Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Eprocure
Opening Date10 Jan 2020
Closing Date29 Jan 2020
Tender Amount₹ 25,00,000
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_EB_152844_1Bid Award Id
ViewTender No
Spec.NO.14/19-20 of SE/kedc/krrTender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation of pole pit For 9 mts / 9.14 mts pole in ordinary soil Including cleaning of site (each pit) using Men or Machine(1.25 x 0.6 x 1.83m)
1
-
-
Excavation of pole pit For 9 mts / 9.14 mts pole in semi rocky soil Including cleaning of site (each pit) using Men or Machine(1.25 x 0.6 x 1.83m)
1
-
-
Excavation of pole pit For above (9.14m) poles in ordinary soil including cleaning of site (each pit) 1.25 x 0.6 x above 1.83 mtr using men or machine
1
-
-
Excavation of pole pit For above (9.14m) poles in semi rocky soil including cleaning of site (each pit) 1.25 x 0.6 x above 1.83 mtr using men or machine
1
-
-
Transporting of 7.5 mtrs / 8.00 mtrs PSC/RCC poles including R.S.Joist and Rail Poles from road side to work spot -up to 1.0K.M
1
-
-
Transporting of 7.5 mtrs / 8.00 mtrs PSC/RCC poles including R.S.Joist and Rail Poles from road side to work spot -above 1.0K.M or part thereof by using Bullock cart up to 3K.M
1
-
-
Transporting of 9.14 mtr and above poles including R.S. Joist and Rail poles from road side to work spot- upto 1.0 Km
1
-
-
Transporting of 9.14 mtr and above poles including R.S. Joist and Rail poles from road side to work spot- above 1.0 K.M or part thereof up to 3K.M
1
-
-
Erection of 7.5m x 8.0m poles [RCC / PSC] including refilling of excavated earth using men or machine
1
-
-
Erection of 30"(9.14m) RCC/9.0mtr PSC Rail pole,RS including refilling of excavated earth using men or machine
1
-
-
Erection of above 30"(9.14m) RSJ/Tubular pole including refilling of excavated earth using men or machine
1
-
-
Stay pit Excavation in ordinary soil including cleaning of site(each pit) using men or machine[0.95 x 0.6 x 1.2m]
1
-
-
Stay pit Excavation in semi rocky soil including cleaning of site(each pit) using men or machine[0.95 x 0.6 x 1.2m]
1
-
-
Erection stay set complete
1
-
-
Erection of base plate/stay plate
1
-
-
Fixing of LT 1 ph "X" Arm / LT.HT TI Fitting
1
-
-
Fixing of LT 3 ph "X" Arm
1
-
-
Fixing of 3[1/2]' V ` X ' arm
1
-
-
Fixing of 4[1/2]'/5' V 'X' arm
1
-
-
Fixing of tapping channel / guarding "X" arm
1
-
-
Fixing of 11 KV Pin insulator with pin
1
-
-
Fixing of 11 KV strain disc with hardware
1
-
-
Fixing of LT Pin insulator with pin
1
-
-
Fixing of LT Shakle with hardware
1
-
-
Fixing of Aluminium knob
1
-
-
Fixing of HT LAS [3 nos] with jumbering and earthing
1
-
-
Fixing of LT LAS [3 nos] with jumbering and earthing
1
-
-
Paving Stringing and sagging of conductor including binding of pin and proper tightment [including transport of condutor from Road side to work spot] -Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm
1
-
-
Paving Stringing and sagging of conductor including binding of pin and proper tightment [including transport of condutor from Road side to work spot] -Upto 7/3.35mm / 3.15 AAAC including PVC cable above 25 sqmm
1
-
-
Paving Stringing and sagging of conductor including binding of pin and proper tightment [including transport of condutor from Road side to work spot] -Upto 7/4.09 mm ACSR
1
-
-
Paving Stringing and sagging of conductor including binding of pin and proper tightment [including transport of condutor from Road side to work spot] -Above 7/4.09 mm ACSR & DOG conductor
1
-
-
Earthing wiring and connection including transporting of earth pipe and excavation of pit -Transformer structure earthing 10ft depth - 3 nos of pipe
1
-
-
Earthing wiring and connection including transporting of earth pipe and excavation of pit -DP earthing including all works [double side earthing]
1
-
-
Earthing wiring and connection including transporting of earth pipe and excavation of pit -Erection of 4th Earth pipe including earthing
1
-
-
Earthing wiring and connection including transporting of earth pipe and excavation of pit -Earthing of poles
1
-
-
Earthing wiring and connection including transporting of earth pipe and excavation of pit -Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub.
1
-
-
Erection of Double Pole DT Structure Complete-Erection Top Channel
1
-
-
Erection of Double Pole DT Structure Complete-Bed Channel [2 nos channel]
1
-
-
Erection of Double Pole DT Structure Complete-Cross with stud for bed channel
1
-
-
Erection of Double Pole DT Structure Complete-Erection of belting angle
1
-
-
Erection of Double Pole DT Structure Complete-Erection of HG fuse angle
1
-
-
Erection of Double Pole DT Structure Complete-Erection of Jumpering [HT Side]
1
-
-
Transformer wiring in LT side including Jumpering Bus bar etc.
1
-
-
Erection LT open type fuse unit arrangement single / double (including jumpering)
1
-
-
Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint)
1
-
-
Colour washing of 2 numbers structure pole [excluding cost of distember / snowcem]
1
-
-
Painting of Trf.Nameplate details including cost of the sheet [1.5" x 1"] and paint
1
-
-
Painting name of SS at seating channel including paint.
1
-
-
Erection of H.G Fuse unit complete (excluding H.G Fuse Angle)
1
-
-
Erection of Cross Bacing set complete
1
-
-
Erection of AB Switch with PT insulator complete & Jumpering
1
-
-
Erection of Single pole Transformer bed structure
1
-
-
Erection of Single pole AB switch (G.O.S)
1
-
-
Erection of Single pole H.G. Fuse set
1
-
-
Painting of all clamps, other materials and painting of single pole structure (Excluding paint)
1
-
-
LT Cable arrangement for Single pole structure
1
-
-
Fixing of Danger board (Excluding board)
1
-
-
Guarding Arrangements-Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ]
1
-
-
Guarding Arrangements-Flat guarding with 4 wire
1
-
-
Guarding Arrangements-Split Netural Guarding
1
-
-
Erection of Distribution Transformer-Upto 100 KVA
1
-
-
Erection of Distribution Transformer-Above 100 KVA and Upto 250 KVA
1
-
-
Erection of Distribution Transformer-500 KVA
1
-
-
Erection of Distribution Transformer-Erection of metering set 11 KV
1
-
-
Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc.
1
-
-
Mass Concreting PCC including cost of Cost of Jelly, M.Sand and Cement, lead, lift etc., with a mixture of 1 : 3 : 6 for 9.0 Mts Square Pole with coping -For single pole structure.Concreting of size (21/2' X 21/2' X 7') (0.75X0.75 X 2.10m)
1
-
-
Mass Concreting PCC including cost of Cost of Jelly, M.Sand and Cement, lead, lift etc., with a mixture of 1 : 3 : 6 for 9.0 Mts Square Pole with coping -for double pole structure ( 2 poles ).Concreting of size(2' X 2' X 7' ) (0.75X0.75 X 2.10m)
1
-
-
Sleeve Concreting PCC including Cost of Jelly, M.Sand and Cement lead, lift,Pit Excavation etc., with a mixture of 1 : 3 : 6 with coping -For RS Joist of size(200 X 100 mm) Concreting of size 1' 1/4 X 1'3/4 X 4' (0.38X0.53X1.20m)
1
-
-
Sleeve Concreting PCC including Cost of Jelly, M.Sand and Cement lead, lift,Pit Excavation etc., with a mixture of 1 : 3 : 6 with coping -For 7.5 / 8.0 / 9.0 Mts.PSC Poles .Concreting of size (2' X 2' X 4') (0.60X0.60X1.20m)
1
-
-
Sleeve Concreting PCC including Cost of Jelly, M.Sand and Cement lead, lift,Pit Excavation etc., with a mixture of 1 : 3 : 6 with coping -For Stay rod with coping Concreting of size (1'1/4X1'1/4X2'1/2 ) (0.38X0.38 X 0.75m)
1
-
-
Painting of RS Joist for 36 feet height of size(200mm X 100mm)- Red Oxide Primer
1
-
-
Painting of RS Joist for 36 feet height of size(200mm X 100mm) - Aluminium paint
1
-
-
Painting of RS Joist for 42 feet height of size (200mm X 100mm) - Red Oxide Primer
1
-
-
Painting of RS Joist for 42 feet height of size (200mm X 100mm) - Aluminium paint
1
-
-
Fabrication Labour charge for centre support only for DT structure
1
-
-
Erection of centre support for Dt stucture [complete all works]
1
-
-
Manufacture of special type clamps for rail poles, RS Joist, Tubular poles special clamps for DT structure with materials.
1
-
-
Manufacture of special type clamps for rail poles, RS Joist, Tubular poles, special clamps for DT structure [materials supplied by board]
1
-
-
Labour charges for alteration of Back Clamp
1
-
-
Labour charges for alteration of Stay Clamp
1
-
-
Providing of holes for all size angles / channel upto 3/4"
1
-
-
Providing of holes for Slot holes in flat / angles / channel upto 3/4"
1
-
-
Cutting of RS Joist / Angles / MS Channels
1
-
-
Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC Metal Pole [ per pole ]
1
-
-
Loading of [ 9.14 mtr ] 30" poles RCC P&C Pole / Metal Pole [ per pole ]
1
-
-
Unloading of PSC / RCC / Metal Poles
1
-
-
Loading of line materials [ including staking except conductor drum and scrap material ]
1
-
-
Unloading of line materials [ including staking except conductor drum and scrap material ]
1
-
-
Loading of 7.5 mtr / 8.0 mtr pole grill
1
-
-
Unloading of 7.5 mtr / 8.0 mtr pole grill
1
-
-
Loading of 9.14 mtr / 9.0 mtr pole grill
1
-
-
Unloading of 9.14 mtr / 9.0 mtr pole grill
1
-
-
Loading of conductor drum of all sizes [ with out ramp ]
1
-
-
Unloading of Counductor drum of all sizes [ without ramp ]
1
-
-
Loading of scrap materials
1
-
-
Unloading of scrap materials
1
-
-
Loading Stay plate /Base Plate
1
-
-
Unloading of stay plate /Base plate
1
-
-
Loading / Unloading of DT upto 100 KVA with or without crane
1
-
-
Loading / Unloading of DT upto 250 KVA with or without crane
1
-
-
Loading / unloading of DT upto 500KVA with or without crane
1
-
-
TRANSPORT OF LINE MATERIALS[Transport of line Materials [ minimum 1 MT / DT ] [ minimum 1 No ] metering set [ minimum 1 no ] from sub stores to section pocket or to near then work spot at road side by using private vehicle other than bullock cart or vice versa excluding loading and unloading if Dept.vehicle not available.]-Upto 30 kms
1
-
-
TRANSPORT OF LINE MATERIALS[Transport of line Materials [ minimum 1 MT / DT ] [ minimum 1 No ] metering set [ minimum 1 no ] from sub stores to section pocket or to near then work spot at road side by using private vehicle other than bullock cart or vice versa excluding loading and unloading if Dept.vehicle not available.]-Above 30 kms and for every addl.1KM
1
-
-
Transport of line meterials from section pocket store to near work spot by using bullock cart or vice versa.
1
-
-
Dismantling of 7.5m x 8.0m poles [RCC / PSC] including refilling of excavated earth using men or machine
1
-
-
Dismantling of 30"(9.14m) RCC/9.0mtr PSC Rail pole,RS including refilling of excavated earth using men or machine
1
-
-
Dismantling of 30"(9.14m) RSJ/Tubular pole including refilling of excavated earth using men or machine
1
-
-
Dismantling of stay set
1
-
-
Dismantling of LT 1 ph "X" Arm / LT.HT TI Fitting
1
-
-
Dismantling of LT 3 ph "X" Arm
1
-
-
Dismantling of 3[1/2]' V ` X ' arm
1
-
-
Dismantling of 4[1/2]'/5' V 'X' arm
1
-
-
Dismantling of tapping channel / guarding "X" arm
1
-
-
Dismantling of 11 KV Pin insulator with pin
1
-
-
Dismantling of 11 KV strain disc with hardware
1
-
-
Dismantling of LT Pin insulator with pin
1
-
-
Dismantling of LT Shakle with hardware
1
-
-
Dismantling of Aluminium knob
1
-
-
Dismantling of HT LAS [3 nos] with jumbering and earthing
1
-
-
Dismantling of LT LAS [3 nos] with jumbering and earthing
1
-
-
Dismantling of Conductor upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable up to 25 sqmm
1
-
-
Dismantling of Conductor upto 7/3.35 mm /3.15 AAAC including PVC cable up to 25 sqmm
1
-
-
Dismantling of Conductor upto 7/4.09 mm ACSR
1
-
-
Dismantling of Conductor above 7/4.09 mm ACSR & DOG conductor
1
-
-
Dismantling of DT - Upto 100 KVA
1
-
-
Dismantling of DT - Above 100 KVA and Upto 250 KVA
1
-
-
Dismantling of DT - 500 KVA
1
-
-
Dismantling of metering set 11 KV / 33 KV
1
-
-
Releasing and erection 1 ph SC wire [during conductor or support]
1
-
-
Releasing and erection 3 ph SC wire [during conductor or support change]
1
-
-
Destruction of pole concerting at site.
1
-
-
Retrieving grill from detoriated pole [grill separate from damaged pole]
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements