I Replacement Of Existing Heavily Damaged Worn Out Drive Bed Frame Structures With Bed Foundation In Wagon Tippler I in Salem, Tamil Nadu. The bid opening date for this tender is 30-01-2025 and the last date for bid submission is 13-02-2025. Interested bidders for Tamil Nadu Generation And Distribution Corporation Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Opening Date30 Jan 2025
Closing Date13 Feb 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
MTPS I CHP I Replacement of existing heavily damaged worn out drive bed frame structures with bed foundation in Wagon Tippler I
Price Bid in BOQ format
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Charges for removal and refixing of final pinion shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor

1

-

-

... More
Charges for consumables such as cotton waste, Anti corrosive paint etc, and T&P's spanner set hammers, sprit level etc, Sl.No. 1 to 10

1

-

-

... More
Charges for supporting the structure in front and rear side of Wagon Tippler at drive and non drive end frames by using ISMB 450 X 150 mm, 350 x 140mm, 200 X 100mm channels, angles and packing of wooden sleepers to avoid swing of tippler platform and making stability and safety arrangements and after attending all works, dismantling of supporting arrangements after completion of work.

1

-

-

... More
Charges for supply of MS plate 20 mm thick

0.91

-

-

... More
Supply of MS Welding Electrode for Sl.No.7

30

-

-

... More
Charges for removal of top cover, bottom cover, single piece pillow block, cleaning of split spur wheel, and removal of split spur wheel from the drive shaft by splitting the two halves of the split spur wheel and lifting them to the Wagon Tippler floor from main shaft drive pit.

1

-

-

... More
Charges for fabrication of new bed frame assembly as per existing bed frame size for Wagon Tippler main drive shaft, intermediate shaft and final pinion shaft by using 20mm thick MS plates cutting, marking, edge grinding, setting & welding & drilling of bottom & top plate of bed frame.

6

-

-

... More
Charges for mounting / reerect of split spur wheel in the drive shaft and checking the operation of the Wagon Tippler after completion of all works.

1

-

-

... More
Charges for supply of M30 foundation bolt with 2 nuts & washers

24

-

-

... More
ii) 25 NB ball valve 1 no. (Leader make gun metal valve)

-

-

-

... More
Charges for removal of drive shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor.

1

-

-

... More
Charges for re-erect the intermediate shaft after positioning drive shaft, final pinion shaft and refixing the coupling, (other end) plummer blocks and rack segment – 4 Nos. and related assemblies, greasing and tightening all plummer blocks top and bottom halves, fixing bolts and tightening all rigid coupling bolts after putting HSFG bolts.

1

-

-

... More
Charges for alignment of the Wagon Tippler such as (1) Pinion and split spur wheel (2) Rack and pinion (3) Pawl and pawl lever arrangement (4) pivot shafts alignment with pedestal for operation of Wagon tippler and trail run etc.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.