Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date24 Jul 2024
Closing Date6 Aug 2024
Tender Amount₹ 3,00,000
Costs
EMD
₹ 3,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_465781_1Bid Award Id
ViewTender No
EE/D/SNKL/E-W006/24-25Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
1
-
-
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
1
-
-
Normal ground- Erection of 9M & 9.14M poles
1
-
-
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
1
-
-
Rocky ground- Erection of 9M & 9.14M poles
1
-
-
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
1
-
-
Normal ground- Erection of above 9.14M poles & 36' length RS Joists
1
-
-
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists
1
-
-
Rocky ground- Erection of above 9.14M poles & 36' length RS Joists
1
-
-
Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole
1
-
-
Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole
1
-
-
Transporting of poles from road side to pole pit - RSJ 36' Pole
1
-
-
Transporting of poles from road side to pole pit - RSJ 42' and above
1
-
-
Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole
1
-
-
Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole
1
-
-
Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)
1
-
-
Concreting of poles as per Board Standards (2'*2'*5'). The material
such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.)
1
-
-
Coping of pole (0.6m*0.6m*0.35m)
1
-
-
Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement
1
-
-
Coil earthing per pole & pole earthing
1
-
-
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
1
-
-
Normal ground- Erection of stay set
1
-
-
Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
1
-
-
Rocky ground- Erection of stay set
1
-
-
Loading charges of cement
1
-
-
Unloading charges of cement
1
-
-
Stacking charges
1
-
-
Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site
1
-
-
Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site
1
-
-
Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
1
-
-
Fixing of LT 3Phase cross arm including transporting of materials from road side to site
1
-
-
Fixing of LT 1Phase cross arm including transporting of materials from road side to site
1
-
-
Fixing of HT LT TI fitting including transporting of materials from road side to site
1
-
-
Erection of HT Side arm with stud including transporting of materials from road side to site
1
-
-
Erection of LT Side arm with stud including transporting of materials from road side to site
1
-
-
Fixing of insulator (per location) including transporting of materials from road side to site
1
-
-
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)
1
-
-
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire)
1
-
-
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire)
1
-
-
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For Dog Conductor (1Span/Wire)
1
-
-
For HT line clear works for For 7/2.59 ACSR (1Span/Wire)
1
-
-
For HT line clear works for For 7/3.35 ACSR (1Span/Wire)
1
-
-
For HT line clear works for For 7/4.09 ACSR (1Span/Wire)
1
-
-
For HT line clear works for ForDog conductor (1Span/Wire)
1
-
-
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR
1
-
-
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR
1
-
-
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/4.09 ACSR
1
-
-
For LT line clear works for For 7/2.59 ACSR (1Span/Wire)
1
-
-
For LT line clear works for For 7/3.35 ACSR (1Span/Wire)
1
-
-
For LT line clear works for For 7/4.09 ACSR (1Span/Wire)
1
-
-
Guarding per span length- Spilt Neutral Guarding
1
-
-
Guarding per span length- Flat Guarding (2 wires)
1
-
-
Guarding per span length- Flat Guarding (4 wires)
1
-
-
Guarding per span length- Flat Guarding (6 wires)
1
-
-
Guarding per span length- Cradle Guarding (Fixing of ' X' arm Lacing )
1
-
-
Guarding per span length- Fixing of one earthing device with stud
1
-
-
Erection of transformer/dismantling upto 200KVA
1
-
-
Erection of transformer/dismantling upto 250KVA
1
-
-
Erection of transformer/dismantling upto 500KVA
1
-
-
Erection of centre support (Including concrete)
1
-
-
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
1
-
-
Erection of feeder cable with open type fuse unit - for each addl feeder
1
-
-
Erection of feeder cable -Bus bar arrangement with open type
1
-
-
Loading & unloading of Distribution transformer below 250KVA
1
-
-
Loading & unloading of Distribution transformer 250KVA
1
-
-
Loading & unloading of Distribution transformer 500KVA
1
-
-
Plinth work for 500KVA DT with construction material
1
-
-
Tube light erection-1*40W tube light complete set (including transport)
1
-
-
Tube light erection-For SV lamp and mercury lamp complete set (including transport)
1
-
-
Tube light erection-For CFL lamp complete set (including transport)
1
-
-
Manufacturing of clamps 50*8 mm
1
-
-
Manufacturing of clamps 65*10 mm
1
-
-
Alteration of clamps
1
-
-
Corroded pole welding with 4 pieces of charges (incl.Concreting of cement) note:pieces will be supplied by board
1
-
-
Welding joint for new RSJ pole at workshop per foot run of welding
1
-
-
Street light switching pont arrangement
1
-
-
Drilling less than 23mm holes per hole/slatted hole
1
-
-
Cutting of channel
1
-
-
Cutting of Flat
1
-
-
Cutting of Angle
1
-
-
RSJ pole cutting
1
-
-
Tubular pole cutting
1
-
-
Rail pole cutting
1
-
-
Fabrication of lightning arrestor frame
1
-
-
LT-Changing of pin point to cut point
1
-
-
HT-Changing of pin point to cut point
1
-
-
Erection of service connection materials-1Ph service
1
-
-
Erection of service connection materials-3Ph service
1
-
-
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
1
-
-
Dismantling of poles without concrete in damaged condition including grill separation etc.,
1
-
-
Providing jumpering at cut point
1
-
-
complete replacement of worn out earth wire per structure
1
-
-
Labour for manufacturing of open type fuse unit (Materials supplied by board)
1
-
-
Manufacturing of HG fuse stool incl. materials
1
-
-
Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees 400/head/day
1
-
-
Tree clearence in HT or LT location- For coconut trees and Palmrah trees 500/head/day
1
-
-
Painting-Double pole Transformer structure materials (Double coat)
1
-
-
Painting-Pole (Colour washing with distember) 2 Nos
1
-
-
Painting-For transformer only (Double coat with paint)
1
-
-
Numbering of poles without paint (Labour)
1
-
-
Numbering of poles with paint (Labour)
1
-
-
Numbering of Distribution Trnasformer (Painting and writing of name board size-1-1/4*1 incl cost of paint and MS sheet
1
-
-
Writing in seating channel (Paint to be supplied by contractor)
1
-
-
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor
1
-
-
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by board
1
-
-
Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator
1
-
-
Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by board
1
-
-
Set right of leaning HT pole/LT pole including x arms, TI fittings
1
-
-
Transformer structure erection-Excavation of structure pole pits ( Nos)
1
-
-
Transformer structure erection-Erection of structure poles ( Nos)
1
-
-
Transformer structure erection-Excavation of stay pits(4Nos)
1
-
-
Transformer structure erection-Erection of stay set (4Nos)
1
-
-
Transformer structure erection-Concreting of structure poles incl.materials
2
-
-
Transformer structure erection-Concreting of stays (4Nos) incl.materials
4
-
-
Transformer structure erection-Base Concreting
2
-
-
Erection of Structure materials-Top Channel
1
-
-
Erection of Structure materials-Transformer seating channel and belting angle
1
-
-
Erection of Structure materials-AB switch (Complete)
1
-
-
Erection of Structure materials-HG fuse (Complete)
1
-
-
Erection of Structure materials-Jumpering
1
-
-
Erection of Structure materials-HT LAS
1
-
-
Erection of Structure materials-LT LAS
1
-
-
Earthing system-Excavation of 3 Nos. earth pits
1
-
-
Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection
1
-
-
Earthing system-Mason works for earth pits and structure pole coping (cement supplied by Contractor)
1
-
-
Earthing system-Painting of transformer structure 2 coats (Labour only)
1
-
-
Earthing system-Painting with Distember paint on poles
1
-
-
Earthing system-Spreading yard jelly and cut stone and bricks including material
1
-
-
Earthing system-Writing of name board and target board
1
-
-
Erection of Tapping structure-Excavation of structure pole pit.
1
-
-
Erection of Tapping structure-Erection of structure pole.
1
-
-
Erection of Tapping structure-Excavation of stay pit.
1
-
-
Erection of Tapping structure-Erection of stay set.
1
-
-
Erection of Tapping structure-Concreting of pole.
1
-
-
Erection of Tapping structure-Concreting of stay.
1
-
-
Erection of Tapping structure-Base Concreting.
1
-
-
Erection of Structure materials-Top channel
1
-
-
Erection of Structure materials-AB switch (complete)
1
-
-
Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing
1
-
-
Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.
1
-
-
Earthing system-Mason works for earth pit (including material)
1
-
-
Colour coating on poles with iron materials including paint and distember
1
-
-
Transporting of 42' twin RSJ pole from roadside pole pit
1
-
-
Fabrication of 42' Twin RSJ pole, Materials supplied by Board.
1
-
-
Excavation & Erection of Twin 42'2' fabricated RSJ pole
1
-
-
Concreting of 42' twin RSJ pole
1
-
-
Singple pole structure erection- 9.0 mtr RCC POLE (square) -Loading & Unloading of poles
1
-
-
Singple pole structure erection- 9.0 mtr RCC POLE (square) -Excavation of pole pit & pole erection
1
-
-
Singple pole structure erection- 9.0 mtr RCC POLE (square) -Transporting road side to pole pit
1
-
-
Singple pole structure erection-Excavation and erection of stay set complete with stay clamps ( with 16mm stay rod with base plate )
1
-
-
Fixing of single pole structure materials & structure clamps ( Tapping channel - 1 No., Tr.bed, Erection AB switch - 1 set, Erection HG Fuse set - 1 set )
1
-
-
Erection of 16/25 KVA,11KV / 433 Volts 3 phase
1
-
-
Earthing for 9 mtr RCC structure square pole (3 pits)
1
-
-
Concreting including materials for 9 mtr RCC square pole-Base concreting 1:4:8 500*650*150mm, Pole concreting1:2:4 500*500*1700 & Coping 1:2:4 ( as per actuals )
1
-
-
Concreting including materials for stay sets. (cement, jelly and sand)
1
-
-
Fixing of 11 Kv lighting arrester, metal oxide, 9 KV, 5 KA (HT & LT)
1
-
-
Erection of LT wiring kit ( Double open type circuit)
1
-
-
Fixing of caution / Danger Board as per drawing
1
-
-
Painting of single pole str including iron materials double coat with painting materials
1
-
-
Fixing of guarding X arm
1
-
-
Fixing of Tapping channel X arm
1
-
-
Fixing of LT shackle
1
-
-
Fixing of 11 KV Strain Disc
1
-
-
Maintenance of AB switch-Replacement of male and female one number contact and PTinsulator
1
-
-
Maintenance of AB switch-Cleaning of contacts, lubrication and checking of operating pipe movments
1
-
-
Maintenance of Distribution Transformer-Cleaning of HT/LT Bushings, Oil level checking , Silical gel
replacement, Terminal tightness checking, Cleaning of DT yard,
earth pit watering and maintenance of open types etc.,
1
-
-
Maintenance of Distribution Transformer-Providing of 'U' jumpering
1
-
-
Dismantling of other line materials - (Please mention In percentage for respective line material errection works)