Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date19 Aug 2024
Closing Date3 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 3,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_474569_1Tender No
EE/D/Kdnlr/ETW-009/2024-25Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Rocky ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles
-
-
-
Normal Ground Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
-
-
-
Normal Ground Erection of 9m, 9.14m Poles
-
-
-
Normal Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"
-
-
-
Normal Ground of erection of 36" RSJ pole
-
-
-
Rocky Ground of Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
-
-
-
Rocky Ground of Erection of 9m, 9.14m Poles
-
-
-
Rocky Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"
-
-
-
Rocky Ground of erection of 36" RSJ pole
-
-
-
Transporting of poles from road side to pole pit -7.32m, 7.5m, 8m, 8.23m Poles
-
-
-
Transporting of poles from road side to pole pit -9m,9.14m RCC/PSC pole
-
-
-
Transporting of poles from road side to pole pit -36" RSJ pole
-
-
-
Loading and Unloading of Poles-7.32m, 7.5m, 8m, 8.23m Poles
-
-
-
Loading and Unloading of Poles-9m,9.14m RCC/PSC pole
-
-
-
Loading Unloading of poles-36" RSJ pole
-
-
-
Loading Unloading of line materials
-
-
-
Concreting of pole as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.compleat.
-
-
-
Coping of pole (0.6m*0.6m*0.35m)
-
-
-
Concreting of stay (0.3m * 0.3m * 1.5m) including materials except cement.
-
-
-
Coil earthing per pole & pole earthing
-
-
-
Normal Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for Stay Set)
-
-
-
Normal Ground -Erection of Stay Set
-
-
-
Rocky Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For Stay Set)
-
-
-
Rocky Ground -Erection of Stay Set
-
-
-
Fixing of V & Channel Cross Arm 3.5' including transporting of materials from road side to site
-
-
-
Fixing of V & Channel Cross Arm 4.5' including transporting of materials from road side to site
-
-
-
Fixing of 3 phase Cross Arm including transporting of materials from road side to site
-
-
-
Fixing of 1 phase Cross Arm including transporting of materials from road side to site
-
-
-
Fixing of HT LT TI Fitting including transporting of materials from road side to site
-
-
-
Erection of HT side arm with stud including transporting of materials from road side to site
-
-
-
Erection of LT side arm with stud including transporting of materials from road side to site
-
-
-
Fixing of insulator (per location) including transporting of materials from road side to site
-
-
-
Fixing of Tapping Channel X Arm
-
-
-
Fixing of 11 KV Strain Disc
-
-
-
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)
-
-
-
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)
-
-
-
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/4.09 ACSR (1 Span/wire)
-
-
-
For HT line clear works for 7/2.59 ACSR (1 Span/wire)
-
-
-
For HT line clear works for 7/3.35 ACSR (1 Span/wire)
-
-
-
For HT line clear works for 7/4.09ACSR (1 Span/wire)
-
-
-
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)
-
-
-
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)
-
-
-
For LT line clear works for 7/2.59 ACSR (1 Span/wire)
-
-
-
For LT line clear works for 7/3.35 ACSR (1 Span/wire)
-
-
-
Spilt Neutral Guarding
-
-
-
Flat Guarding
-
-
-
Erection of Transformer /Dismantling upto 200 KVA
-
-
-
Erection of Transformer/Dismantling 250 KVA
-
-
-
Erection of feeder cable with open type fuse unit per feeder
-
-
-
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
-
-
-
Erection of feeder cable Bus bar arrangement with open type
-
-
-
Erection of DT metering
-
-
-
Loading of Distribution transformer below 250KVA
-
-
-
Unloading of Distribution transformer below 250KVA
-
-
-
Loading of Distribution transformer 250KVA
-
-
-
Unloading of Distribution transformer below 250KVA
-
-
-
Erection of centre Support ( incl. Concrete)
-
-
-
Dismantling of Center support
-
-
-
Alteration of clamps
-
-
-
Drilling less than 23 mm holes per hole/slatted hole
-
-
-
Cutting of channel
-
-
-
Cutting of Flat
-
-
-
Cutting of Angle
-
-
-
RSJ Pole Cutting
-
-
-
LT-Changing of pin point to cut point
-
-
-
HT-Changing of pin point to cut point
-
-
-
Erection of service connection materials -Single phase
-
-
-
Erection of service connection materials -Three Phase
-
-
-
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
-
-
-
Dismantling of poles without concrete in damaged condition including grill separation etc.,
-
-
-
Providing jumpering at cut point
-
-
-
Tree clearance in HT or LT location For ordy. Tree clearance and Throng bushes & trees Each Labour /Head/Day
-
-
-
Tree clearance in HT or LT location For coconut Trees and palmrah tree each Labour /Head/Day
-
-
-
Set right of leaning of HT pole or LT pole including X arms, TI fittings
-
-
-
Resagging of Conductor 7/2.59
-
-
-
Resagging of Conductor 7/3.35
-
-
-
Resagging of Conductor 7/4.09
-
-
-
Erection of Tapping Structure ( Double pole) complete as per TNEB standard including painting
-
-
-
Erection of Distribution Transformer double pole Structure complete as per TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer
-
-
-
Erection of of 11 KV Single pole Structure including erection of DT complete as per TNEB TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer
-
-
-
Erection of Guarding X arm
-
-
-
Dismantling of Stay Set complete including stay rod
-
-
-
Dismantling of Stay set complete Without Stay rod
-
-
-
Dismantling of conductor of 7/2.59 including transporting the conductors to the nearset road side and stocking in coils
-
-
-
Dismantling of conductor of 7/3.35 including transporting the conductors to the nearset road side and stocking in coils
-
-
-
Dismantling of conductor of 7/4.09 including transporting the conductors to the nearset road side and stocking in coils
-
-
-
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
-
-
-
Dismantling of V Cross arm
-
-
-
Dismantling of 3 Phase X Cross Arm
-
-
-
Dismantling of Single phase X Cross
-
-
-
Dismantling of HT/LT TI Fitting
-
-
-
Dismantling of HT pin insulators
-
-
-
Dismantling of LT pin Insulators
-
-
-
Dismantling of strain Disc
-
-
-
Dismantling of Tapping/Guarding channel X Arm
-
-
-
Hiring of JCB
-
-
-
Hiring of crane
-
-
-
Exceeding 1 hour for every Hour
-
-
-
Transporting of charges of DT/line materials using private vehicle upto 20 KM(up and Down)
-
-
-
Beyond 20 KM for every KM
-
-
-