Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date5 Oct 2024
Closing Date21 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Running Works Contract For Effecting Various Works For A Period Of Six Months In Sattur Section

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Loading & Unloading of RS Joists, tubular & rail poles (above 9.14m)

10

-

-

... More
Transporting of poles from road side to Work spot 7.32m, 7.5m, 8m, 8.23m RCC poles/km

40

-

-

... More
Transporting of poles from road side to Work spot9m, 9.14m RCC poles, RS Joists, tubular & rail pole/km

40

-

-

... More
Excavation of pole pit (1.25m * 0.5m*1.5m)in Normal Ground

35

-

-

... More
Erection

35

-

-

... More
Excavation of pole pit (1.25m * 0.5m*1.5m) in Rocky Ground

5

-

-

... More
Erection

5

-

-

... More
Excavation of pole pit (1.25m * 0.6m*1.83m) in Normal Ground

30

-

-

... More
Erection

30

-

-

... More
Excavation of pole pit (1.25m * 0.6m*2.19m) in Normal Ground

10

-

-

... More
Erection

10

-

-

... More
Concreting of poles as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete.

80

-

-

... More
Coping of poles

10

-

-

... More
Coil earthing per pole & pole earthing

60

-

-

... More
Excavation of stay pit (1.00m * 0.5m*1.5m)

30

-

-

... More
Erection

30

-

-

... More
Fixing of V cross arm, Channel cross Arm4 1/2'

5

-

-

... More
Fixing of V cross arm, Channel cross Arm3 1/2'

35

-

-

... More
Fixing of LT Three phase cross arm

25

-

-

... More
Fixing of LT single phase cross arm

25

-

-

... More
Fixing of HT / LT TI fitting

40

-

-

... More
Fixing of Tapping channel cross arm

10

-

-

... More
Erection of HT Side arm with stud

10

-

-

... More
Erection of LT Side arm with stud

15

-

-

... More
Fixing of Guarding Cross Arm

10

-

-

... More
Stringing, Sagging, binding including transporting of materials from road side to site For 7/4.09 ACSR (per span/wire)

40

-

-

... More
Stringing, Sagging, binding including transporting of materials from road side to site For 7/3.35 ACSR or 7/3.15 AAAC

40

-

-

... More
Stringing, Sagging, binding including transporting of materials from road side to site For 7/2.59 ACSR or 7/2.50 AAAC

130

-

-

... More
Resagging of LT & HT. line of all sizes

100

-

-

... More
Spilt Neutral Guarding

5

-

-

... More
Flat Guarding (2 wires)

5

-

-

... More
Flat Guarding (4 wires)

5

-

-

... More
Fixing of one earthing device

10

-

-

... More
Erection/ Dismantling of Transformer Upto 150 KVA

8

-

-

... More
Erection/ Dismantling of Transformer 250 KVA

2

-

-

... More
Erection of centre support for 250 KVA DT (Including concrete)

2

-

-

... More
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder

10

-

-

... More
Bus bar arrangement with open type

10

-

-

... More
Loading and Unloading of distribution transformer Below 250 KVA

8

-

-

... More
Loading and Unloading of distribution transformer 250 KVA

2

-

-

... More
Loading & Unloading of all sizes of DT using private Crane vehicle

10

-

-

... More
i)Loading /Un loading of Metering Set

2

-

-

... More
ii)Erection / dismantling of Metering Set

2

-

-

... More
Changing of pin point to cut point LT

10

-

-

... More
Changing of pin point to cut point HT

10

-

-

... More
Single Phase service connection

55

-

-

... More
Three Phase service connection

30

-

-

... More
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,

15

-

-

... More
Dismantling of poles without concrete in damaged condition including grill separation etc.,

25

-

-

... More
Dismantling of 7.5Mtr /8Mtr PSC & Pole

15

-

-

... More
Dismantling of 9.14Mtr RCC Pole and above

10

-

-

... More
Dismantling of stay with guy shackle complete

10

-

-

... More
Replacement of detoriated stay rod

30

-

-

... More
Dismantling of 3.5' V cross arm and channel cross arm

10

-

-

... More
Dismantling of 4.5' and 5' V cross arm

10

-

-

... More
Dismantling of TI Fitting

15

-

-

... More
Dismantling of Single phase/ 3 phase cross arm

15

-

-

... More
complete replacement of worn out earth wire per structure

10

-

-

... More
Tree clearance For ordinary trees and thorn bushes and trees

25

-

-

... More
Tree clearance For coconut and Palm trees

10

-

-

... More
Painting structure Pole (Colour washing with emulsion on Labour only) (Double coat)

15

-

-

... More
Painting Transformer structure (Double coat)

15

-

-

... More
For transformer only (Double coat)

15

-

-

... More
Set right of leaning of HT pole / LT pole including X arms, TI fittings

80

-

-

... More
Excavation of structure pole pits 2Nos

2

-

-

... More
Erection of structure poles 2Nos

2

-

-

... More
Transformer structure pole mass concrete (All materials including cement (Ratio 1:2:4) and coping

2

-

-

... More
Top channel

2

-

-

... More
Transformer seating channel and belting angle

2

-

-

... More
AB switch (complete)

2

-

-

... More
HG Fuse (complete)

2

-

-

... More
Jumpering

2

-

-

... More
HT LAS

2

-

-

... More
LT LAS

2

-

-

... More
Fixing of capacitor bank in Distribution Transformer with wiring irrespective of capacitor

2

-

-

... More
Excavation of 3 Nos. earth pits

6

-

-

... More
Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection

6

-

-

... More
Mason works for earth pits including material

6

-

-

... More
Spreading yard jelly and cut stone and bricks including materials

2

-

-

... More
9 mtr long RCC Pole (Square Section) complete

8

-

-

... More
Maintenance of A/B switch

65

-

-

... More
Maintenance of Single Pole Distribution Transformer and Structure complete

20

-

-

... More
Replacement of GI wire in LT cut points replaced with Lt metal parts

15

-

-

... More
Replacement of worn out AB Switch knife, checking of alignment and lubrication

5

-

-

... More
Attending H.T jumper cut

10

-

-

... More
Attending L.T jumper cut

5

-

-

... More
Replacement of H.T Disc

50

-

-

... More
Replacement of HT Pin insulator

200

-

-

... More
Replacement of L.T shackle with metal parts

20

-

-

... More
Replacement of L.T pin insulator

10

-

-

... More
Maintenance of DP Structure complete

15

-

-

... More
ப jumper provision ( including of service wire disconnection & reconnection)

50

-

-

... More
Set right of Tilted X arm

40

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.