Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Machinery and Tools
Eprocure
Opening Date22 Oct 2024
Closing Date4 Nov 2024
Tender AmountRefer Documents
Costs
EMD
₹ 3,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Supply Of Electric Chain Hoist
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_495684_1Bid Award Id
ViewTender No
26/24-25,dt.21.10.2024Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr
-
-
-
Ordinary soil
1
-
-
Semi rocky soil
1
-
-
Heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned EE]
1
-
-
Stay pit
-
-
-
in ordinary soil [0.95 x 0.6 x 1.2m]
1
-
-
semi rocky soil
1
-
-
Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE]
1
-
-
Erection of poles & stays (Including refilling of excavated earth)
-
-
-
Erection of 7.5m / 8.0m poles [RCC / PSC]
1
-
-
Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles
1
-
-
Stay set
-
-
-
Erection stay set complete
1
-
-
Stay erection without rod and pit
1
-
-
Replacement of stay rod only. (Including stay pit excavation & refilling & erection)
1
-
-
Replacement of guy shackle only in existing stay
1
-
-
Erection of LINE MATERIALS
-
-
-
Fixing of LT 1 ph "X" Arm
1
-
-
Fixing of LT/HT TI Fitting
1
-
-
Fixing of LT 3 ph "X" Arm
1
-
-
Fixing of 3[1/2]' ' V ` X ' arm
1
-
-
Fixing of 4[1/2]' V ` X ' arm
1
-
-
Fixing of 5' V X arm
1
-
-
Fixing of tapping channel / guarding "X" arm
1
-
-
Providing of line spacers in LT lines 1 phase
1
-
-
Providing of line spacers in LT lines 3 phase
1
-
-
Erection of AB Switch with PT insulator & Jumpering complete
1
-
-
Erection of centre rotating Switch AB Switch complete
1
-
-
FIXING OF HT PIN INSULATOR / STRAIN DISC
-
-
-
11 KV Pin insulator with pin
1
-
-
11 KV strain disc / polymer disc with hardware
1
-
-
22 KV Pin insulator with pin
1
-
-
22 KV Strain disc / polymer disc with hardware
1
-
-
33 KV Pin insulator with pin
1
-
-
33 KV Pin Strain disc/polymer disc with hardware
1
-
-
Fixing of LT Pin insulator with pin
1
-
-
LT Shakle with hardware
1
-
-
Fixing of Aluminium knob
1
-
-
Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run
-
-
-
Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm
1
-
-
ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm
1
-
-
ACSR 7/4.09 mm
1
-
-
Above 7/4.09 mm ACSR & DOG conductor
1
-
-
Earthing wiring and connection including transporting of earth pipe and excavation of pit]
-
-
-
Transformer structure earthing 10ft depth - 3 nos of pipe through Tubes
1
-
-
DP earthing including all works [double side earthing]
1
-
-
Erection of 4th Earth pipe including earthing
1
-
-
Earthing of poles
1
-
-
Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub.
1
-
-
Replacement of detoriated earth pipe per location
1
-
-
Concreting with Mixture 1:3:6 [including All materials].
-
-
-
Mass Concreting for centre support for 2 feet including all materials
1
-
-
Mass concreting for pole0.6x0.6x1.25M.with coping
1
-
-
Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping
1
-
-
Sleeve concreting for stay set 0.3 m & 0.75 long
1
-
-
Erection of Distribution Transformer Structure Complete
-
-
-
Excavation of structure pole Pits 0.9 X 0.9 X 1.83 Mtr
1
-
-
Transporting of pole to pit location 2 Nos.
1
-
-
Erection of poles 2 Nos
1
-
-
Excavation of stay pit 4 Nos
1
-
-
Erection of stay set (4 sets)
1
-
-
Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos.
1
-
-
Erection of 22 KV AB Switch
1
-
-
Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes
1
-
-
Erection of Top Channel
1
-
-
Bed Channel [2 nos channel] Erection
1
-
-
Cross with stud for bed channel Erection
1
-
-
Erection of belting angle / HG fuse angle
1
-
-
Erection of HG fuse Set
1
-
-
Erection of HT LAS with jumpering and earthing
1
-
-
Erection of LT LAS with jumbering and earthing
1
-
-
Erection of Jumpering [HT Side]
1
-
-
Transformer wiring in LT side including Jumpering Bus bar etc.
1
-
-
Erection LT open type fuse unit arrangement single
1
-
-
Erection LT open type fuse unit arrangement Double
1
-
-
Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint).
1
-
-
Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint)
1
-
-
Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem]
1
-
-
Painting name of SS at seating channel including paint.
1
-
-
Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint.
1
-
-
DT metering arrangement (without materials)
1
-
-
Erection of distribution Transformer /dismantling of DT
-
-
-
Upto 100 KVA
1
-
-
above 100 KVA and Upto 250 KVA
1
-
-
500 KVA
1
-
-
Colour washing of RCC / PSC poles
1
-
-
Numbering of poles including cost of paint / loc [black background and yellow letters]
1
-
-
Painting of SC details in the meter board / Agl boxes / Hut SCs including paint.
1
-
-
SERVICE CONNECTION
-
-
-
Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling
1
-
-
Transporting of required materials from road side to work spot and erection of 250 W S.V. lamp / Mercury lamp/LED Yard Light Fitting including wiring, clamping of pipe, serial board assembling etc.
1
-
-
Fixing of street light fitting with 2 CFL/ 4 CFL
1
-
-
Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc.
1
-
-
Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot
1
-
-
Erection/dismantling of metering set 11 KV / 22 KV/33 KV
1
-
-
Fabrication Works.
-
-
-
Labour charges for alteration of back clamp / stay clamp to suitable for works.
1
-
-
Providing of Holes.
-
-
-
All size angles / channel upto 5/8"
1
-
-
All size angles / channel above 5/8"
1
-
-
Slot holes in flat / angles / channel upto 3/4"
1
-
-
Slot holes in flat / angles / channel above 3/4"
1
-
-
Fabrication of centre support only for DT structure
1
-
-
Cutting of RS Joist / Angles / MS Channels
1
-
-
Welding of RS Joist / Angles / MS Channels
1
-
-
GENERAL
-
-
-
Set right the leaning pole in both HT & LT [ pin point ] location
1
-
-
Set right the leaning pole in both HT & LT [ cut point ] location
1
-
-
Resagging of lines for all sizes cut point location
1
-
-
Converting pin point into cut point HT lines
1
-
-
Converting pin point into cut point LT lines
1
-
-
Clearing tree branches of coconut tree
1
-
-
Clearing tree branches of Neem, tamarind, country tree etc.,
1
-
-
Releasing and erection 1 ph SC wire [during conductor or support change]
1
-
-
Releasing and erection 3 ph SC wire [during conductor or support change]
1
-
-
Destruction of pole concerting at site.
1
-
-
Retrieving grill from detoriated pole [grill separate from damaged pole]
1
-
-
Re earthing of structure completely including earthpipe changing if any 3nos earth pipe
1
-
-
Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe )
1
-
-
Guarding Arrangement :-
-
-
-
Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ]
1
-
-
Flat guarding with 4 wire
1
-
-
Split Netural Guarding
1
-
-
LOADING AND UNLOADING :
-
-
-
Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ]
1
-
-
Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ]
1
-
-
Unloading of PSC / RCC / Metal Poles
1
-
-
TRANSPORTING FROM ROAD SIDE TO WORKSPOT
-
-
-
Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km
1
-
-
Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof [ certified by AEE ]
1
-
-
Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km
1
-
-
Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof
1
-
-
TRANSPORT OF LINE MATERIALS
-
-
-
Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading Upto 8 kms
1
-
-
Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM
1
-
-
TRANSPORT OF EQUIPEMENTS
-
-
-
Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum Up to 30 Km
1
-
-
.Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum above 30 Km for every addl .1 KM
1
-
-
DISMANTLING WORKS
-
-
-
Dismantling of 7.5m / 8.0m poles [RCC / PSC]
1
-
-
Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles
1
-
-
Dismantling stay set complete
1
-
-
Dismantling of LT 1 ph "X" Arm / LT/HT TI Fitting
1
-
-
Dismantling of LT/HT TI Fitting
1
-
-
Dismantling of LT 3 ph "X" Arm
1
-
-
Dismantling of 3[1/2]' V ` X ' arm
1
-
-
Dismantling of Tapping channel and Guarding X Arm
1
-
-
Dismantling of 11 KV strain disc/polymer disc with hardware
1
-
-
Dismantling of 22 KV Pin insulator with pin
1
-
-
Dismantling of 22 KV Strain disc with hardware
1
-
-
Dismantling of 33 KV Pin insulator with pin
1
-
-
Dismantling of 33 KV Strain disc with hardware
1
-
-
Dismantling of LT Pin insulator with pin
1
-
-
Dismantling of LT Shackle with hardware
1
-
-
Dismantling of Aluminium knob
1
-
-
Dismantling of Conductor 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm
1
-
-
Dismantling of Conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm
1
-
-
Dismantling of Conductor ACSR 7/4.09 mm
1
-
-
SINGLE PHASE METER &3 PHASE METER
-
-
-
Fixing of single phase meter
1
-
-
Fixing of 3 phase meter
1
-
-
Dismantling of single phase meter
1
-
-
Dismantling of 3 phase meter
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements