Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Civil And Construction
Excavation
Electrical and Electronics
Electrical Works
Eprocure
Opening Date18 Jul 2024
Closing Date1 Aug 2024
Tender Amount₹ 2,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles

1

-

-

... More
Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles

1

-

-

... More
Hard rock requiring Blasting and chisseling- Erection of 7.32m, 7.5m, 8m, 8.23m poles

1

-

-

... More
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles

1

-

-

... More
Normal ground- Erection of 9M & 9.14M poles

1

-

-

... More
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles

1

-

-

... More
Rocky ground- Erection of 9M & 9.14M poles

1

-

-

... More
Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 9M & 9.14M poles

1

-

-

... More
Hard rock requiring Blasting and chisseling- Erection of 9M & 9.14M poles

1

-

-

... More
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists

1

-

-

... More
Normal ground- Erection of above 9.14M poles & 36' length RS Joists

1

-

-

... More
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' length RS Joists

1

-

-

... More
Rocky ground- Erection of above 9.14M poles & 36' length RS Joists

1

-

-

... More
Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14M poles & 36' length RS Joists

1

-

-

... More
Hard rock requiring Blasting and chisseling- Erection of above 9.14M poles & 36' length RS Joists

1

-

-

... More
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists

1

-

-

... More
Normal ground- Erection of 42' length RS Joists

1

-

-

... More
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42' length RS Joists

1

-

-

... More
Rocky ground- Erection of 42' length RS Joists

1

-

-

... More
Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 42' length RS Joists

1

-

-

... More
Hard rock requiring Blasting and chisseling- Erection of 42' length RS Joists

1

-

-

... More
Transporting of poles from road side to pole pit upto 2KM - 7.32m, 7.5m, 8m, 8.23m RCC pole

1

-

-

... More
Transporting of poles from road side to pole pit upto 2KM- 9m, 9.14m RCC/PSC pole

1

-

-

... More
Transporting of poles from road side to pole pit upto 2KM - RSJ 36' Pole

1

-

-

... More
Transporting of poles from road side to pole pit - RSJ 42' and above

1

-

-

... More
Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole

1

-

-

... More
Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole

1

-

-

... More
Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)

1

-

-

... More
Concreting of poles as per Board Standards (2'*2'*5'). The material such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete)

1

-

-

... More
Coping of pole (0.6m*0.6m*0.35m)

1

-

-

... More
Concreting of stay (o.3m * 0.3m * 1.5m) including materials

1

-

-

... More
Coil earthing per pole & pole earthing

1

-

-

... More
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)

1

-

-

... More
Normal ground- Erection of stay set

1

-

-

... More
Rocky ground (Medium)- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)

1

-

-

... More
Rocky ground- Erection of stay set

1

-

-

... More
Hard Rock requires blasting & chisseling- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)

1

-

-

... More
Hard Rock requires blasting & chisseling- Erection of stay set

1

-

-

... More
Loading and unloading charges of Oil drums (with oil)

1

-

-

... More
Loading and unloading charges of Oil drums (without oil)

1

-

-

... More
Loading and unloading charges of Conductor Drum, Cable Drum

1

-

-

... More
Loading and unloading charges of Line Materials

1

-

-

... More
Loading and unloading charges of Metering Set

1

-

-

... More
11KV Lines-(Pin point) Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site

1

-

-

... More
11KV Lines-(Cut Point) Fixing of V & Channel cross arm 5.5' including transporting of materials from road side to site

1

-

-

... More
11KV Lines-(Pin point) Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site

1

-

-

... More
11KV Lines-(Cut Point) Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site

1

-

-

... More
11KV Lines-(Pin point) Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site

1

-

-

... More
11KV Lines-(Cut Point) Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site

1

-

-

... More
LT Lines-Fixing of LT 3Phase cross arm including transporting of materials from road side to site

1

-

-

... More
LT Lines-Fixing of LT 1Phase cross arm including transporting of materials from road side to site

1

-

-

... More
11KV Lines-Fixing of HT LT TI fitting including transporting of materials from road side to site

1

-

-

... More
11KV Lines-Erection of HT Side arm with stud including transporting of materials from road side to site

1

-

-

... More
11KV Lines-Erection of LT Side arm with stud including transporting of materials from road side to site

1

-

-

... More
11KV Lines-Fixing of insulator (per location) including transporting of materials from road side to site

1

-

-

... More
11KV Lines-Fixing of 11KV Disc including transporting of materials from road side to site

1

-

-

... More
11KV Lines-Fixing of Tapping channel Cross arm including transporting of materials from road side to site

1

-

-

... More
HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For Dog conductor (1Span/Wire)

1

-

-

... More
HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR conductor (1Span/Wire)

1

-

-

... More
HT lines (33KV)- Line clear works-For Dog conductor (1Span/Wire)

1

-

-

... More
HT lines (33KV)- Line clear works-For 7/4.09 ACSR conductor (1Span/Wire)

1

-

-

... More
11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)

1

-

-

... More
11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire)

1

-

-

... More
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire)

1

-

-

... More
11KV Lines line clear works for For 7/2.59 ACSR (1Span/Wire)

1

-

-

... More
11KV Lines line clear works for For 7/3.35 ACSR (1Span/Wire)

1

-

-

... More
11KV Lines line clear works for For 7/4.09 ACSR (1Span/Wire)

1

-

-

... More
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50AAAC

1

-

-

... More
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR, 7/3.15 AAAC

1

-

-

... More
For LT line clear works for For7/2.59 ACSR, 7/2.50AAAC (1Span/Wire)

1

-

-

... More
For LT line clear works for For 7/3.35 ACSR, 7/3.15 AAAC (1Span/Wire)

1

-

-

... More
Guarding per span length- Spilt Neutral Guarding

1

-

-

... More
Guarding per span length- Flat Guarding (2 wires)

1

-

-

... More
Guarding per span length- Flat Guarding (4 wires)

1

-

-

... More
Guarding per span length- Flat Guarding (6 wires)

1

-

-

... More
Guarding per span length- Cradle Guarding (Fixing of ' X' arm Lacing )

1

-

-

... More
Guarding per span length- Fixing of one earthing device with stud

1

-

-

... More
Erection of transformer/dismantling upto 200KVA

1

-

-

... More
Erection of transformer/dismantling upto 250KVA

1

-

-

... More
Erection of transformer/dismantling upto 500KVA

1

-

-

... More
Erection of centre support (Including concrete)

1

-

-

... More
Erection of Metering set

1

-

-

... More
Erection of feeder cable with open type fuse unit per feeder

1

-

-

... More
Erection of feeder cable with open type fuse unit - for each addl feeder

1

-

-

... More
Erection of feeder cable -Bus bar arrangement with open type

1

-

-

... More
Loading & unloading of Distribution transformer below 250KVA

1

-

-

... More
Loading & unloading of Distribution transformer 250KVA

1

-

-

... More
Loading & unloading of Distribution transformer 500KVA

1

-

-

... More
Plinth work for 500KVA DT with construction material

1

-

-

... More
Fabrication ,erection and excavation for centre support etc for 250 /500 DT including transporting

1

-

-

... More
Tube light erection-1*40W tube light complete set (including transport)

1

-

-

... More
Tube light erection-For SV lamp and mercury lamp complete set (including transport)

1

-

-

... More
Tube light erection-For CFL lamp complete set (including transport)

1

-

-

... More
Painting of Sc Number including Painting

1

-

-

... More
Tube light 72W LED Erection

1

-

-

... More
Manufacturing of clamps 50*8 mm

1

-

-

... More
Manufacturing of clamps 65*10 mm

1

-

-

... More
Alteration of clamps

1

-

-

... More
Street light switching point arrangement

1

-

-

... More
Drilling / Less than 23mm holes per hole /slotted holes

1

-

-

... More
Cutting of channel

1

-

-

... More
Cutting of Flat

1

-

-

... More
Cutting of Angle

1

-

-

... More
RSJ pole cutting

1

-

-

... More
Tubular pole cutting

1

-

-

... More
Rail pole cutting

1

-

-

... More
Fabrication of lightning arrestor frame

1

-

-

... More
LT-Changing of pin point to cut point

1

-

-

... More
HT-Changing of pin point to cut point

1

-

-

... More
Erection of service connection materials-1Ph service

1

-

-

... More
Erection of service connection materials-3Ph service

1

-

-

... More
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,

1

-

-

... More
Dismantling of poles without concrete in damaged condition including grill separation etc.,

1

-

-

... More
Providing jumpering at cut point

1

-

-

... More
complete replacement of worn out earth wire per structure

1

-

-

... More
Labour for manufacturing of open type fuse unit (Materials supplied by board)

1

-

-

... More
Manufacturing of HG fuse stool incl. materials

1

-

-

... More
Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees

1

-

-

... More
Tree clearence in HT or LT location- For coconut trees

1

-

-

... More
Tree clearence in HT or LT location- For Palmrah trees

1

-

-

... More
Painting-Double pole Transformer structure materials (Double coat) (Including cost of paint)

1

-

-

... More
Painting-Pole (Colour washing with distember) 2 Nos (Including cost of paint)

1

-

-

... More
Painting-For transformer only (Double coat with paint)

1

-

-

... More
Numbering of poles with backround colour paint

1

-

-

... More
Numbering of Distribution Transformer (Painting and writing of name board size-1-1/4*1 incl cost of paint & board and MS sheet

1

-

-

... More
Writing in seating channel (Paint to be supplied by contractor)

1

-

-

... More
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor

1

-

-

... More
Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator

1

-

-

... More
Set right of leaning HT pole/LT pole including x arms, TI fittings

1

-

-

... More
Transformer structure erection-Excavation of structure pole pits ( 2Nos)

1

-

-

... More
Transformer structure erection-Erection of structure poles ( 2Nos)

1

-

-

... More
Transformer structure erection-Excavation of stay pits(4Nos)

1

-

-

... More
Transformer structure erection-Erection of stay set (4Nos)

1

-

-

... More
Transformer structure erection-Concreting of structure poles incl.materials Mass concrete with coping (2 poles)

1

-

-

... More
Transformer structure erection-Concreting of stays (4Nos) incl.materials

1

-

-

... More
Erection of Structure materials-Top Channel

1

-

-

... More
Erection of Structure materials-Transformer seating channel and belting angle

1

-

-

... More
Erection of Structure materials-AB switch (Complete)

1

-

-

... More
Erection of Structure materials-HG fuse (Complete)

1

-

-

... More
Erection of Structure materials-Jumpering

1

-

-

... More
Erection of Structure materials-HT LAS

1

-

-

... More
Erection of Structure materials-LT LAS

1

-

-

... More
Erection of structure materials -Transformer LT cable wiring / LT Bus Bar

1

-

-

... More
Erection of structure material-Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending ,fabrication etc

1

-

-

... More
Earthing system-Excavation of 4 Nos. earth pits

1

-

-

... More
Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection

1

-

-

... More
Earthing system-Mason works with bricks for earth pits 4 nos (cement supplied by Contractor)

1

-

-

... More
Earthing system-Painting of transformer structure 2 coats incl.paint

1

-

-

... More
Earthing system-Painting with Distember paint on poles with paint cost

1

-

-

... More
Earthing system-Spreading yard jelly and cut stone and bricks including material

1

-

-

... More
Earthing system-Writing of name board and target board

1

-

-

... More
Earthing system-Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole

1

-

-

... More
Earthing system-Fixing of Danger Board ( labour only)

1

-

-

... More
Erection of Tapping structure-Excavation of structure pole pit. (2Nos)

1

-

-

... More
Erection of Tapping structure-Erection of structure pole. (2Nos)

1

-

-

... More
Erection of Tapping structure-Excavation of stay pit (2Nos)

1

-

-

... More
Erection of Tapping structure-Erection of stay set (2Nos)

1

-

-

... More
Erection of Tapping structure- Concreting of structure poles including materials Mass Concrete with Copping (2Nos)

1

-

-

... More
Erection of Tapping structure-Concreting of stay (2Nos)

1

-

-

... More
Erection of Structure materials-Top channel

1

-

-

... More
Erection of Structure materials-AB switch (complete)

1

-

-

... More
Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing

1

-

-

... More
Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.

1

-

-

... More
Earthing system-Mason works with Bricks for earth pit (including material)

1

-

-

... More
Colour coating on poles with iron materials including paint and distember

1

-

-

... More
Transporting of 42' twin RSJ pole from roadside pole pit

1

-

-

... More
Fabrication of 42' Twin RSJ pole, Materials supplied by Board.

1

-

-

... More
Excavation & Erection of Twin 42'2' fabricated RSJ pole

1

-

-

... More
Concreting of 42' twin RSJ pole

1

-

-

... More
Resagging of various conductor (Please mention in percentage of respectie conductor)

1

-

-

... More
Dismantling of 7.5m /8m pole with out damage

1

-

-

... More
Dismantling of 9.14m pole/ RSJ with out damage

1

-

-

... More
Dismantling of stay set complete

1

-

-

... More
Replacement of detoriated stay rod

1

-

-

... More
Replacement of RSJ/Tubular poles below 30 feet

1

-

-

... More
Replacement Of RSJ/Tubular poles aove 30 feet

1

-

-

... More
Dismantling of detoriated cables of various size(95,120,185 sq.mm) from DT,LT bushing to LT open type clamp and erection of suitable lug at both ends

1

-

-

... More
Replacement of new 10' earth pipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding

1

-

-

... More
Mass Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum)

1

-

-

... More
Sleeve Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M)

1

-

-

... More
Providing of Spacers in LT Lines

1

-

-

... More
Hiring of JCB

1

-

-

... More
Hiring of Crane

1

-

-

... More
Exceeding 1 Hour for every hour

1

-

-

... More
Transporting of Charges of DT / Line materials using private vehicle upto 20 KM ( Up and Down)

1

-

-

... More
Beyond 20 KM for every KM

1

-

-

... More
Single pole structure erection- Excavation of structure pole pit 3’ x 6’ by using JCB or Manual

1

-

-

... More
Single pole structure erection- Transportation of pole from road side to pole pit by using JCB or Manual

1

-

-

... More
Single pole structure erection-Erection of poles by using JCB or Manual

1

-

-

... More
Single pole structure erection Excavation of stay pit by JCB or Manual (2Nos)

1

-

-

... More
Single pole structure erection- Erection of stay set complete (2Nos)

1

-

-

... More
Single pole structure erection -Mass concreting for structure

1

-

-

... More
Singple pole structure erection -Stay Concrete (2Nos)

1

-

-

... More
Single pole structure erection -Erection of Structure materials- Tapping channel

1

-

-

... More
Single pole structure erection -Erection of Structure materials- Transformer Bed Stucture

1

-

-

... More
Single pole structure erection -Erection of AB switch

1

-

-

... More
Single pole structure erection -Erection of H.G. Fuse (3Nos)

1

-

-

... More
Structure earthing complete with 3 pits and earth loops

1

-

-

... More
Singple pole structure erection-Fixing of MCD Box

1

-

-

... More
Singple pole structure erection-HT-LAS fixing (3Nos)

1

-

-

... More
Singple pole structure erection-LT-LAS fixing (3Nos)

1

-

-

... More
Singple pole structure erection-HT jumpering complete

1

-

-

... More
Singple pole structure erection-Painting of all clamps and other iron materials and painting of structure pole

1

-

-

... More
Singple pole structure erection-LTCable arrangement

1

-

-

... More
Singple pole structure erection-Fixing of Danger board

1

-

-

... More
Dismantling of other line materials - (Please mention In percentage for respective line material errection works)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.