Tamil Nadu Generation And Distribution Corporation Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Eprocure
Opening Date5 Sep 2023
Closing Date18 Sep 2023
Tender Amount₹ 23,71,523 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_EB_366974_1Bid Award Id
ViewTender No
WC024/2023-24 Dt.01.09.2023Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation of pole pit up to 9.14 Mtr pole
150
-
-
... More
Hard rock without Blasting
50
-
-
... More
Erection of Poles
-
-
-
... More
RCC poles/Metal pole up to 8.00m (27’)
250
-
-
... More
RCC poles/Metal pole up to 9.14.m(30’)
150
-
-
... More
Erection of stay set complete
150
-
-
... More
Fixing of line materials
-
-
-
... More
HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2
200
-
-
... More
LT 3 Phase cross arm
200
-
-
... More
LT single Phase cross arm
120
-
-
... More
HT /LT TI Fitting
120
-
-
... More
Fixing of HT Pin Insulators (11/22KV)
200
-
-
... More
Fixing of HT 11KV stain disc
150
-
-
... More
Fixing of LT Pin Insulators
200
-
-
... More
Fixing of LT Shackle
150
-
-
... More
Fixing of knob
150
-
-
... More
Labour charges for alteration of Back Clamps / Stay Clamps to suit for the works
150
-
-
... More
Earthing of Poles
100
-
-
... More
Paving and Stringing of conductor
-
-
-
... More
ACSR 7/4.09 mm Raccoon conductor
3
-
-
... More
7/3.35mm ACSR 7/3.15mmAAAC(per wire per span)
6
-
-
... More
7/2.59mm ACSR & 7/2.50mm AAAC(per wire per span)
8
-
-
... More
Structure Erection
-
-
-
... More
Erection of Transformer structure complete in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel,belting angle Including Concreting ( Except erection of transformer)
7
-
-
... More
Erection of Single Pole Structure
5
-
-
... More
Erection of D.P Structure with AB Switch , top channel , cross bracing , erathing , painting, providing stay including concreting .
3
-
-
... More
Transporting of poles
-
-
-
... More
Transport of Poles/Materials /Conductors and other Materials ( Excluding loading and unloading charges ) Below 8 Kms (Planins )
120
-
-
... More
Above 8 kms . For additional km
120
-
-
... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100 m
400
-
-
... More
Loading & Un loading of poles
-
-
-
... More
Loading of poles upto 27"
250
-
-
... More
Loading of poles upto 30"
100
-
-
... More
Loading of Metal poles (All sizes)
50
-
-
... More
Un Loading of poles upto 27"
250
-
-
... More
Un Loading of poles upto 30"
100
-
-
... More
UnLoading of Metal poles (All sizes)
50
-
-
... More
Service Connections
-
-
-
... More
Releasing of Single Phase service wire and refixing
250
-
-
... More
Releasing of Three Phase service wire and refixing
150
-
-
... More
Releasing of 3 phase Service and (above 50 HP) re-fixing
50
-
-
... More
Agricultural Service Fixing
50
-
-
... More
Erection of street light including Fixure fitting
50
-
-
... More
Erection of Street light Service
10
-
-
... More
Dismantling of Line Materials
-
-
-
... More
Dismantling of pole (9.0m and above)
75
-
-
... More
Dismantling of pole (7.5mtr & 8mtr)
100
-
-
... More
Dismantling of pole from pole pit (9.0m and above)
75
-
-
... More
Dismantling of pole from pole pit (7.5mtr & 8mtr)
100
-
-
... More
Dismantling of HT Pin Insulator
200
-
-
... More
Dismantling of HT TI Fitting
75
-
-
... More
Dismantling of11 KV disc
200
-
-
... More
Dismantling of 3 PH X arm
150
-
-
... More
Dismantling of Tapping X arm, V X arm & Guarding X arm
200
-
-
... More
Dismantling of 1 PH X arm
150
-
-
... More
Dismantling of Alu Knob
150
-
-
... More
Dismantling of LT pin Insulator
400
-
-
... More
Dismantling of LT Shackle Insulator
300
-
-
... More
Stay set complete Dismantling
50
-
-
... More
Dismantling of 7/3.35 mm ACSR conductor
5
-
-
... More
Dismantling of 7/2.59 & 7/2.11 mmACSR conductor
5
-
-
... More
Loading or unloading of Transformer above 100 and upto 200 KVA
5
-
-
... More
Loading or unloading of Transformer above 200 KVA
5
-
-
... More
Erection of New Transformer all Capacities (with Jumpering )
5
-
-
... More
Replacement of failed transformers all Capacities
5
-
-
... More
Re-stringing of ACSR 7/3.35 mm
3
-
-
... More
Re-stringing of ACSR 7/2.59 mm
3
-
-
... More
Dismantling of street light including Fixure fitting
50
-
-
... More
Dismantling of street light SC Box
10
-
-
... More
Tree cutting
200
-
-
... More
Releasing of grills from RCC Poles
50
-
-
... More
Concreting of Poles
-
-
-
... More
Mass Conreting including Materials (Cement + River Sand / M. Sand and Blue Metals and Watering )
30
-
-
... More
Sleeve Concreting including Materials (Cement + River Sand / M. Sand and Blue Metals and Watering )
50
-
-
... More
Stat Concreting including cost of Materials and Labour 375 mm x 375 mm x 50 mm
25
-
-
... More
Painting
-
-
-
... More
Painting of Metal poles including cross arms (Excluding cost of paint)
200
-
-
... More
Numbering of pole with paint and with base painting
100
-
-
... More
Painting of RCC/PSC poles (Colour washing )
100
-
-
... More
Painting of Transformer (Deuble coat)
100
-
-
... More
Painting of HT Metering set and Box
50
-
-
... More
Lathe works
-
-
-
... More
Drilling of hole in channel only 3/4'' & 1''
300
-
-
... More
Cutting of channel
250
-
-
... More
Cutting of RSJ Pole
25
-
-
... More
Miscellaneous works
-
-
-
... More
Providing LT bus bar arrangement in distn. Trs. Structure loc
25
-
-
... More
Erection of New 10' Earth pipe replacing the corroded earth pipe and renewal of erthing including burying looping and binding.
35
-
-
... More
G.S.T. @18% should be Entered by the Bidder
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements