Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date23 Dec 2024
Closing Date8 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 12,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_513473_1Tender No
SE/VREDC/AEE/MM/ET no 56, Dt 20.12.2024Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Loading&Unloading of RS Joists, tubular & rail poles (above 9.14m)
10
-
-
... More
Transporting of poles from road side to Work spot7.32m, 7.5m, 8m, 8.23m RCC poles/km
70
-
-
... More
Transporting of poles from road side to Work spot9m, 9.14m RCC poles, RS Joists, tubular & rail pole/km
80
-
-
... More
Excavation of pole pit (1.25m * 0.5m*1.5m)in Normal Ground
70
-
-
... More
Erection
70
-
-
... More
Excavation of pole pit (1.25m * 0.5m*1.5m) in Rocky Ground
80
-
-
... More
Erection
80
-
-
... More
Excavation of pole pit (1.25m * 0.6m*1.83m) in Normal Ground
80
-
-
... More
Erection
80
-
-
... More
Excavation of pole pit (1.25m * 0.6m*2.19m) in Normal Ground
10
-
-
... More
Erection
10
-
-
... More
Concreting of poles as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor except Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete.
80
-
-
... More
Coping of poles
10
-
-
... More
Coil earthing per pole & pole earthing
60
-
-
... More
Excavation of stay pit (1.00m * 0.5m*1.5m)
120
-
-
... More
Erection
120
-
-
... More
V cross arm, Channel cross Arm4 1/2'
5
-
-
... More
V cross arm, Channel cross Arm3 1/2'
80
-
-
... More
LT Three phase cross arm
90
-
-
... More
LT single phase cross arm
120
-
-
... More
HT / LT TI fitting
100
-
-
... More
Tapping channel cross arm
60
-
-
... More
Erection of HT Side arm with stud
10
-
-
... More
Erection of LT Side arm with stud
15
-
-
... More
g.Guarding Cross Arm
10
-
-
... More
For 7/4.09 ACSR (per span/wire)
150
-
-
... More
For 7/3.35 ACSR or 7/3.15 AAAC
180
-
-
... More
For 7/2.59 ACSR or 7/2.50 AAAC
200
-
-
... More
Resagging of LT & HT. line of all sizes
100
-
-
... More
Spilt Neutral Guarding
10
-
-
... More
Flat Guarding (2 wires)
5
-
-
... More
Flat Guarding (4 wires)
5
-
-
... More
Fixing of one earthing device
10
-
-
... More
Upto 150 KVA
8
-
-
... More
250 KVA
2
-
-
... More
Erection of centre support for 250 KVA DT (Including concrete)
2
-
-
... More
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
10
-
-
... More
Bus bar arrangement with open type
10
-
-
... More
Loading and Unloading of distribution transformer Below 250 KVA
8
-
-
... More
Loading and Unloading of distribution transformer 250 KVA
2
-
-
... More
Loading & Unloading of all sizes of DT using private Crane vehicle
10
-
-
... More
i)Loading /Un loading of Metering Set
2
-
-
... More
ii)Erection / dismantling of Metering Set
3
-
-
... More
LT Changing of pin point to cut point
10
-
-
... More
HT Changing of pin point to cut point
10
-
-
... More
Single Phase service connection
55
-
-
... More
Three Phase service connection
30
-
-
... More
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
20
-
-
... More
Dismantling of poles without concrete in damaged condition including grill separation etc.,
25
-
-
... More
7.5Mtr /8Mtr PSC & Pole
20
-
-
... More
9.14Mtr RCC Pole and above
15
-
-
... More
Dismantling of stay with guy shackle complete
10
-
-
... More
Replacement of detoriated stay rod
30
-
-
... More
Dismantling of 3.5' V cross arm and channel cross arm
15
-
-
... More
Dismantling of 4.5' and 5' V cross arm
10
-
-
... More
Dismantling of TI Fitting
15
-
-
... More
Dismantling of Single phase/ 3 phase cross arm
30
-
-
... More
complete replacement of worn out earth wire per structure
10
-
-
... More
For ordinary trees and thorn bushes and trees
30
-
-
... More
For coconut and Palm trees
25
-
-
... More
Pole (Colour washing with emulsion on Labour only) (Double coat)
15
-
-
... More
Transformer structure (Double coat)
15
-
-
... More
For transformer only (Double coat)
15
-
-
... More
Set right of leaning of HT pole / LT pole including X arms, TI fittings
10
-
-
... More
Excavation of structure pole pits 2Nos
2
-
-
... More
Erection of structure poles 2Nos
2
-
-
... More
Transformer structure pole mass concrete (All materials including cement (Ratio 1:2:4) and coping
2
-
-
... More
Top channel
2
-
-
... More
Transformer seating channel and belting angle
2
-
-
... More
AB switch (complete)
2
-
-
... More
HG Fuse (complete)
2
-
-
... More
Jumpering
2
-
-
... More
HT LAS
2
-
-
... More
LT LAS
2
-
-
... More
Fixing of capacitor bank in Distribution Transformer with wiring irrespective of capacitor
2
-
-
... More
Excavation of 3 Nos. earth pits
6
-
-
... More
Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
6
-
-
... More
Mason works for earth pits including material
6
-
-
... More
Spreading yard jelly and cut stone and bricks including materials
2
-
-
... More
9 mtr long RCC Pole (Square Section) complete
8
-
-
... More
Maintenance of A/B switch
65
-
-
... More
Maintenance of Single Pole Distribution Transformer and Structure complete
20
-
-
... More
Replacement of GI wire in LT cut points replaced with Lt metal parts
15
-
-
... More
Replacement of worn out AB Switch knife, checking of alignment and lubrication
5
-
-
... More
a)Attending H.T jumper cut
10
-
-
... More
b)Attending L.T jumper cut
5
-
-
... More
a)Replacement of H.T Disc
50
-
-
... More
b)Replacement of HT Pin insulator
200
-
-
... More
a) Replacement of L.T shackle with metal parts
20
-
-
... More
b) Replacement of L.T pin insulator
10
-
-
... More
Maintenance of DP Structure complete
15
-
-
... More
ப jumper provision ( including of service wire disconnection & reconnection)
50
-
-
... More
Set right of Tilted X arm
40
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements