Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date8 Aug 2024
Closing Date22 Aug 2024
Tender AmountRefer Documents
Costs
EMD
₹ 25,580Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Works Contract For The Execution Of Various Improvement And Dcw Works In Various Sections Under Nagercoil Division, Kanyakumari Edc
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_471083_1Bid Award Id
ViewTender No
KKEDC/ETW-16/2024-2025 DT 07.08.2024Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection of RCC, REC, PSC poles upto 8 mtr. Length by using crane / Manual
3
-
-
... More
Excavation of metal supports above 9 mtr. / RSJ / Rail pole / Tubular poles in rocky ground
3
-
-
... More
Erection of 36" / 42" RSJ pole by using Crane / Manual in rocky area by blasting / Manual
3
-
-
... More
Excavation of stay pit of 4.5" to 5" depth using JCB / Manual
54
-
-
... More
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc
54
-
-
... More
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeder arrangement, colour washing of RCC poles etc., Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos. Earth pits with earth trough except erection of Distribution Transfer
18
-
-
... More
Erection of 11KV single pole structure including erection of DT complete with centre support
9
-
-
... More
Erection of 11 KV single pole structure including erection of DT complete without centre support
7
-
-
... More
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., with 11KV AB switch using all types of poles of sizes 9.14 m and above length
6
-
-
... More
Fixing of tapping channel X arm
44
-
-
... More
Fixing of V X arm 3.5 feet
45
-
-
... More
Fixing of 11KV V X arm 4.5"
64
-
-
... More
Fixing of Guarding X arm
19
-
-
... More
Fixing of three phase X arm
42
-
-
... More
Fixing of single phase X arm
52
-
-
... More
Fixing of HT / LT TI fittings
123
-
-
... More
Fixing of HT side arm set with stud
8
-
-
... More
Fixing of Aluminium knob
50
-
-
... More
Fixing of HT / LT pin insulator
626
-
-
... More
Fixing of LT shackle
127
-
-
... More
Fixing of HT strain disc 11KV
296
-
-
... More
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
109
-
-
... More
Sleeve concreting of pole with 1:4:8 mix using 40 mm jelly including curing (Materials + Labour)
88
-
-
... More
Mass concreting with 1:4:8 mix using 40 mm jelly including curing (Materials + Labour)
16
-
-
... More
Paving and Stringing of conductors of sizes upto 7/2.59 mm ACSR conductor or other equivalent conductor
3.21
-
-
... More
Paving and Stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35 mm ACSR or other equivalent conductor
6.82
-
-
... More
paving and Stringing of conductors of 7/4.09 mm ACSR or other equivalent conductor
8.8
-
-
... More
Dismantling of V X arm 3.5"
7
-
-
... More
Dismantling of Guarding X arm
2
-
-
... More
Dismantling of Tapping channel Cross arm
3
-
-
... More
Dismantling of three phase X arm
11
-
-
... More
Dismantling of single phase X arm
6
-
-
... More
Dismantling of aluminium knob
29
-
-
... More
Dismantling of HT TI fitting
6
-
-
... More
Dismantling of HT / LT pin insulator
182
-
-
... More
Dismantling of HT Disc metal parts
90
-
-
... More
Dismantling of LT shackle
22
-
-
... More
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
18
-
-
... More
Dismantling of Distribution Transformer including loading of Distribution transformer above 25 KVA to 100 KVA
1
-
-
... More
Dismantling of DP structure with stay as per TNEB standared including dismantling of top channel, cross bracing, concreting with 11 KV AB switch using all types of poles of sizes 9.14 mtr. And above length
3
-
-
... More
Dismantling of 11KV single pole structure including dismantling of DT complete without centre support
3
-
-
... More
Dismantling of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor
7.74
-
-
... More
Dismantling of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35 mm ACSR or other equivalent conductor
0.32
-
-
... More
Dismantling of 9.14 mtr. RCC pole including the closing of the pit
9
-
-
... More
Dismantling of Tubular pole including the closing of the pit
2
-
-
... More
Dismantling of pole REC, RCC, PSC pole upto 8 mtr. Length
46
-
-
... More
Dismantling of stay set complete including stay clamp, stay shackle binding etc
10
-
-
... More
Making of slotted holes
782
-
-
... More
Dismantling and Re paving and restringing of 7/2.50 mm AAAC conductor
3.05
-
-
... More
Dismantling and repaving and restringing of conductors of sizes upto 7/2.59 mm ACSR other equivalent conductor
10.65
-
-
... More
Dismantling and repaving and restringing of conductors of ACSR 7/3.35 mm conductor
0.1
-
-
... More
Dismantling and repaving and stringing of conductor of 7/4.72 mm Dog conductor or other equivalent conductor
0.1
-
-
... More
Dismantliing and refixing of V X arm 3.5"
1
-
-
... More
Dismantling & re Erection of V cross arm 4.5"
9
-
-
... More
Dismantling and reerection of single phase X arm
56
-
-
... More
Dismantling and reerection of three phase X arm
51
-
-
... More
Dismantling and reerction of HT/LT TI fittings
9
-
-
... More
Dismantling and reerection of Aluminium knob
31
-
-
... More
Dismantling and reerection of HT tapping channel
4
-
-
... More
Dismantling and refixing of LT shackle
134
-
-
... More
Dismantling and refixing of HT pin insulator with pin 11KV and LT pin insulator
111
-
-
... More
Dismantling and reerection of single phase service wire
78
-
-
... More
Dismantling and reerection of three phase service wire
16
-
-
... More
Dismantling and reerection of tube light erected in complete set
18
-
-
... More
Dismantling and reerection of sodium vapour lamp erected in complete set
1
-
-
... More
Dismantling and rerection of street light switching point arrangement
1
-
-
... More
Loading or unloading of 16KVA upto 63 KVA DT
10
-
-
... More
Loading or unloading of Distribution Transformer above 63 KVA Transformer
3
-
-
... More
Loading and unloading of various sizes of poles REC, RCC, PSC pole above 8 mtr. Length
170
-
-
... More
Loading and unloading of various sizes of poles REC, RCC, PSC pole upto 8 mtr. Length
19
-
-
... More
Loading and unloading of line materials
91
-
-
... More
Fixing of 2 Nos tapping channel with cut point upto 33KV Line including fixing of Disc, insulator, and jumpering etc.
8
-
-
... More
Fixing of Tapping channel X arm per cut point upto 33KV line including fixing of Discs, insulator and jumpering etc.
1
-
-
... More
Providing Jumpering at cut point
42
-
-
... More
Erection of street light switching point arrangement
3
-
-
... More
Metering Box DT Erection SMC
3
-
-
... More
Plinth Work For 500 KVA Dt with construction material
2
-
-
... More
Labour charges for ordinary tree clearance and throng bushes & trees
108
-
-
... More
Transporting of Distribution Transformer / line materials and conductors from store to site and released materials from site to store
54
-
-
... More
Transporting of all types and sizes of poles and other associated materials from road side to pole pit upto 2 KM
178
-
-
... More
Transporting of all types and sizes of poles and other associated released materials devoluated to store