Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Manpower Supply
Eprocure
Opening Date7 Jul 2023
Closing Date19 Jul 2023
Tender AmountRefer Documents
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_EB_338092_1Bid Award Id
ViewTender No
OT-15/2023-24Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Loading and Unloading of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
1
-
-
... More
Transporting of 9.14 m poles from Road side to pole pit
1
-
-
... More
Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
1
-
-
... More
Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., in complete.
1
-
-
... More
Excavation of stay pit 0.95x0.60x1.5m
1
-
-
... More
Erection of Stay Set Complete
1
-
-
... More
Sleeve concrete for stay set including all materials & cement
1
-
-
... More
Erection of HG fuse set with transport
1
-
-
... More
Erection of 11 KV AB switch complete set with transport
1
-
-
... More
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete with trough / w.o. trough
1
-
-
... More
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure
1
-
-
... More
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for TP Structure
1
-
-
... More
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for Four Pole Structure
1
-
-
... More
Erection of L.T. Open type fuse unit including cable jumpering upto the line.
1
-
-
... More
Providing LT bus bar arrangements in DT structure including fixing of cross arm and insulator.
1
-
-
... More
Erection of H.T. jumpering in DP structure complete (150 * 3)
1
-
-
... More
Erection of H.T. LAS (3 Nos)
1
-
-
... More
Erection of L.T. LAS (4 Nos)
1
-
-
... More
Erection of DT excluing loading and unloading using Crane - 63KVA/100KVA
1
-
-
... More
Erection of DT excluing loading and unloading using Crane - Above 100 KVA
1
-
-
... More
Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. Without Material
1
-
-
... More
Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. - With Material
1
-
-
... More
Painting of Structure pole with Distemper including cost of material
1
-
-
... More
Loading and unloading of Distribution Transformer at site and store. (All Rating)
1
-
-
... More
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Upto 100 KVA
1
-
-
... More
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Above 100 KVA
1
-
-
... More
Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles
1
-
-
... More
Dismantling of Stay set complete
1
-
-
... More
LABOUR CHARGES FOR LAYING OF HT CABLE
-
-
-
... More
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road
1
-
-
... More
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road
1
-
-
... More
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road
1
-
-
... More
Loading and unloading of HT Cable including coiling and recoiling
1
-
-
... More
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
1
-
-
... More
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km
1
-
-
... More
Laying of 11KV 3 X 300 sq mm XLPE cable
1
-
-
... More
Laying of 11KV 3 X 120 sq mm XLPE cable
1
-
-
... More
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough
1
-
-
... More
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
1
-
-
... More
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km
1
-
-
... More
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km
1
-
-
... More
LABOUR CHARGES FOR LAYING OF LT CABLE
-
-
-
... More
Loading and unloading of LT Cable including coiling and recoiling
1
-
-
... More
Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
1
-
-
... More
Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle above 5 Km
1
-
-
... More
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. - Normal Road
1
-
-
... More
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Tar Road
1
-
-
... More
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Concrete Road
1
-
-
... More
Laying of LT 4 x 240 sq.mm cable
1
-
-
... More
Laying of LT 4 X 120 sq.mm cable
1
-
-
... More
Laying of LT 4 X 25 sq.mm cable
1
-
-
... More
Laying of LT 2 X 16 sq.mm cable
1
-
-
... More
Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.
1
-
-
... More
LABOUR CHARGES FOR ERECTION OF PILLAR BOX
-
-
-
... More
Erection of 4 / 6 Way pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc.,
1
-
-
... More
Erection of Mini pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc.,
1
-
-
... More
Raising of 4 / 6 Way Pillar Box
1
-
-
... More
Raising of Mini Pillar Box
1
-
-
... More
Welding, Painting and Earthing of 4 /6 Way Pillar Box
1
-
-
... More
Removing and refixing of LT cables in 4 /6 Way Pillar boxes
1
-
-
... More
Cleaning, painting with Aluminium paint 2 coats & Numbering pillar box with feeder details. (Estimate sanction mandatory) including cost of all materials - 4 / 6 Way Pillar Box
1
-
-
... More
Cleaning, painting with Aluminium paint 2 coats & Numbering pillar box with feeder details. (Estimate sanction mandatory) including cost of all materials - Mini Pillar Box
1
-
-
... More
LABOUR CHARGES FOR DISMANTLING OF PILLAR BOX
-
-
-
... More
Dismantling of old 4 / 6 / 8 Way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
1
-
-
... More
Dismantling of old Mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
1
-
-
... More
LABOUR CHARGES FOR MISCELLANEOUS WORK
-
-
-
... More
Erection of cross bracing set 10' / 15' Structure - DP Structure
1
-
-
... More
Erection of cross bracing set 10' / 15' Structure - TP Structure
1
-
-
... More
Erection of Top Channels 10' / 15' Structure - DP Structure
1
-
-
... More
Erection of Top Channels 10' / 15' Structure - TP Structure
1
-
-
... More
Erection of 33 KV centre rotating AB switch complete set
1
-
-
... More
Erection of 11 KV centre rotating AB switch complete set
1
-
-
... More
Loading of Metering Set
1
-
-
... More
Un loading of Metering Set
1
-
-
... More
Erection of Metering Sets - Up to 11KV metering set
1
-
-
... More
Erection of Metering Sets - Above 11KV metering set
1
-
-
... More
Manufacturing of MS clamps at works spot as per requirement , including alteration by using 50 x 8 mm Flat (with material)
1
-
-
... More
Manufacturing of MS clamps at works spot as per requirement , including alteration by using 65 x 10 mm Flat (with material)
1
-
-
... More
Cutting of Channel/Flat/Angle
1
-
-
... More
Cutting of RSJ pole
1
-
-
... More
Drilling of 5/8", 3/8", 1/" Holes in Channels / Angles - Slot Holes
1
-
-
... More
Drilling of 5/8", 3/8", 1/" Holes in Channels / Angles - Round Holes
1
-
-
... More
Fixing of Missing doors in MS Mini Pillar Box
1
-
-
... More
Fixing of Missing doors in MS 4 Way Pillar Box
1
-
-
... More
Fixing of Missing doors in MS 6 Way Pillar Box
1
-
-
... More
Fixing of Missing doors in MS 8 Way Pillar Box
1
-
-
... More
Fixing of Missing doors in FRP Pillar Box
1
-
-
... More
Provision of 2 Nos Hinges in all types of Pillar Box
1
-
-
... More
LABOUR CHARGES FOR ERECTION OF SINGLE POLE STRUCTURE
-
-
-
... More
Loading and Unloading of 9.0m Square Pole
1
-
-
... More
Excavation of Pole Pit
1
-
-
... More
Erection of 9.0m Square Pole
1
-
-
... More
Transporting of Square Pole from Road Side to Pole Pit
1
-
-
... More
Excavation of stay pit 0.95x0.60x1.5m
1
-
-
... More
Erection of Stay Set Complete
1
-
-
... More
Fixing of Single Pole Structure Material in complete shape
1
-
-
... More
Erection of 16 / 25 / 40 KVA Distribution Transformer
1
-
-
... More
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete with trough / w.o. trough
1
-
-
... More
Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
1
-
-
... More
Sleeve concrete for stay set including all materials
1
-
-
... More
Erection of HT LAS (3 Nos)
1
-
-
... More
Erection of LT LAS (4 Nos)
1
-
-
... More
Erection of LT Wiring Kit (Double Open Type Circuit)
1
-
-
... More
Painting of single pole structure including iron materials double coat with materials
1
-
-
... More
Painting of single pole structure including iron materials double coat without materials
1
-
-
... More
Painting of Structure pole with Distemper including cost of material
1
-
-
... More
Laying of HT Cable through Trenchless Technology
-
-
-
... More
Laying of HT UG cable using Trenchless Method with Pipes(0-100m)
1
-
-
... More
Laying of HT UG cable using Trenchless Method with Pipes(101-200m)
1
-
-
... More
Laying of HT UG cable using Trenchless Method with Pipes(above 200m)
1
-
-
... More
Laying of HT UG cable using Trenchless Method without Pipes(0-100m)
1
-
-
... More
Laying of HT UG cable using Trenchless Method without Pipes(101-200m)
1
-
-
... More
Laying of HT UG cable using Trenchless Method without Pipes(above 200m)
1
-
-
... More
GST
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements