Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Machinery and Tools
Eprocure
Opening Date18 Jun 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 2,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_455168_1Bid Award Id
ViewTender No
OT 61 Instrument Air CompressorTender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Overhauling of Inter coolers, after cooler and Oil cooler including hydraulic testing of Tube nests.
2
-
-
Assembling of HP & LP cylinders, Air outlet headers, coolers, Fixing V-Belts and alignment of flywheel with motor pulley.
1
-
-
Renewal of worn-out Bearing ring and Piston rod in HP / LP piston Assembly, if Necessary.
2
-
-
Cleaning of pistons & piston assemblies, reassembling HP & LP piston assemblies with renewed gland packings, Oil scrapper rings & retaining rings, cleaning primary & secondary oil filters and overhauling of oil pumps etc.,
1
-
-
Removal of HP and LP suction and Delivery valve cover plates Stud by Thread Cleaning and Tapping of all the studs of main body & Cleaning and Tapping of thread in HP,LP cylinder Assembly and cooler assembly.
1
-
-
Dismantling, overhauling and assembling of suction and delivery valves -17 Nos.
1
-
-
Charges for recording the critical dimensions, replacement of the damaged parts if required in the crank case and crosshead assemblies & then assembling the other parts like bearings, crank shaft, connecting rod, water, oil pump & its assemblies and flywheel etc., and setting the critical diamensions to the required level as per the site conditions.
1
-
-
Cleaning and painting of compressors by 2 coats of enamel paint on compressor and two coats of oil resistant paint on pedestal (Including charges for consumables like Enamel / oil resistant paint, kerosene, Gada cloth etc.,)
25
-
-
Cleaning of Air Suction filter, renewal of lub oil, replacement of Cooling water flexible hoses and damaged pipe lines, insulation of HP Air outlet header etc., and assisting for commissioning of compressor.
2
-
-
Removing of 'V' Belt, Blower pulley and dismantling of Blower Suction and Delivery connection, safety valve NRV etc.
1
-
-
Dismantling and removing of DE and NDE side gear assembling both side
bearing cup, bearing check nut, lock washer, Bearings, removing of oil seal and
Side cover by lifting to work place
1
-
-
Dismantling and removing the 2 Nos impeller from side cover, cleaning of
internal parts etc., and reassembling of 2nos impeller, side cover
1
-
-
Reassembling of New oil seal, bearing cup, fixing of bearing 4 nos, gear
assembling suction, delivery connection, air filter, safety valve and alignment
checking etc.
1
-
-
Re- assembling of belt pulley by lifting and fixing , and alignment checking and
successful testing and commissioning
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements