Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date25 Jun 2024
Closing Date26 Jul 2024
Tender Amount₹ 42,46,850
Costs
EMD
₹ 20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_457390_1Tender No
016/24-25 DT 21.06.2024.Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation of pit in Hard rock requires without blasting(where houses are located)
50
-
-
Erection of RCC poles/PSC Poles /metal poles upto 27'(8.0m) pole by using JCB or manual
300
-
-
Erection of RCC poles/PSC Poles/metal poles above 8 mtrs pole by using JCB or manual
200
-
-
Erection of RSJ ,Rail and fabricated poles above 9.0m pole by using JCB or manual
100
-
-
Erection of stay set complete
200
-
-
Fixing of HT "V" cross arms (all types)/Channel cross arms/Guarding Cross arms
250
-
-
Fixing of LT 3 phase cross arms
500
-
-
Fixing of LT Single phase ph X arm
300
-
-
Fixing of HT/LT TI fittings
300
-
-
Fixing of HT Pin insulator 11 KV/22 KV
600
-
-
Fixing of HT Pin insulator 33 KV
100
-
-
Fixing of HT 11KV strain Disc
500
-
-
Fixing of HT 22KV strain Disc
500
-
-
Fixing of LT pin insulators
2000
-
-
Fixing of LT shackle with MP
2000
-
-
Fixing of Aluminium Knob
750
-
-
Earthing of pole with pin including burying ,looping and binding
250
-
-
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/4.09 mm
5
-
-
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/3.35 mm or AAAC 7/3.15 mm conductor
25
-
-
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/2.59 mm or AAAC 7/2.50mm conductor
50
-
-
Structure Concreting , Concreting of poles with size (2'x2'x6') including cost of Cement ,jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2
10
-
-
Sleeve concreting with size (2'x2'x3') including cost of excavation Cement ,jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials
25
-
-
Stay concreting of Stay with Size 1.5' X 1.5' X 3.0' including cost of 40mm Cement,Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2.
25
-
-
ERECTION of Double Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6'(2*475), erection of poles(2*550), Excavation of Stay pits (4*390) and Erection of stay set (4*210), erection of structure materials (Top Channel-Rs.250, Bed Channel-Rs.250,Cross with stud for bed Channel-Rs.120, Belting Angle-Rs.250) erection of AB switch (Rs.1000), HG Fuse (Rs.600) Structure Earthing complete (Rs.2100), Fixing of Open Type fuse units and feeder arrangements(Rs.900), HT/LT LAS fixing(Rs.350 and Rs.250) , Provision of bus-bar arrangement(Rs.500), Jumpering(Rs.400) Fixing of support inculator angle and erection of of 3 Nos pin insulators ( Rs.200) ( all T&P suchas crowbars, siling, DShackle etc., that must be brought by the contractor)(Labour for Structure Concreting, Stay Concreting,Painting, Fixing of name board / Danger Board, Erection of transformer, Transporting of Transformer , Fixing of DT meter ,Drilling of holes, Cutting,welding,alteration of clamps if anyand Provision of Earth pit collars are separately given).
25
-
-
Dismantling of double pole Transformer structure complete- inclusive of following dismantling work pole 2Nos,stay pit 4 Nos, stay 4set,structure materials , AB switch, HG fuse set e, Structure earthing complete,earth pits ,earth tubs ,earth pipes,feeding arrangements with open type fuse unit,HT/LT LAS ,jumbers complete,support insulator,LTbus bar arrangements and danger board.( May be claimed seperately for any extra works)(all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor)
5
-
-
Erection of Double Pole structure (D.P)- inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6'(2*475), erection of poles(2*550), Excavation of Stay pits (4*390) and Erection of stay set (4*210), erection of structure materials (Top Channel-Rs.250) erection of AB switch (Rs.1000), Structure Earthing complete (Rs.1500), HT LAS fixing(Rs.350 ) , Jumpering (Rs.250) (all T&P suchas crowbars, siling, DShackle etc., that must be brought by the contractor)(Labour for Structure Concreting, Stay Concreting,Painting, Fixing of name board/Danger Board, (Drilling of holes, Cutting,welding,alteration of clamps if anyand Provision of Earth pit collars are separately given)
10
-
-
Dismantling of double pole structure (D.P)complete inclusive of following dismantling work- poles, stay set complete,structure materials , AB switch, Structure earthing complete,earth pits ,earth tubs ,earth pipes,HT LAS ,jumbers complete,support insulator and danger board.( May be claimed seperately for any extra works) (all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor)
2
-
-
Erection of Single pole Transformer Structure-inclusive of following works - Excavation of pole pit sizing 2' X 2' X 6'(1*475), erection of poles 1*550), Excavation of Stay pits (1*390) and Erection of stay set (1*210), erection of structure materials (Tapping Channel-Rs.150, Transformer centre set arrangements-Rs.350) erection of AB switch (Rs.900), HG Fuse (Rs.400) Structure Earthing complete (Rs.2000), Fixing of Open Type fuse units and feeder arrangements(Rs.450), HT/LT LAS fixing(Rs.350 and Rs.250) , Jumpering(Rs.300) (all T&P suchas crowbars, siling, DShackle etc., that must be brought by the contractor)(Labour for Structure Concreting, Stay Concreting,Painting, Fixing of name board/ Danger Board.Erection of transformer,transporting of transformer, LT cable arrangements, fixing of DT meter. Drilling of holes, Cutting,welding,alteration of clamps if anyand Provision of Earth pit collars are separately given)
10
-
-
Dismantling of Single pole transformer structure complete -inclusive of following dismantling works - Pole, stay,structure materials ( tapping channel, transformer bed structure) , AB switch , HG fuse,structure earthing complete with 3 pits and earth loops, MCD box, HT/LT LAS, HT jumpers complete, LT cable arrangement and danger Board..( May be claimed seperately for any extra works) (all T&P such as crowbars,silling, Dshackle etc that must be brought by the contractor)
5
-
-
Guarding arrangements with Flat guarding including fixing of 2Nos. Cross arms HT/LT
45
-
-
Transport of poles/Materials/ conductors /DT/Metering Set and other materials( excluding loading and unloading charges.) below 8 Kms
100
-
-
Transports of poles /Materials /Conductors and other materials(excluding loading and unloading charges) for above 8 Kms for addl. Kms( Irrespective of weight in Tonage/KM
2000
-
-
Loading of metal poles ( all sizes)
200
-
-
Loading of poles up to 8 M RCC/PSC poles
300
-
-
Loading of poles above 8 m RCC/PSC poles
200
-
-
UnLoading of poles up to 8 M RCC/PSC poles
300
-
-
UnLoading of poles above 8 M RCC/PSC poles
200
-
-
Unloading of metal poles ( all sizes)
200
-
-
Transporting of poles from road side to pole pit Location including loading and unloading of poles by using JCB or Manual Up to 100 m
150
-
-
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual above 100 m
225
-
-
Loading or unloading of Transformer upto 100 KVA and Metering set
50
-
-
Loading or unloading of Transformer above 100 KVA and up to 200 KVA
30
-
-
Loading or unloading of Transformer above 200 KVA
30
-
-
Resagging of HT/LT line with ACSR 7/4.09mm
1
-
-
Re-sagging of HT / LT line with ACSR 7/3.35mm or AAAC 7 /3.15 mm conductor
15
-
-
Re-sagging of HT / LT with ACSR 7/2.59mm or AAAC 7 /2.50 mm conductor
25
-
-
Erection of street light including fixture fitting
75
-
-
Erection of street light service
50
-
-
Agriculture service fixing/service
25
-
-
Releasing of grills from RCC poles
100
-
-
Releasing of HTS wire from PSC pole
100
-
-
Erection of new transformer for all capacities and HT metering set
50
-
-
Releasing of single phase service wire and re-fixing.
375
-
-
Releasing of 3 phase service wire (upto 50 HP) and re-fixing.
250
-
-
Releasing of 3 phase service wire (above 50 HP) and re-fixing.
25
-
-
Labour charges for alteration of Back clamps to suit for the works
250
-
-
Labour charges for alteration of Stay clamps to suit for the works
125
-
-
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
25
-
-
Cutting of coconut leaves /per tree
500
-
-
Cleaning of branches of tree per tree
500
-
-
Drilling of hole in channel only 3/4" & 1" per hole
2000
-
-
Cutting of flat
150
-
-
Cutting of channel
100
-
-
Cutting of Angle
100
-
-
Cutting of pipe
50
-
-
Dismandling of pole above 8.0 mtr
50
-
-
Dismandling of pole up to 8.0 mtr
150
-
-
Dismandling of 'V' X arm(all types),channel X arm,guarding X arm
50
-
-
Dismandling of LT 3 phase X arm
250
-
-
Dismandling of LT single phase X arm
150
-
-
Dismandling of HT/LT TI fitting
50
-
-
Dismandling of 11KV strain disc
100
-
-
Dismandling of 11 KV/22KV pin insulator
150
-
-
Dismandling of 33 KV pin insulator
50
-
-
Dismandling of LT shackle
750
-
-
Dismandling of LT pin insulator
500
-
-
Dismandling of Aluminium knob
250
-
-
Dismandling of stay set
150
-
-
Dismandling of ACSR 7/3.35mm orAAAC 7/3.15 conductor
15
-
-
Dismandling of ACSR 7/2.59mm or 7/2.11mm conductor
50
-
-
Dismandling of street light service
50
-
-
Loading of materials
50
-
-
Unloading of materials
50
-
-
Leading and stacking of materials
50
-
-
Dismandling of MVL/SVL fitting
15
-
-
Dismandling of 1x40w FTL fitting
25
-
-
Provision of Earth pit collar
50
-
-
Fixing of Danger Board
50
-
-
Painting of all clamps and other materials and painting of structure pole for double pole structure.
20
-
-
Painting of all clamps and other materials and painting of structure pole for single pole structure
20
-
-
Painting of all clamps and other materials and painting of structure pole for DP structure
10
-
-
Base concreting of transformer structure
100
-
-
LT cable arrangements
10
-
-
Provision of Distribution Transformer Name Board, ( Name of the 22/11 KV feeder , Name of the SS , Capacity of the DT).
50
-
-