Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Machinery and Tools
Eprocure
Opening Date25 May 2023
Closing Date8 Jun 2023
Tender AmountRefer Documents
Costs
EMD
₹ 6,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_EB_319366_1Bid Award Id
ViewTender No
CE/ MTPS-I/ SE / M-I / TM / OT. 153 / 2023-24Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
MTPS I TM Unit I to IV Attending Breakdown maintenance works of tube puncture and gasket renewal work in LP Heaters Gland coolers Main Ejectors and attending defects in regenerative system as and when required basis for a period of one year during 2023
MTPS I TM Unit I to IV Attending Breakdown maintenance works of tube puncture and gasket renewal work in LP Heaters Gland coolers Main Ejectors and attending defects in regenerative system as and when required basis for a period of one year during 2023
MTPS I TM Unit I to IV Attending Breakdown maintenance works of tube puncture and gasket renewal work in LP Heaters Gland coolers Main Ejectors and attending defects in regenerative system as and when required basis for a period of one year during 2023
BOQ Items
... More
d) Providing new gaskets for the tube nest and placing the tube nest inside the shell.
4
-
-
... More
e) Cleaning and checking of drip line Header Nozzle holes, Checking the tube nest for leak if any plugging of all punctured tubes, placing the water box on the tube nest and tightening of main flange, Condensate inlet and outlet flanges after providing new gaskets.
4
-
-
... More
Puncture Attending works and Gasket renewal of Gland Cooler - 1/2 a) Removal of Water box, flange bolts and nuts, Condensate inlet and outlet flanges, lifting the water box, placing it on the floor and cleaning of all flange surfaces.
2
-
-
... More
b) Lifting of tube nest, Placing it on the floor, inspection, cleaning of tube nest and hydraulic testing etc.
2
-
-
... More
c) Providing new gasket, for the tube nest and placing the tube nest inside the shell
2
-
-
... More
d) Placing the water box on the tube nest and tightening the main flange, Condensate inlet and outlet flanges after providing new gasket
2
-
-
... More
Overhauling and Hydraulic testing and Re-assembling of Safety valve size 6”/8”/40/64 ATA Removing the safety Relief valve size 6”, 8” / 40, 64 ATA, Disassembling the Safety Relief Valve, cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with new inlet and outlet flange gaskets.
4
-
-
... More
Overhauling Hydraulic test and Re- assembling of Safety valve of size 4”/2”/ 300 class. Removing the safety Relief valve Size 4’’, 2.5’’/ 339 Class from LP Heater, Gland cooler-I & Flange & Stud hea ting system Disassembling the Safety Relief Valve, cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with new inlet and outlet flange gaskets.
4
-
-
... More
Inspection and Gasket Renewal of Main Ejector Disconnecting of all the steam pipe lines air lines and dismantling the nozzle box, Ejector shell, tube nest etc cleaning the tubes, water box, attending the tube puncture, setting and checking the nozzle gap, hydraulic testing of the tubes and assembling the ejector shell, tube nest, nozzle box, providing with new gasket connecting all the related pipe lines and overhauling of exit NRV and flow meter in main ejector as per direction of the Engineer
2
-
-
... More
Consumables and Tools & Plants for item Sl.No: 1 to 12
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements