Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 Sep 2023
Closing Date26 Sep 2023
Tender Amount₹ 6,45,334 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
TTPS Operation Circle MPM II ACP Reconditioning of blower assembly by renewing of air intake vane assemblies and newly provide air damper etc and commissioning of the blower B at Fan House Unit III
TTPS Operation Circle MPM II ACP Reconditioning of blower assembly by renewing of air intake vane assemblies and newly provide air damper etc and commissioning of the blower B at Fan House Unit III
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Charges for providing necessary supports at both sides of the blower shaft, dismantling the plummer block assembly, bearing assembly and air intake vane assembly etc. after cutting and removing of the supporting frames at both sides of the blower shaft, lifting the materials by using chain blocks if necessary scaffolding arrangements should be made and the materials should be kept at out side of the blower room as per the direction of the Engineer-in-charge. (All consumables, T&P hire charges under Contractor's Scope)

1

-

-

... More
Charges for dismantling the front, top, side casing covers by cutting & removing of the bolt & nut, for lifting of the blower impeller assembly at Fan House 'B' at Unit III as per the direction of Engineer-in-charge. (All consumables, T&P hire charges under contractor's scope)

1

-

-

... More
Charges for cutting & removing the existing erroded Air duct (size 2.0 X 1.5 x 1.5) mtr. and if necessary scaffolding arrangement should be made, lifting and moving the outside of blower room as per direction of the engineer-in-charge.(All consumables, T&P hire charges under contractor's scope)

10.5

-

-

... More
Charges for transportation of the Taper lock bushes of Fly wheel Qty. 1No. make: Fenner bush size 5050 from TTPS to workshop at town, enlarging the bore from pilot bore and also providing the keyway in the Taper lock bushes as per the sample, transporting back to TTPS for fixing in the shaft of the centrifugal fan & motor at Fan House Unit III Blower ‘B’. (All consumables, T&P hire charges under contractor's scope) [Fly wheel supplied by board]

1

-

-

... More
Charges for transportation of the Taper lock bushes of motor pulley Qty. 1No. make Pix size 3535 from TTPS to workshop at town, enlarging the bore from pilot bore and also providing the keyway in the Taper lock bushes as per the sample, transporting back to TTPS for fixing in the shaft of the centrifugal fan & motor at Fan House Unit III Blower ‘B’. (All consumables, T&P hire charges under contractor's scope) [motor pulley supplied by board]

1

-

-

... More
Charges for re-assembling of air intake vane assemblies supporting frames, plummer block assemblies at both sides by using lifting arrangements, chain block etc.(if necessary cutting & welding of frames)fixing properly, tightening of the bolt & nuts after the proper aligning of supporting frames, plummer block assembly as per the direction of Engineer-in-charge [T&Ps and consumables under contractor’s scope]

1

-

-

... More
Charges for fabrication and erection of Discharge Air Duct Size (2.0 + 1.5 ) legnth 1.5 by 1mm G.I Sheet and frame by (40 x 40)mm angle and fixing the existing blower ‘B’ through bellows in Unit III Fan House. The rates include T & P hire charges and necessary consumables etc. [1mm thick GI Sheet will be supplied under Contractors Scope]

1

-

-

... More
Material cost Contractor scope MS Angle size 40x40thick 3mm

0.04

-

-

... More
Material cost Contractor scope GI sheet std size 2.5x 1.25 thick 1mm

0.12

-

-

... More
Charges for loading & unloading the air damper approximate weight 300Kg size(2000 x 1080)mm from pocket / Central Store to Fan House III blower room and lifting & moving damper assembly to fix the blower assembly 'B' after providing the 10mm hole in face side of the damper and blower as per the direction of engineer in charge

1

-

-

... More
Charges for fixing the new self aligned double row taper lock bearings No.1318K with sleeve and lock washer to both side of the blower shaft and checking the tightness as per the direction of Engineer-in-charge. [T&Ps and consumables under contractor’s scope]

1

-

-

... More
Charges for lifting the shaft with impeller assembly and keeping at plummer block assembly, checking the bearing at both sides after aligning and tightening of the plummer block assembly, greasing packing of the bearing, checking the free rotation of the impeller assembly, testing of the all bolts & nuts as per the direction of Engineer-in-charge. [T&Ps and consumables under contractor’s scope].

1

-

-

... More
Charges for fabrication of 4Nos blower front cover by MS sheet thickness 3.15mm (size:2mtrx500mm)by fixing (40x40x4mm) angle in top & bottom of the front cover and 6mm holes providing in the both sides and top & bottom of the L angle as per the sample as per the direction of engineer in charge.(The rates includes consumables, T&P and materials)

4

-

-

... More
Fabrication of 1No inspection door size (800x500m) by MS plate 3.15mm with 6mm holes all sides and fixing in the side of the blower cover after providing the opening as per the direction of engineer in charge. (The rates includes consumables, T&P and materials)

1

-

-

... More
Charges for re-assembly of the front, top, side casing cover by fixing properly tightening of the bolts & nuts of necessary cutting & welding as per the direction of engineer-in-charge. (The consumables, bolt & nuts under contractor’s scope)

1

-

-

... More
Charges for conducting the static balancing test on blower 'B' assembly at Unit III Fan House [T&Ps and consumables with contract scope].

1

-

-

... More
Charges for re-assembling Fly Wheel [Approximate weight 300Kg] 27KW motor shifting to new fabricated motor bed (App 500kg) by using the chain blocks and fixing the motor pully and renewing the 'V' belt and aligning motor and re termination of power cable testing & commissioning of blower ‘B’ centrifugal fan Model No.9.5 LLD at Fan House Unit III.

1

-

-

... More
Charges for fabrication & erection of new air duct size (0.5 x 0.5)mtr length 5mtr by GI sheet of 0.63mm thickness after removing the damaged / eroded portion in the fan house III air duct line leading to feed pump shift operator room of 4.5mtr Turbine floor area and also new air duct size 0.5 x 0.5 mtr length 52mtr by 0.63 thickness GI sheet at Unit II LT & HT maintenance office room (G.I sheet under Contractor's Scope) as per the direction of engineer in charge. The rate including T&P hire charges etc.,

22

-

-

... More
Contract scope material GI Sheet size(2 x 1)mtr thick 0.63mm (11 nos)

0.11

-

-

... More
Charges for cutting & removing the 20Nos. (Length:4.6m) corroded portion of filter fixing frames and renewing of filter fixing frames by welding at the existing channels in Unit III Fan house, providing additional supports for the filters fixing frames as per the direction of engineer in charges. (Filter fixing frames, other consumables T&P hire charges under contractor’s scope)

20

-

-

... More
Material cost Contractor scope Filter fixing frame (size Legnth 4.6 mtr Width 60 mm material GI)

20

-

-

... More
Charges for painting two coats enamel paint after cleaning the rusted area of centrifugal fan B in Fan house Unit III and newly erected air duct. (The rates including enamel paint wire brushes and other consumables, scaffolding arrangements under contractor’s scope)

98

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.