Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Electrical and Electronics
Eprocure
Opening Date26 Aug 2022
Closing Date12 Sep 2022
Tender AmountRefer Documents
Costs
EMD
₹ 60,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Rate Contract For Erection Work Of Htlt Lines And Distribution Transformer Structure With Etc.,of Ex.kunichi 11kv Feeder At Kunichi 33 11kvss Under Agri Feeder Segregation Of Rdss Scheme In Kunichi O And M West Tirupattur Sub Division Tedc
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_EB_248707_1Bid Award Id
ViewTender No
43/22-23/Dt.26.08.2022Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
In Hard Soil (common to all size of poles)
100
-
-
... More
In rocky area(common to all size of poles) by blasting/Manual
100
-
-
... More
Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual
326
-
-
... More
Erection of Poles and Accessories
-
-
-
... More
Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual
124
-
-
... More
Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual
409
-
-
... More
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
326
-
-
... More
Erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod.
2
-
-
... More
Fixing of line materials
-
-
-
... More
Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet,Tapping arm, Guarding Cross arm
494
-
-
... More
Fixing of LT 3 Phase cross arm
261
-
-
... More
Fixing of LT single Phase cross arm
2
-
-
... More
Fixing of HT / LT TI Fitting
416
-
-
... More
Fixing of HT Pin Insulators (11/22/33KV)
1264
-
-
... More
Fixing of LT Pin Insulators
214
-
-
... More
Fixing of HT 11KV stain disc
726
-
-
... More
Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, insulators and Jumpering etc
5
-
-
... More
Set right of all siizes of leaning poles
5
-
-
... More
Fixing of LT Shackle
676
-
-
... More
Fixing of Aluminium knob
278
-
-
... More
Paving and Stringing of conductor
-
-
-
... More
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
28.69
-
-
... More
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR
57.75
-
-
... More
Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor
11.25
-
-
... More
Releasing and reerection (resagging) of one run of all sizes of conductor
5
-
-
... More
Erection of Distribution Transformers:
-
-
-
... More
Erection of 11KV Single pole structure including erection of DT complete without centre support
57
-
-
... More
ERECTION OF DP STRUCTURE:
-
-
-
... More
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc.,
5
-
-
... More
Concreting Works
-
-
-
... More
Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles
409
-
-
... More
stay concreting
326
-
-
... More
Earthing
-
-
-
... More
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
409
-
-
... More
Loading/Unloading Charges
-
-
-
... More
Loading of DT upto 100KVA
57
-
-
... More
Unloading of DT upto 100KVA
57
-
-
... More
Loading of various size of REC, RCC,PSC Poles upto 8.0m length
124
-
-
... More
Loading of various size of REC, RCC,PSC Poles above 8.0m length
476
-
-
... More
Unloading of various size of REC, RCC,PSC Poles upto 8.0m length
124
-
-
... More
Unloading of various size of REC, RCC,PSC Poles above 8.0m length
476
-
-
... More
Loading of conductor
25
-
-
... More
Unloading of conductor
25
-
-
... More
Loading of line material
15
-
-
... More
Unloading of line material
15
-
-
... More
Loading of 11 KV strain disc
61
-
-
... More
Unloading of 11 KV strain disc
61
-
-
... More
Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
8
-
-
... More
Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
8
-
-
... More
Transportation charges
-
-
-
... More
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
600
-
-
... More
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5 KM from Tirupathur to Kunichi
600
-
-
... More
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM from Tirupathur to Kunichi
600
-
-
... More
Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor
97.69
-
-
... More
Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
22
-
-
... More
Dismandling of Line Materials
-
-
-
... More
Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit
10
-
-
... More
Dismandling of Stay set complete including Stay rod
2
-
-
... More
Dismandling of conductor of upto 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils
1
-
-
... More
Dismandling of conductor of above 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils
2
-
-
... More
Dismandling of Cross arm clamps, TI fittings hardwares, insulators etc.
50
-
-
... More
PAINTING:
-
-
-
... More
Numbering of poles including base painting and with cost of paint
409
-
-
... More
Painting of Cement poles by Distember coating including cost of distember
409
-
-
... More
WORKSHOP CHARGES :-
-
-
-
... More
Manufacturing/ Altering of clamps
200
-
-
... More
Drilling of holes in the structure materials clamps etc.
300
-
-
... More
AB switch or open type side arm stud, cutting and drilling holes.
60
-
-
... More
Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe
120
-
-
... More
GENERAL
-
-
-
... More
Jungle clearance such as Kattu Karuvai in the various area without uprooting
3000
-
-
... More
Jungle clearance such as Kattu Karuvai in the various area with uprooting
3000
-
-
... More
Clearing of Tree brances of coconut tree
300
-
-
... More
Clearing of Tree brances of Neem, Tamerined, country etc
300
-
-
... More
Leveling of Ground using Bul Dozer
50
-
-
... More
Cleaaring of Branches/ Trees with JCB
50
-
-
... More
E.P.F. @13 % should be Entered by the Bidder
1
-
-
... More
E.S.I. @3.25 % should be Entered by the Bidder
1
-
-
... More
G.S.T. @18% should be Entered by the Bidder
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements