Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Automobiles and Auto Parts
Eprocure
Opening Date20 Apr 2023
Closing Date15 May 2023
Tender Amount₹ 1,52,152 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
TTPS ES Circle EM III Arresting oil leak in the LV bushing and improve the BDV of transformer oil in 1.6MVA AHP II service transformer A of unit IV and V
TTPS ES Circle EM III Arresting oil leak in the LV bushing and improve the BDV of transformer oil in 1.6MVA AHP II service transformer A of unit IV and V
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Releasing the Buchholz relay, conservator tank,vent,pipe,oil & winding temperature gauges, Disconnection of winding CT terminals.

1

-

-

... More
Charges for leading and shifting of power transformer without oil from AHP-II service Transformer - A location to Unit-V repair bay.(5 Ton X 330Mtr=1650 Ton/Mtr)

1650

-

-

... More
Removing the top cover of the transformer and Disconnecting the HV/LV leads from Bushings and lifting the core and winding.

1

-

-

... More
Complete cleaning of the Tap switch and attending defects if any during testing

1

-

-

... More
Cleaning, servicing and gasket replacement to Buchholz relay, MOG, oil level gauge glass, explosion vent pipe, conservator tank, silicagel & replacement of diaphram.

1

-

-

... More
Dismantling of HV & LV Bushings, cleaning, checking the bushing rods, replacing the deteriorated O rings & gaskets by new, assembling and fixing in the transformer tank.

1

-

-

... More
Repositioning of the core & winding assembly in Transformer tank and reconnecting the HV/LV leads.

1

-

-

... More
Providing New Gasket at top cover and fixing the top cover.

1

-

-

... More
Fixing the radiator cooling fins, valves, conservator tank, Buchhloz relay, explosion vent pipe, WTI,OTI, winding CT bushings, breather pipe & breather in complete shape by replacing all deteriorated gaskets by new one.

1

-

-

... More
Leading the oil filter machine from its shed to transformer location and extending power supply, transport back to its shed after completion of hot oil circulation.

1

-

-

... More
Filling up the transformer with new transformer oil through oil filter machine.

1

-

-

... More
Charges for leading and shifting of AHP-II service Transformer - A with oil ( 6 Ton X 330Mtr= 1980 Ton/Mtr)

1980

-

-

... More
Hot oil circulation till the IR value of the transformer winding & breakdown value of the oil reaches the required level and attending to the connected & related works.

1

-

-

... More
Connecting HV Power cables, fixing terminal box & earth flats.

1

-

-

... More
Connecting LV Power cables & terminal box / LV Bus duct terminals and fixing terminal box and assisting in testing the transformer.

1

-

-

... More
Supply of new Rubberized Cork Screw Gasket Sheet of various sizes for replacement in AHP-II service Transformer-A. (1mtr x 1mtr x10mm)

1

-

-

... More
Transformer winding Temperature Indicator (Range - 30 to 150°C)

1

-

-

... More
Transformer Oil Temperature Indicator (Range - 0 to 150°C)

1

-

-

... More
Silica Gel Breather

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.