Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date8 Oct 2024
Closing Date22 Oct 2024
Tender Amount₹ 4,90,900 
Notes
Download

Costs

Summary

Construction Of Fire Protection Wall In Between Power Transformer I And Ii At Somanur 110 33 11kv Sub Station

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of fire protection wall in between power transformer I and II at Somanur 110 33 11KV Sub Station
Construction of fire protection wall in between power transformer I and II at Somanur 110 33 11KV Sub Station
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and filling of M.sand in foundation and basement with well consolidation, watering including cost of all materials, labour, lead,lift, etc., complete.

2

-

-

... More
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation and flooring including cost of all materials, M.sand, curing, labour, lead, lift, etc. complete.

2

-

-

... More
Brick work in CM 1:5 mix using class II chamber burnt bricks of size for super structure including cost of all materials, M.Sand, Curing, labour, lead, lift, curing, etc., complete.

1

-

-

... More
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for raft foundation including cost of all materials, M.sand, curing, vibrating charges, labour, lead, lift, etc., complete, but excluding cost of steel reinforcement. (Raft)

2.5

-

-

... More
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete upto Ground level

1

-

-

... More
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete above Ground level

2

-

-

... More
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete above Lintel level (Under LC condition)

2

-

-

... More
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for Grade beam with form work including cost of all labour, materials, M.Sand,curing, vibrating charges, labour, lead, lift, etc. complete. But excluding cost of steel reinforcement.

1

-

-

... More
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for continuous lintel and roof beam with formwork including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (Ground floor)

0.4

-

-

... More
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for continuous Roof beam with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (under LC condition)

0.4

-

-

... More
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for precast slab with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (Ground floor)

3

-

-

... More
Refilling with excavated earth other than sand in foundation and well consolidation, watering including labour, lead , lift, etc., complete as per standard specification.

16

-

-

... More
Disposal of excess of surplus earth away in low lying, area with a lead of 100 m including spreading and levelling labour, lead, lift etc., complete

3

-

-

... More
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, typing and fixing in position as per specification including cost of all materials, binding wire, labour, lead and lift etc., complete.

947

-

-

... More
Plastering with cm 1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, M.Sand, curing, labour, lead, lift etc., complete.

35

-

-

... More
Colour washing two coats of cement paint over one coat of primer using white cement for outside wall surface including cleaning the plastered surface, cost of all materials, labour lead, lift etc., complete.

80

-

-

... More
Labour charges for transporting from casting yard to curing tank, curing tank to fixing location, erection and installation of precast / Pre stressed concrete element in correct and final position with proper line level and plumb at site making arrangement (i.e. Cranes, push-pull jacks and all other tools and plants for lifting, placing and allignment of elemental, with in erection tolarance and all complete as per the direction of Engineer in charge including cost of all materials, labour, lead, lift etc., complete

3

-

-

... More
Supply and fixing of ISMC 100 C Type channal for inserting of precast slabs etc including cost of all materials, labour, painting two coat over one coat of iron primer, lead, lift etc., complete

320

-

-

... More
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only

1

-

-

... More
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only

1

-

-

... More
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.