Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Electrical and Maintenance Works
Eprocure
Opening Date18 Dec 2020
Closing Date4 Jan 2021
Tender AmountRefer Documents
Costs
EMD
₹ 1,37,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_EB_188168_1Bid Award Id
ViewTender No
12/2020-21/EEC/CED/VPMTender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing M.S.barri cading 1.5 m height using M.S.sheet 4 mm thick MS angle 50x50x8 m base channel 100 x 50 of all materials leads, lifts, labour, welding and erection, transporting at site, placing in position. Shifting to new location after completing works tools & plants etc., complete
20
-
-
Supply and laying PVC pipes 200mm dia including cost of jointing pastecoupling and other required items including cost of all material lead, lift,etc., complete.
60
-
-
Supply and fixing GI pipes 180mm dia including cost of material, fixing charge, necessary clamp etc., complete
36
-
-
Laying plain cement concrete 1:3:6 using 20 mm BG metal for fixing PVC pipe in the UG cable in proper alignment and level as per standard specification including cost of all materials, labour, lead, lift,curing etc., complete
148
-
-
Transporting of 33 KV cable drums including cost of loading at stores, unloading of 33 KV cable drums each weighting approximately 7 Tonne in lorries using truck mounted crane for both loading and unloading including cost of labour, required etc.,
70
-
-
Laying of 3X400 sq. mm 33 KV XLPE UG cable by means of winch over rollers provided by contractor. The rate includes the cost of pulling the steel wire rope from which side to drum side providing labour as required at site for tying the cable in free foil formation with nylon rope etc., complete (Cable supplied by TANGEDCO)
9000
-
-
Refilling with filling sand (River Sand) in layers well consolidated as per standared specification including cost of all materials, labour, lead, lift etc., complete
2700
-
-
Labour charge for transportiong of V trough from substore to work spot including loading, unloading, laying of v trough over UG Cable, aligning etc complete., (V Trough Supplied by the Board)
12870
-
-
supplying and erection of RMU FOUNDATION WORK FOR 22 KV 3 WAY RMU FOUNDATION WITHOUT SCADA 1200mm Earth work excavation in sand (or) other loose soil not under water, silt, black cotton soil, sandy loarm ordinary soil etc. and depositing the same on the bank with initial lead, lift, etc. complete. For footing
2.35
-
-
PCC 1:2:4 using 40mm metal without formwork for foundation including cost of all materials,labour,lead,lift etc.. CompleteFor fixing RMU foundation,Brick work and Steps
0.7
-
-
Supplying and fabrication of steel reinforcement and placing in position tying with binding wire including cost of all materials, labour charges etc., Complete as directed by the Engineer incharge.
Raft
136.17
-
-
RCC M25 mix using 12 to 20mm HBG metal (machine crushed) for slab with formwork including cost of all materials, lead, lift, etc., complete.(by using mixer machine). Slab
1.5
-
-
Refilling with excavated earth other than sand including cost of all materials labour, lead, & lift etc complete
1.5
-
-
Brickwork in CM 1:6 mix using II class bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. Platform and Steps
1.5
-
-
Charges for loading and unloading the RMU Precast structure in the Various locations from the yard
2
-
-
Plastering with CM.1:4 mix using 12mm thick for inside & outside walls, including cost of all materials, labour, lead, litf, etc, complete.Platform and steps
7
-
-
Colour washing two coats with Weather proof paint over one coat of white cement primer for RMU precast structure including cost of all materials, labour, lead, lift, etc., complete. RCC Wall,Platform and steps
18
-
-
Refilling with excavated earth in layers and well consolidated as per standared specification including cost of all materials, labour, lead, lift etc., complete
4590
-
-
Transporting and cleaning the excess excavated and debris then and there immediately to avoid any hinderence to the normal flow of traffic and public beyond a distance of 5 km trem the work spot as per the direction of Engineer in charge including loading and unloadings etc., complete.
146.7
-
-
Transporting of 33 KV empty drums loading at site and devolution of empty 33 KV steel cable drum each weighting 1 to 1.5 T from various work site and balance cable if any to departmental stores.
70
-
-
Providing watch and ward (unskilled) at site as instructed by the Engineer incharge at site.
90
-
-
Bailing out water from cable french while excavating and also while laying cable using 5 HP diesel pump including cost of fuel, operator etc., complete.
60
-
-
Supply and errection of straight through Heat shrinkable outdoor type 3X400 Sq.mm Cable joint kit including cost of all materials lead ,lift, errection and testing etc., complete
70
-
-
Supply and errection of Heat shrinkable outdoor type 3X400 Sq.mm Cable termination kit including cost of all materials lead ,lift, errection and testing etc., complete
12
-
-
Supplying & Erection of double pole structure with AB switch provision for 33KV UG cable (3X400 sqmm) including cost of all materials,such as lead,lifting,fixing and termination of cables (In and Out)both ends,and commissioning etc.,
2
-
-
Casting and placing of RCC offset slab (cable route indication slab)of size 750x750x60 mm castingin RCC 1:3:6 using 12 to 20 mm HBG metal with necessary reinforcement,piling,shuttering,curing,transport from cast yard to various locations & fixing the slab along 33 KV cable. (a)Cable route marker for every 100m (engraving TANGEDCO Power cable)
3.38
-
-
(b)Cable joint location marker (engraving TANGEDCO Cable Joint)
6.75
-
-
Supply and laying of Warning tape (Yellow colour as TANGEDCO printed) of size 150mm wide and thickness P100 microns (0.1mm) as per std specifications including cost of all materials,lead,lift,labour and laying at the depth of 0.5 m below the ground level etc., complete.
9000
-
-
State High Ways Road crossing of 3x400 sq mm 33 KV UG Cable by Horizontal boring method location including cost of all materials lead ,lift, Transporting, cable laying, HDPE Pipe, Bold nuts, Materials etc, complete.( as per the direction of Highways)
30
-
-
total of slno1 to 22
1
-
-
EPF 13.00%(40% value of work portion)
1
-
-
GST 18%
1
-
-
ESI 3.25% (40% value of work portion)
1
-
-
Total
1
-
-
or say
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements