Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date19 Aug 2024
Closing Date3 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rocky ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles

-

-

-

... More
Normal Ground Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles

-

-

-

... More
Normal Ground Erection of 9m, 9.14m Poles

-

-

-

... More
Normal Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"

-

-

-

... More
Normal Ground of erection of 36" RSJ pole

-

-

-

... More
Rocky Ground of Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles

-

-

-

... More
Rocky Ground of Erection of 9m, 9.14m Poles

-

-

-

... More
Rocky Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"

-

-

-

... More
Rocky Ground of erection of 36" RSJ pole

-

-

-

... More
Transporting of poles from road side to pole pit -7.32m, 7.5m, 8m, 8.23m Poles

-

-

-

... More
Transporting of poles from road side to pole pit -9m,9.14m RCC/PSC pole

-

-

-

... More
Transporting of poles from road side to pole pit -36" RSJ pole

-

-

-

... More
Loading and Unloading of Poles-7.32m, 7.5m, 8m, 8.23m Poles

-

-

-

... More
Loading and Unloading of Poles-9m,9.14m RCC/PSC pole

-

-

-

... More
Loading Unloading of poles-36" RSJ pole

-

-

-

... More
Loading Unloading of line materials

-

-

-

... More
Concreting of pole as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.compleat.

-

-

-

... More
Coping of pole (0.6m*0.6m*0.35m)

-

-

-

... More
Concreting of stay (0.3m * 0.3m * 1.5m) including materials except cement.

-

-

-

... More
Coil earthing per pole & pole earthing

-

-

-

... More
Normal Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for Stay Set)

-

-

-

... More
Normal Ground -Erection of Stay Set

-

-

-

... More
Rocky Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For Stay Set)

-

-

-

... More
Rocky Ground -Erection of Stay Set

-

-

-

... More
Fixing of V & Channel Cross Arm 3.5' including transporting of materials from road side to site

-

-

-

... More
Fixing of V & Channel Cross Arm 4.5' including transporting of materials from road side to site

-

-

-

... More
Fixing of 3 phase Cross Arm including transporting of materials from road side to site

-

-

-

... More
Fixing of 1 phase Cross Arm including transporting of materials from road side to site

-

-

-

... More
Fixing of HT LT TI Fitting including transporting of materials from road side to site

-

-

-

... More
Erection of HT side arm with stud including transporting of materials from road side to site

-

-

-

... More
Erection of LT side arm with stud including transporting of materials from road side to site

-

-

-

... More
Fixing of insulator (per location) including transporting of materials from road side to site

-

-

-

... More
Fixing of Tapping Channel X Arm

-

-

-

... More
Fixing of 11 KV Strain Disc

-

-

-

... More
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)

-

-

-

... More
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)

-

-

-

... More
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/4.09 ACSR (1 Span/wire)

-

-

-

... More
For HT line clear works for 7/2.59 ACSR (1 Span/wire)

-

-

-

... More
For HT line clear works for 7/3.35 ACSR (1 Span/wire)

-

-

-

... More
For HT line clear works for 7/4.09ACSR (1 Span/wire)

-

-

-

... More
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)

-

-

-

... More
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)

-

-

-

... More
For LT line clear works for 7/2.59 ACSR (1 Span/wire)

-

-

-

... More
For LT line clear works for 7/3.35 ACSR (1 Span/wire)

-

-

-

... More
Spilt Neutral Guarding

-

-

-

... More
Flat Guarding

-

-

-

... More
Erection of Transformer /Dismantling upto 200 KVA

-

-

-

... More
Erection of Transformer/Dismantling 250 KVA

-

-

-

... More
Erection of feeder cable with open type fuse unit per feeder

-

-

-

... More
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder

-

-

-

... More
Erection of feeder cable Bus bar arrangement with open type

-

-

-

... More
Erection of DT metering

-

-

-

... More
Loading of Distribution transformer below 250KVA

-

-

-

... More
Unloading of Distribution transformer below 250KVA

-

-

-

... More
Loading of Distribution transformer 250KVA

-

-

-

... More
Unloading of Distribution transformer below 250KVA

-

-

-

... More
Erection of centre Support ( incl. Concrete)

-

-

-

... More
Dismantling of Center support

-

-

-

... More
Alteration of clamps

-

-

-

... More
Drilling less than 23 mm holes per hole/slatted hole

-

-

-

... More
Cutting of channel

-

-

-

... More
Cutting of Flat

-

-

-

... More
Cutting of Angle

-

-

-

... More
RSJ Pole Cutting

-

-

-

... More
LT-Changing of pin point to cut point

-

-

-

... More
HT-Changing of pin point to cut point

-

-

-

... More
Erection of service connection materials -Single phase

-

-

-

... More
Erection of service connection materials -Three Phase

-

-

-

... More
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,

-

-

-

... More
Dismantling of poles without concrete in damaged condition including grill separation etc.,

-

-

-

... More
Providing jumpering at cut point

-

-

-

... More
Tree clearance in HT or LT location For ordy. Tree clearance and Throng bushes & trees Each Labour /Head/Day

-

-

-

... More
Tree clearance in HT or LT location For coconut Trees and palmrah tree each Labour /Head/Day

-

-

-

... More
Set right of leaning of HT pole or LT pole including X arms, TI fittings

-

-

-

... More
Resagging of Conductor 7/2.59

-

-

-

... More
Resagging of Conductor 7/3.35

-

-

-

... More
Resagging of Conductor 7/4.09

-

-

-

... More
Erection of Tapping Structure ( Double pole) complete as per TNEB standard including painting

-

-

-

... More
Erection of Distribution Transformer double pole Structure complete as per TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer

-

-

-

... More
Erection of of 11 KV Single pole Structure including erection of DT complete as per TNEB TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer

-

-

-

... More
Erection of Guarding X arm

-

-

-

... More
Dismantling of Stay Set complete including stay rod

-

-

-

... More
Dismantling of Stay set complete Without Stay rod

-

-

-

... More
Dismantling of conductor of 7/2.59 including transporting the conductors to the nearset road side and stocking in coils

-

-

-

... More
Dismantling of conductor of 7/3.35 including transporting the conductors to the nearset road side and stocking in coils

-

-

-

... More
Dismantling of conductor of 7/4.09 including transporting the conductors to the nearset road side and stocking in coils

-

-

-

... More
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side

-

-

-

... More
Dismantling of V Cross arm

-

-

-

... More
Dismantling of 3 Phase X Cross Arm

-

-

-

... More
Dismantling of Single phase X Cross

-

-

-

... More
Dismantling of HT/LT TI Fitting

-

-

-

... More
Dismantling of HT pin insulators

-

-

-

... More
Dismantling of LT pin Insulators

-

-

-

... More
Dismantling of strain Disc

-

-

-

... More
Dismantling of Tapping/Guarding channel X Arm

-

-

-

... More
Hiring of JCB

-

-

-

... More
Hiring of crane

-

-

-

... More
Exceeding 1 hour for every Hour

-

-

-

... More
Transporting of charges of DT/line materials using private vehicle upto 20 KM(up and Down)

-

-

-

... More
Beyond 20 KM for every KM

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.