Tamil Nadu Generation And Distribution Corporation Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Eprocure
Opening Date19 Feb 2025
Closing Soon4 Mar 2025
Tender AmountRefer Documents
Costs
EMD
₹ 9,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Ttps Operation Circle Mpm Ii Acp Stage I, Ii Iii Attending Break Down Works In Ac Plant Unit I To V, Switch Yard Compressors Etc. For A Period From 01.04.2025 To 31.03.2026
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_EB_526186_1Tender No
CE/SE/O/TTPS/Spec.No.38/25-26Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
TTPS Operation Circle MPM II ACP Stage I, II III Attending break down works in AC plant Unit I to V, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
TTPS Operation Circle MPM II ACP Stage I, II III Attending break down works in AC plant Unit I to V, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
BOQ Items
... More
Charges for overhauling the Unit IV & V Kirloskar compressor [14 cylinder reciprocating open type direct coupled compressor] Capacity: 120 Ton compressor by decoupling of the compressor from motor, removing the compressor both side end cover, cylinder head covers, crank shaft assembly after removing oil pipe lines, piston assembly, connecting rod assembly, oil pump assembly, replacing/renewing the worn out parts, reassembling all the parts in compressors after checking the clearance of the piston reeds in cylinder and correct movement of the piston in cylinders, topping up the oil level, conducting leak test and commissioning as per the direction of engineer in charge.
2
-
-
... More
Charges for cleaning of expansion valves, liquid line filters if any chocking noticed in air handling units. Removing the expansion valves, liquid line filters, admitting nitrogen gas for cleaning the liquid line, filters and expansion valves and re-fixing in liquid lines, leak testing and commissioning.
8
-
-
... More
Material Cost:[Contractor’s Scope]
Expansion valve 5Ton capacity make: Donfoss / equivalent inlet 3/8” outlet 5/8”
2
-
-
... More
Charges for transporting the R22 gas cylinders from stores/ pocket stores to site. Attending gas leak, if any suspected in AC compressors & air handling units, arresting gas leaks in refrigerant gas & liquid lines and charging of gas in AC plant equipments at Stage I, II & III. [Charges including adopters for gas cylinders and other consumables]
24
-
-
... More
Charges for decoupling of the compressor from motor, removing the head covers, draining the oil from compressor, renewing the damaged parts like pistons/ discharge valve assembly /suction reeds, re-assembling the removed parts, topping-up of oil / leak testing and commissioning at Units I to V and switch yard AC compressors.
4
-
-
... More
Charges for changing of new/old (tested) pressure gauges [LP/OP/HP] in compressors due to failure [or] damage, leak testing of gas, leak arresting if any and commissioning.
8
-
-
... More
Charges for replacement of failed 5 Ton capacity compressor in packaged AC units by new / re-operated compressor in the event of any failure, flushing the suction and discharge gas lines with nitrogen gas, Brazing the gas line with the compressor. Complete assembling work, leak testing, leak arresting (if any) and commissioning at ESP I to III, Conference hall, Service building, DCS I & II Packaged AC units.
4
-
-
... More
Charges for the replacement/renewing of copper tubes, ferrules, flare nuts etc., if any puncture in copper tubes, failure of flare nuts were observed. The cost includes leak testing and commissioning of packaged AC units at ESP I to III, Conference hall, Service building, DCS I & DCS II AC Plant.
4
-
-
... More
Charges for dismantling the ‘V’ belt, removing all filters from fixing frames, dismantling the filters fixing frames, supply air dampers if necessary, opening the AHU casing on either side and top, to facilitate to inject the de-scaling compound on the cooling coil. After completion of works reassembling the AHU casing, filter fixing frames, arresting of air leaks, fixing of ‘V’ belts and aligning, re- fixing of all filters in fixing frames and commissioning of AHUs at Unit I to V, Switchyard I & II and UPS-V as per the direction of Engineer-in-charge.
14
-
-
... More
Charges for applying the chemical compound in between the fins and outer surface of cooling coil by hand pump to inject the compound deeply inside the fins and tubes to soak scaling particles and loosen the deposits & scales from surface of fins and tubes, servicing the coil with water by compressor pump repeatedly to complete removal of the scaling of Air handling units at Units I to V, Switch yard I & II and USP – V as per the direction of Engineer-in-charge.
14
-
-
... More
Material Cost:[Contractor’s Scope]
DE-Scaling Compound
40
-
-
... More
Charges for dismantling the diffusers and return air grills from false ceiling, cleaning, painting and re- fixing, fixing in the false ceiling of control rooms at unit I to V, ESP I to V, Conference hall, Service building, Switchyard I & II, DCS I & II and UPS V.
100
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user